Investor-owned utilityWestfield Electric Co interconnection application
Westfield Electric Co is an investor-owned utility serving 622 residential customers in Wisconsin (EIA-861, 2025). Gridpol files Westfield Electric Co interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. verify on first project: no utility website found (westfieldelectric.com is an unrelated CA contractor) and utility not in PSC DG contact list; PSC tariff site blocked and web-search budget exhausted. Confirm contact/submission channel, parallel generation/net metering tariff and buyback rate with the utility or PSC (608-266-5481).
Westfield Electric Co at a glance
Westfield Electric Company
TypeInvestor-owned utility
EIA utility ID40036
Residential customers622 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory1 county in Wisconsin
Who submitsPer PSC Wisconsin: contact the electric provider for its application/agreement forms and submit directly to the utility. Form 6031 applicant = legally responsible person; designer/engineer also signs; installing contractor listed. Utility-specific contact not found (not in PSC DG Points of Contact IOU list of 2/27/2026; westfieldelectric.com is an unrelated California contractor).
Review time (official)Form 6029: utility testing within 10 working days after notice of completion. PSC 119 application review timelines not extracted.
Documents Westfield Electric Co asks for
- Interconnection application formPSC Form 6031 Wisconsin Standard DG Application (eff. 5/1/2024) Gridpol prepares this.
- Other utility-specific documentSolar Photovoltaic Supplement with manufacturer data sheets; Energy Storage Supplement if battery
- Single-line diagram (one-line)One-line schematic incl. disconnect (if required), POI, meters, protection Gridpol prepares this.
- Site plan / site layoutEquipment, service entrance, meters, DG/disconnect location, street address Gridpol prepares this.
- Proof of insuranceProof of insurance; Cat 1 min $300,000, Cat 2 $1M, Cat 3 $2M (Table 119.05-1)
- UL 1741 / IEEE 1547 certificationProof of certification (e.g. UL 1741) or PSC 119.27 compliance
- Interconnection agreementForm 6029 (≤20 kW) or 6030 (>20 kW-15 MW)
How the Westfield Electric Co process runs
- Contact utility for application/agreement forms
- Submit Form 6031 + supplements, one-line, site plan, insurance proof, certification and fee
- Utility review per PSC 119
- Sign Form 6029/6030; install
- Notify utility of completion; utility commissioning test (within 10 working days) before parallel operation
Fees
| Fee | Applies to | Note |
|---|---|---|
| $150 (1-8 kW) / $300 (9-20 kW) + $150 commissioning | Category 1 ≤20 kW | PSC 119 Table 119.08-1 (statewide) |
| $300 + $10/kW + $250 commissioning | Category 2 >20-200 kW | PSC 119 Table 119.08-1 |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Category 1 | 20 kW | PSC 119 |
| Category 2 | 200 kW | |
| Category 3 | 1000 kW | |
| Category 4 | 15000 kW |
PSC 119 applies to DG ≤15 MW. Utility net metering size threshold unknown.
Storage, EV and stamps
Battery storage
PSC Energy Storage Supplement to Form 6031 applies (operating modes, export, grid charging, coupling).
Sources
- PSC Wisconsin Customer-Owned Generation: https://psc.wi.gov/Pages/ForConsumers/MoreResources/CustomerOwnedGeneration.aspx (retrieved 2026-11-13)
- PSC Form 6031 (fees, insurance, attachments): https://psc.wi.gov/Documents/Energy/DG_Form6031WisconsinStandardDistributedGenerationApplication.pdf (retrieved 2026-11-13)
- PSC Energy Storage Supplement: https://psc.wi.gov/Documents/Energy/DG_Form_EnergyStorageSupplement.pdf (retrieved 2026-11-13)
- PSC Form 6029 DG Interconnection Agreement ≤20 kW: https://psc.wi.gov/Documents/Energy/DG_Form6029DG20orLessAgreement.pdf (retrieved 2026-11-13)
- PSC DG Points of Contact (updated 2/27/2026; Westfield not listed): https://psc.wi.gov/Documents/Energy/DG_PointsofContact.pdf (retrieved 2026-11-13)
Wisconsin interconnection rule
Public Service Commission of Wisconsin
Interconnection ruleWis. Admin. Code ch. PSC 119 (implements s. 196.496, Stats.) – Rules for Interconnecting Distributed Generation Facilities · source
Applies toAll electric public utilities (investor-owned and municipal utilities, which are public utilities under ch. 196) for DG facilities <=15 MW on their distribution systems. Electric cooperatives are not public utilities under ch. 196 and are not covered.
Application formStatewide standard forms: Form 6031 Wisconsin Standard Distributed Generation Application (+ technology supplements: solar PV, wind, energy storage, generator, change of ownership); Form 6029 Interconnection Agreement (<=20 kW), Form 6030 (20 kW-15 MW); pre-application Forms 6032/6033 (all dated 2024-05-01)
TimelinesUtility furnishes guidelines and standard form within 5 working days of request; completeness notice within 10 working days of application + fee; application review within 10 working days of completeness (if no engineering review needed, applicant may install); applicant has 15 working days to accept engineering review estimate; engineering review 10/15/20/40 working days for Cat. 1/2/3/4; distribution study 10/15/20 working days (Cat. 1-3). Modifications: advance notice 20/40/60 working days; utility response 20/40/60/60 working days or deemed approved.
FeesTable PSC 119.08-1: Cat. 1 $150 (1-8 kW) or $300 (9-20 kW); Cat. 2 $300 + $10/kW; Cat. 3 $2,000 + $2/kW; Cat. 4 $4,000 + $0.50/kW; engineering review and distribution study cost-based; commissioning fee $150/$250/$1,000/$2,500. Utility may waive.
InsuranceMinimum liability insurance per occurrence: Cat. 1 $300,000; Cat. 2 $1,000,000; Cat. 3 $2,000,000; Cat. 4 negotiated. Cat. 2-4 must name the utility as additional insured. Alternative financial responsibility by mutual agreement.
External disconnectUtility may require a lockable, visible-break interconnection disconnect switch opening all ungrounded poles, accessible at all times and labeled 'Interconnection Disconnect Switch' (PSC 119.20(3)-(4)); one-line diagram and site plan must show the switch location.
Export compensationUtility-specific – No statewide net metering statute; PSC-approved parallel generation / net metering tariffs of each utility
PSC: net metering available to customers of investor-owned and municipal utilities below a utility-specific size threshold; buyback rates set in each utility's parallel generation tariff.
Municipal utilities are bound by PSC 119 and file PSC-approved tariffs. Electric cooperatives are not PSC-regulated public utilities and set their own interconnection and net metering/buyback policies.
- Wis. Admin. Code ch. PSC 119 (archive.org copy, Register Jan. 2025 No. 829): https://web.archive.org/web/20260113134928/https://docs.legis.wisconsin.gov/code/admin_code/psc/119.pdf (retrieved 2026-11-13)
- PSC of Wisconsin - Customer-Owned Generation (forms 6029-6033): https://psc.wi.gov/Pages/ForConsumers/MoreResources/CustomerOwnedGeneration.aspx (retrieved 2026-11-13)
Other utilities in Wisconsin
- We Energies1,056,086
- Alliant Energy (Wisconsin)440,746
- Wisconsin Public Service (WPS)415,643
- Xcel Energy (Wisconsin/Michigan)222,746
- MGE148,482
- Adams-Columbia Electric Cooperative36,159
- Polk-Burnett Electric Cooperative20,584
- Barron Electric Cooperative19,395
- Riverland Energy Cooperative19,120
- Oakdale Electric Cooperative17,139
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.