Wisconsin interconnection applications

118 electric utilities serve Wisconsin (EIA-861, 2025): 12 investor-owned utilitys, 24 electric cooperatives, 81 municipal utilitys, 1 wholesale marketer (no grid). Together they serve 2,704,830 residential customers; 21,545 residential customers were on net metering at year-end 2025.

Largest utilities in Wisconsin

We EnergiesProcess verified

Investor-owned utility · 1,056,086 residential customers · Wisconsin

Applications: PDF + email – We Energies Central Group (customer-owned generation)

Interconnection process and documents →
Alliant Energy (Wisconsin)Process verified

Investor-owned utility · 440,746 residential customers · Wisconsin

Applications: PowerClerk – Alliant Energy Connect PowerClerk

Interconnection process and documents →
Wisconsin Public Service (WPS)Process verified

Investor-owned utility · 415,643 residential customers · Wisconsin

Applications: PDF + email – WPS customer-owned generation

Interconnection process and documents →
Xcel Energy (Wisconsin/Michigan)Partly researched

Investor-owned utility · 230,313 residential customers · Wisconsin

Applications: Own online portal – Xcel Energy DER interconnection portal (WI)

Interconnection process and documents →
MGEProcess verified

Investor-owned utility · 148,482 residential customers · Wisconsin

Applications: PowerClerk – MGE DG PowerClerk

Interconnection process and documents →
Adams-Columbia Electric CooperativeState guidance

Electric cooperative · 36,159 residential customers · Wisconsin

Interconnection process and documents →
Polk-Burnett Electric CooperativeState guidance

Electric cooperative · 20,584 residential customers · Wisconsin

Interconnection process and documents →
Barron Electric CooperativeState guidance

Electric cooperative · 19,395 residential customers · Wisconsin

Interconnection process and documents →
Riverland Energy CooperativeState guidance

Electric cooperative · 19,120 residential customers · Wisconsin

Interconnection process and documents →
Oakdale Electric CooperativeState guidance

Electric cooperative · 17,139 residential customers · Wisconsin

Interconnection process and documents →
Sun Prairie UtilitiesState rule applies

Municipal utility · 17,082 residential customers · Wisconsin

Applications: PowerClerk – PowerClerk

Interconnection process and documents →
Manitowoc Public UtilitiesState rule applies

Municipal utility · 16,169 residential customers · Wisconsin

Interconnection process and documents →

Export compensation among the researched Wisconsin utilities: Net billing, NEM. Rules differ by utility – see each utility page.

Wisconsin interconnection rule

Commission

Public Service Commission of Wisconsin

Interconnection rule

Wis. Admin. Code ch. PSC 119 (implements s. 196.496, Stats.) – Rules for Interconnecting Distributed Generation Facilities · source

Applies to

All electric public utilities (investor-owned and municipal utilities, which are public utilities under ch. 196) for DG facilities <=15 MW on their distribution systems. Electric cooperatives are not public utilities under ch. 196 and are not covered.

Application form

Statewide standard forms: Form 6031 Wisconsin Standard Distributed Generation Application (+ technology supplements: solar PV, wind, energy storage, generator, change of ownership); Form 6029 Interconnection Agreement (<=20 kW), Form 6030 (20 kW-15 MW); pre-application Forms 6032/6033 (all dated 2024-05-01)

Timelines

Utility furnishes guidelines and standard form within 5 working days of request; completeness notice within 10 working days of application + fee; application review within 10 working days of completeness (if no engineering review needed, applicant may install); applicant has 15 working days to accept engineering review estimate; engineering review 10/15/20/40 working days for Cat. 1/2/3/4; distribution study 10/15/20 working days (Cat. 1-3). Modifications: advance notice 20/40/60 working days; utility response 20/40/60/60 working days or deemed approved.

Fees

Table PSC 119.08-1: Cat. 1 $150 (1-8 kW) or $300 (9-20 kW); Cat. 2 $300 + $10/kW; Cat. 3 $2,000 + $2/kW; Cat. 4 $4,000 + $0.50/kW; engineering review and distribution study cost-based; commissioning fee $150/$250/$1,000/$2,500. Utility may waive.

Insurance

Minimum liability insurance per occurrence: Cat. 1 $300,000; Cat. 2 $1,000,000; Cat. 3 $2,000,000; Cat. 4 negotiated. Cat. 2-4 must name the utility as additional insured. Alternative financial responsibility by mutual agreement.

External disconnect

Utility may require a lockable, visible-break interconnection disconnect switch opening all ungrounded poles, accessible at all times and labeled 'Interconnection Disconnect Switch' (PSC 119.20(3)-(4)); one-line diagram and site plan must show the switch location.

Export compensation

Utility-specific – No statewide net metering statute; PSC-approved parallel generation / net metering tariffs of each utility
PSC: net metering available to customers of investor-owned and municipal utilities below a utility-specific size threshold; buyback rates set in each utility's parallel generation tariff.

Not bound by the rule

Municipal utilities are bound by PSC 119 and file PSC-approved tariffs. Electric cooperatives are not PSC-regulated public utilities and set their own interconnection and net metering/buyback policies.

LevelUp toCriteria / review / fee
Category 120 kWexport capacity <=20 kW (resource <=20 kW plus non-exporting storage <=20 kW also Category 1) · completeness 10 working days; application review 10 working days after complete; engineering review 10 working days · application review $150 (1-8 kW) / $300 (9-20 kW); commissioning $150; engineering/study cost-based
Category 2200 kWexport >20 kW to 200 kW · engineering review 15 working days; study 15 working days · $300 + $10/kW; commissioning $250
Category 31000 kWexport >200 kW to 1 MW · engineering review 20 working days; study 20 working days · $2,000 + $2/kW; commissioning $1,000
Category 415000 kWexport >1 MW to 15 MW · engineering review 40 working days · $4,000 + $0.50/kW; commissioning $2,500

All 118 utilities in Wisconsin

Residential customers in Wisconsin per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited