Investor-owned utility

Alliant Energy (Wisconsin) interconnection application

Alliant Energy (Wisconsin) is an investor-owned utility serving 440,746 residential customers in Wisconsin (EIA-861, 2025). Applications: PowerClerk (Alliant Energy Connect PowerClerk). Gridpol files Alliant Energy (Wisconsin) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Alliant Energy (Wisconsin)’s official sources (see below). PSC 119 application fee amounts not on page; storage specifics not extracted.

Alliant Energy (Wisconsin) at a glance

Utility

Wisconsin Power & Light Co (Alliant Energy)

Type

Investor-owned utility

EIA utility ID

20856

Residential customers

440,746 (EIA-861, 2025)

Net-metered residential customers

5,447 (EIA-861, 2025)

Service territory

35 counties in Wisconsin

How to apply

PowerClerk – Alliant Energy Connect PowerClerk · official link

Who submits

Installer usually submits on customer's behalf; customer may apply via PowerClerk or by mail (Renewable Hotline, Cedar Rapids). Electric Service Provider on form must read Wisconsin Power and Light Company.

Export compensation

NEM – PgS-3 (≤20 kW AC)
Meter netting; net overproduction credited at pricing-period rate (avg $0.04254/kWh as of 1/1/2026). PgS-1 >20 kW: export credited at low/regular/high rate.

Review time (official)

Completeness within 10 working days; engineering review determination within 10 business days (PSC 119).

Documents Alliant Energy (Wisconsin) asks for

  • Interconnection application formWisconsin Standard DG Application (Forms 6027/6028 in PowerClerk until Form 6031 incorporated) Gridpol prepares this.
  • Proof of insuranceCat 1 ≤20 kW $300,000; Cat 2 $1M; Cat 3 $2M; Cat 2-4 must name WPL as additional insured
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutPlot plan Gridpol prepares this.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • PV module spec sheetManufacturer data sheet of the modules.
  • Recent electric bill (when applicable)Usage history
  • Interconnection agreementSigned before operation
  • Other utility-specific documentTest results at commissioning

How the Alliant Energy (Wisconsin) process runs

  1. Research/usage history
  2. Submit via PowerClerk (design check in DG Assist)
  3. Completeness (10 working days)
  4. Engineering review decision (10 BD); study/upgrades if needed
  5. Interconnection Approval Memorandum → install
  6. Notify Alliant, pay commissioning fee, submit test results, witness test
  7. Sign Interconnection Agreement → Permission to Operate notice

Fees

FeeApplies toNote
$300Pre-application (Form 6032 + NDA, by email)
quotedEngineering review, study, commissioning fee

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Category 120 kW
Category 2200 kW
Category 31000 kW
Category 415000 kW
Net metering cap20 kW

PgS-3 net billing ≤20 kW AC; PgS-1 >20 kW to 5,000 kW

Storage, EV and stamps

Battery storage

Not addressed on page; Alliant DER Technical Interconnection Requirements apply.

Common issues the utility lists

  • Incomplete application returned
  • Unsigned documents
  • Missing payment
  • Missing usage history
  • Component swaps without notice / non-UL
  • Constant PF instead of Volt-VAR slows review

Gridpol’s pre-submission check covers these before we file.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited