Wonewoc Electric & Water Utility interconnection application

Wonewoc Electric & Water Utility is a municipal utility serving 439 customers in Wisconsin (EIA-861, 2025). Gridpol files Wonewoc Electric & Water Utility interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Wisconsin’s interconnection rule (Wis. Admin. Code ch. PSC 119 (implements s. 196.496, Stats.)) applies to Wonewoc Electric & Water Utility. Levels, timelines and documents below come from that rule; Wonewoc Electric & Water Utility’s own form and portal are confirmed on the first project.

Wonewoc Electric & Water Utility at a glance

Utility

Wonewoc Electric & Water Util

Type

Municipal utility

EIA utility ID

20924

Customers

439 (EIA-861, 2025, short form: all customer classes)

Net-metered residential customers

none reported

Service territory

1 county in Wisconsin

Documents Wonewoc Electric & Water Utility asks for

  • Interconnection application formRequired by the state rule Gridpol prepares this.
  • Single-line diagram (one-line)Required by the state rule Gridpol prepares this.
  • Site plan / site layoutRequired by the state rule Gridpol prepares this.
  • Inverter spec sheetRequired by the state rule
  • UL 1741 / IEEE 1547 certificationRequired by the state rule
  • Interconnection agreementRequired by the state rule
  • Proof of insuranceRequired by the state rule

Documents required by the Wisconsin rule. Wonewoc Electric & Water Utility may ask for more on its own form; we confirm on the first project.

Wisconsin interconnection rule

Commission

Public Service Commission of Wisconsin

Interconnection rule

Wis. Admin. Code ch. PSC 119 (implements s. 196.496, Stats.) – Rules for Interconnecting Distributed Generation Facilities · source

Applies to

All electric public utilities (investor-owned and municipal utilities, which are public utilities under ch. 196) for DG facilities <=15 MW on their distribution systems. Electric cooperatives are not public utilities under ch. 196 and are not covered.

Application form

Statewide standard forms: Form 6031 Wisconsin Standard Distributed Generation Application (+ technology supplements: solar PV, wind, energy storage, generator, change of ownership); Form 6029 Interconnection Agreement (<=20 kW), Form 6030 (20 kW-15 MW); pre-application Forms 6032/6033 (all dated 2024-05-01)

Timelines

Utility furnishes guidelines and standard form within 5 working days of request; completeness notice within 10 working days of application + fee; application review within 10 working days of completeness (if no engineering review needed, applicant may install); applicant has 15 working days to accept engineering review estimate; engineering review 10/15/20/40 working days for Cat. 1/2/3/4; distribution study 10/15/20 working days (Cat. 1-3). Modifications: advance notice 20/40/60 working days; utility response 20/40/60/60 working days or deemed approved.

Fees

Table PSC 119.08-1: Cat. 1 $150 (1-8 kW) or $300 (9-20 kW); Cat. 2 $300 + $10/kW; Cat. 3 $2,000 + $2/kW; Cat. 4 $4,000 + $0.50/kW; engineering review and distribution study cost-based; commissioning fee $150/$250/$1,000/$2,500. Utility may waive.

Insurance

Minimum liability insurance per occurrence: Cat. 1 $300,000; Cat. 2 $1,000,000; Cat. 3 $2,000,000; Cat. 4 negotiated. Cat. 2-4 must name the utility as additional insured. Alternative financial responsibility by mutual agreement.

External disconnect

Utility may require a lockable, visible-break interconnection disconnect switch opening all ungrounded poles, accessible at all times and labeled 'Interconnection Disconnect Switch' (PSC 119.20(3)-(4)); one-line diagram and site plan must show the switch location.

Export compensation

Utility-specific – No statewide net metering statute; PSC-approved parallel generation / net metering tariffs of each utility
PSC: net metering available to customers of investor-owned and municipal utilities below a utility-specific size threshold; buyback rates set in each utility's parallel generation tariff.

Not bound by the rule

Municipal utilities are bound by PSC 119 and file PSC-approved tariffs. Electric cooperatives are not PSC-regulated public utilities and set their own interconnection and net metering/buyback policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.