Wisconsin interconnection applications
118 electric utilities serve Wisconsin (EIA-861, 2025): 12 investor-owned utilitys, 24 electric cooperatives, 81 municipal utilitys, 1 wholesale marketer (no grid). Together they serve 2,704,830 residential customers; 21,545 residential customers were on net metering at year-end 2025.
Largest utilities in Wisconsin
Investor-owned utility · 1,056,086 residential customers · Wisconsin
Applications: PDF + email – We Energies Central Group (customer-owned generation)
Interconnection process and documents →Investor-owned utility · 440,746 residential customers · Wisconsin
Applications: PowerClerk – Alliant Energy Connect PowerClerk
Interconnection process and documents →Investor-owned utility · 415,643 residential customers · Wisconsin
Applications: PDF + email – WPS customer-owned generation
Interconnection process and documents →Investor-owned utility · 230,313 residential customers · Wisconsin
Applications: Own online portal – Xcel Energy DER interconnection portal (WI)
Interconnection process and documents →Investor-owned utility · 148,482 residential customers · Wisconsin
Applications: PowerClerk – MGE DG PowerClerk
Interconnection process and documents →Electric cooperative · 36,159 residential customers · Wisconsin
Interconnection process and documents →Electric cooperative · 20,584 residential customers · Wisconsin
Interconnection process and documents →Electric cooperative · 19,395 residential customers · Wisconsin
Interconnection process and documents →Electric cooperative · 19,120 residential customers · Wisconsin
Interconnection process and documents →Electric cooperative · 17,139 residential customers · Wisconsin
Interconnection process and documents →Municipal utility · 17,082 residential customers · Wisconsin
Applications: PowerClerk – PowerClerk
Interconnection process and documents →Municipal utility · 16,169 residential customers · Wisconsin
Interconnection process and documents →Export compensation among the researched Wisconsin utilities: Net billing, NEM. Rules differ by utility – see each utility page.
Wisconsin interconnection rule
Public Service Commission of Wisconsin
Interconnection ruleWis. Admin. Code ch. PSC 119 (implements s. 196.496, Stats.) – Rules for Interconnecting Distributed Generation Facilities · source
Applies toAll electric public utilities (investor-owned and municipal utilities, which are public utilities under ch. 196) for DG facilities <=15 MW on their distribution systems. Electric cooperatives are not public utilities under ch. 196 and are not covered.
Application formStatewide standard forms: Form 6031 Wisconsin Standard Distributed Generation Application (+ technology supplements: solar PV, wind, energy storage, generator, change of ownership); Form 6029 Interconnection Agreement (<=20 kW), Form 6030 (20 kW-15 MW); pre-application Forms 6032/6033 (all dated 2024-05-01)
TimelinesUtility furnishes guidelines and standard form within 5 working days of request; completeness notice within 10 working days of application + fee; application review within 10 working days of completeness (if no engineering review needed, applicant may install); applicant has 15 working days to accept engineering review estimate; engineering review 10/15/20/40 working days for Cat. 1/2/3/4; distribution study 10/15/20 working days (Cat. 1-3). Modifications: advance notice 20/40/60 working days; utility response 20/40/60/60 working days or deemed approved.
FeesTable PSC 119.08-1: Cat. 1 $150 (1-8 kW) or $300 (9-20 kW); Cat. 2 $300 + $10/kW; Cat. 3 $2,000 + $2/kW; Cat. 4 $4,000 + $0.50/kW; engineering review and distribution study cost-based; commissioning fee $150/$250/$1,000/$2,500. Utility may waive.
InsuranceMinimum liability insurance per occurrence: Cat. 1 $300,000; Cat. 2 $1,000,000; Cat. 3 $2,000,000; Cat. 4 negotiated. Cat. 2-4 must name the utility as additional insured. Alternative financial responsibility by mutual agreement.
External disconnectUtility may require a lockable, visible-break interconnection disconnect switch opening all ungrounded poles, accessible at all times and labeled 'Interconnection Disconnect Switch' (PSC 119.20(3)-(4)); one-line diagram and site plan must show the switch location.
Export compensationUtility-specific – No statewide net metering statute; PSC-approved parallel generation / net metering tariffs of each utility
PSC: net metering available to customers of investor-owned and municipal utilities below a utility-specific size threshold; buyback rates set in each utility's parallel generation tariff.
Municipal utilities are bound by PSC 119 and file PSC-approved tariffs. Electric cooperatives are not PSC-regulated public utilities and set their own interconnection and net metering/buyback policies.
| Level | Up to | Criteria / review / fee |
|---|---|---|
| Category 1 | 20 kW | export capacity <=20 kW (resource <=20 kW plus non-exporting storage <=20 kW also Category 1) · completeness 10 working days; application review 10 working days after complete; engineering review 10 working days · application review $150 (1-8 kW) / $300 (9-20 kW); commissioning $150; engineering/study cost-based |
| Category 2 | 200 kW | export >20 kW to 200 kW · engineering review 15 working days; study 15 working days · $300 + $10/kW; commissioning $250 |
| Category 3 | 1000 kW | export >200 kW to 1 MW · engineering review 20 working days; study 20 working days · $2,000 + $2/kW; commissioning $1,000 |
| Category 4 | 15000 kW | export >1 MW to 15 MW · engineering review 40 working days · $4,000 + $0.50/kW; commissioning $2,500 |
- Wis. Admin. Code ch. PSC 119 (archive.org copy, Register Jan. 2025 No. 829): https://web.archive.org/web/20260113134928/https://docs.legis.wisconsin.gov/code/admin_code/psc/119.pdf (retrieved 2026-11-13)
- PSC of Wisconsin - Customer-Owned Generation (forms 6029-6033): https://psc.wi.gov/Pages/ForConsumers/MoreResources/CustomerOwnedGeneration.aspx (retrieved 2026-11-13)
All 118 utilities in Wisconsin
- We Energies1,056,086
- Alliant Energy (Wisconsin)440,746
- Wisconsin Public Service (WPS)415,643
- Xcel Energy (Wisconsin/Michigan)222,746
- MGE148,482
- Adams-Columbia Electric Cooperative36,159
- Polk-Burnett Electric Cooperative20,584
- Barron Electric Cooperative19,395
- Riverland Energy Cooperative19,120
- Oakdale Electric Cooperative17,139
- Sun Prairie Utilities17,082
- Manitowoc Public Utilities16,169
- City of Kaukauna (WI)14,872
- Scenic Rivers Energy Cooperative13,655
- Superior Water, Light & Power (SWL&P)13,290
- Northwestern Wisconsin Electric Co (NWE)12,999
- Wisconsin Rapids W W & L Comm12,347
- City of Marshfield11,974
- Dahlberg Light & Power11,001
- Oconomowoc Utilities10,391
- Clark Electric Cooperative9,616
- Dunn County Electric Cooperative9,542
- City of Menasha8,683
- City of Stoughton8,338
- City of Sturgeon Bay7,865
- Rock Energy Cooperative7,409
- City of Plymouth7,331
- Hartford Electric7,039
- City of River Falls6,914
- Village of Waunakee6,906
- Cedarburg Light & Water Comm6,168
- Two Rivers Water & Light5,581
- East Central Energy5,201
- City of New Richmond5,089
- North Central Power Co5,063
- Shawano Municipal Utilities4,977
- Reedsburg Utility Comm4,956
- Lake Mills Light & Water4,134
- Waupun Utilities3,957
- Jefferson Utilities3,752
- Village of Mt. Horeb3,644
- City of Evansville3,549
- New London Electric&Water Utility3,539
- Slinger Utilities2,830
- City of Columbus2,468
- City of Richland Center2,431
- City of New Holstein2,248
- City of Black River Falls2,244
- Pioneer Power and Light2,021
- Village of Prairie Du Sac1,919
- Algoma Utility Comm1,702
- Waterloo Light & Water Comm1,621
- Brodhead Water & Lighting Comm1,549
- City of Lodi1,500
- City of Boscobel1,453
- Florence Utility Comm1,432
- Oconto Falls Water & Light Comm1,366
- Hustisford Utilities1,318
- Village of New Glarus1,100
- City of Eagle River1,065
- City of Westby1,056
- City of Cuba City998
- Juneau Utility Comm968
- Village of Muscoda934
- Whitehall Electric Utility782
- Westfield Electric Co622
- Consolidated Water Power Co70
- Eau Claire Electric Cooperative0
- St Croix Electric Cooperative0
- Vernon Electric Cooperative0
- Oconto Electric Cooperative0
- Jump River Electric Cooperative Inc.0
- Bayfield Electric Cooperative, Inc.0
- Price Electric Cooperative Inc.0
- Central Wisconsin Electric Cooperative0
- Chippewa Valley Electric Cooperative0
- Pierce-Pepin Cooperative Services0
- Jackson Electric Cooperative, Inc.0
- Rice Lake Utilities0
- City of Sheboygan Falls0
- City of Elkhorn0
- Taylor Electric Cooperative0
- City of Medford0
- Richland Electric Cooperative0
- City of Clintonville0
- City of Kiel0
- Wisconsin Dells Electric Utility0
- Bloomer Electric & Water Company0
- Village of Bangor0
- Village of Sauk City0
- City of Spooner0
- City of Barron0
- City of Arcadia0
- City of Fennimore0
- Village of Black Earth0
- Village of Trempealeau0
- City of Cumberland0
- Village of Pardeeville0
- Village of Gresham0
- Washington Island El Cooperative, Inc.0
- City of New Lisbon (WI)0
- Village of Stratford0
- Village of Mazomanie0
- City of Princeton0
- City of Cornell0
- Village of Cadott0
- City of Elroy0
- City of Shullsburg0
- Village of Cashton0
- Village of Hazel Green0
- Village of Benton0
- Village of Belmont0
- La Farge Municipal Electric Company0
- Village of Viola0
- City of Argyle0
- Wonewoc Electric & Water Utility0
- Village of Merrillan0
- Badger Power Marketing Authority0
Residential customers in Wisconsin per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.