Investor-owned utilitySuperior Water, Light & Power (SWL&P) interconnection application
Superior Water, Light & Power (SWL&P) is an investor-owned utility serving 13,290 residential customers in Wisconsin (EIA-861, 2025). Gridpol files Superior Water, Light & Power (SWL&P) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. verify on first project: swlp.com has no interconnection page and SWL&P is not on the PSC DG points-of-contact list; confirm submission channel (email/mail/contact), any utility-specific forms, PSC 119 review timelines, storage rules.
Superior Water, Light & Power (SWL&P) at a glance
Superior Water and Light Co (ALLETE)
TypeInvestor-owned utility
EIA utility ID18336
Residential customers13,290 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory1 county in Wisconsin
Who submitsApplicant = legally responsible person applying (PSC 119.02(2)); Form 6031 has representative and installing-contractor sections. Per PSC, obtain forms from the utility and submit directly to it. Utility-specific submission channel (email/mail) not published.
Export compensationNet billing – SWL&P Electric - Parallel Generation 20 kW or less (Schedule COGS-NM, sheets E39-E41); Customer Owned Generation >20 kW (COGS-PG, E42-E44)
<=20 kW renewable: monthly netting; net monthly excess credited at avoided-cost rates (e.g. secondary $0.1457 on-peak / $0.0335 off-peak / $0.0729 avg, + PCAC; eff. 1/1/2025); pre-2018 customers grandfathered at retail until 12/31/2027. Credit <=$100 carried forward, >$100 refundable by check on request. >20 kW: $10 customer charge, paid avoided cost for all energy delivered; negotiated rates allowed. Signed contract and $300,000 liability insurance (<=20 kW) / $1,000,000 (>20 kW) required; owner pays interconnection costs. Also Superior Solar community solar.
PSC 119 timelines not extracted (Wis. legislature site unreachable). Form 6029: utility testing within 10 working days after completion notice; if waived, interconnect on notice or after 5 working days; revised application decided within 20 working days.
Documents Superior Water, Light & Power (SWL&P) asks for
- Interconnection application formWisconsin Standard DG Application Form 6031 (eff. 5/1/2024), submitted directly to the electric provider with fees (PSC 119.04(2)); signed by applicant and project designer/engineer Gridpol prepares this.
- Other utility-specific documentTechnology-based supplement + manufacturer spec sheets (Solar PV Supplement; Energy Storage Supplement if battery)
- Single-line diagram (one-line)One-line schematic incl. DG equipment, disconnect (if required), point of interconnection, meters, protection (Form 6031 item 14b) Gridpol prepares this.
- Site plan / site layoutSite plan with equipment, service entrance, meters, DG/interface/protection equipment, disconnect location, street name/address (14c) Gridpol prepares this.
- Proof of insuranceProof of insurance (14d); PSC Table 119.05-1 minimum: Cat 1 $300,000, Cat 2 $1,000,000, Cat 3 $2,000,000, Cat 4 negotiated
- UL 1741 / IEEE 1547 certificationProof of equipment certification (e.g. UL 1741) or compliance with PSC 119.27 (14e)
- Interconnection agreementForm 6029 (<=20 kW) or 6030 (>20 kW-15 MW), signed before parallel operation
How the Superior Water, Light & Power (SWL&P) process runs
- Contact the utility for its current application and interconnection agreement forms (PSC: online forms are informational).
- Submit Form 6031 + technology supplement(s), one-line diagram, site plan, proof of insurance, equipment certification and application fee directly to the utility.
- Utility completeness/engineering review per PSC 119; utility approves the application.
- Sign interconnection contract/agreement (Form 6029/6030; tariff requires signed contract) before parallel operation; ratchet removed / net-capable metering installed (COGS-NM).
- Install; applicant notifies utility in writing that installation is complete and equipment is available for testing.
- Utility commissioning test within 10 working days; if utility waives testing, applicant may interconnect on utility notification or 5 working days after its completion notice (Form 6029 sec. 7).
Fees
| Fee | Applies to | Note |
|---|---|---|
| $150 | Category 1, 1-8 kW export capacity | Application review fee, PSC Table 119.08-1 (Form 6031); engineering review/study cost based; commissioning fee $150 |
| $300 | Category 1, 9-20 kW | Application review fee; commissioning $150 |
| $300 + $10/kW | Category 2, >20-200 kW | Application review fee; commissioning $250; engineering/study cost based |
| $2,000 + $2/kW | Category 3, >200 kW-1 MW | Commissioning $1,000 |
| $4,000 + $0.50/kW | Category 4, >1-15 MW | Commissioning $2,500 |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Category 1 | 20 kW | PSC 119 |
| Category 2 | 200 kW | |
| Category 3 | 1000 kW | |
| Category 4 | 15000 kW | |
| Net metering cap | 20 kW |
PSC 119 applies to DG <=15 MW AC. SWL&P tariff: COGS-NM net energy billing for <=20 kW (AC nameplate of generator/inverter); COGS-PG >20 kW sells at avoided cost or negotiated buy-back.
Storage, EV and stamps
Battery storage
PSC Energy Storage Supplement to Form 6031 required: nameplate kW/kWh, operating modes available/enabled, whether system exports and charges from grid, AC vs DC coupling. Utility-specific storage rules not published.
Sources
- SWL&P Rate Book - Schedules COGS-NM (E39-E41) and COGS-PG (E42-E44): https://swlp.blob.core.windows.net/content/Content/Documents/CustomerService/ratebook.pdf (retrieved 2026-11-13)
- SWL&P - Electric Rates & Extension Rules (links rate book): https://www.swlp.com/CustomerService/ElectricRatesExtensionRules (retrieved 2026-11-13)
- PSC Wisconsin - Customer-Owned Generation (PSC 119, forms 6029-6033; contact utility for forms, submit directly to utility): https://psc.wi.gov/Pages/ForConsumers/MoreResources/CustomerOwnedGeneration.aspx (retrieved 2026-11-13)
- PSC Form 6031 Wisconsin Standard DG Application (eff. 5/1/2024; fees Table 119.08-1, insurance Table 119.05-1, required attachments): https://psc.wi.gov/Documents/Energy/DG_Form6031WisconsinStandardDistributedGenerationApplication.pdf (retrieved 2026-11-13)
- PSC Form 6029 DG Interconnection Agreement (20 kW or less) - commissioning testing sec. 7: https://psc.wi.gov/Documents/Energy/DG_Form6029DG20orLessAgreement.pdf (retrieved 2026-11-13)
- PSC Energy Storage Supplement (operating modes, export/grid charging, AC/DC coupling): https://psc.wi.gov/Documents/Energy/DG_Form_EnergyStorageSupplement.pdf (retrieved 2026-11-13)
- PSC Distributed Generation Points of Contact (updated Feb 27, 2026) - utility not listed: https://psc.wi.gov/Documents/Energy/DG_PointsofContact.pdf (retrieved 2026-11-13)
- SWL&P Superior Solar (community solar): https://www.swlp.com/CustomerService/SuperiorSolar (retrieved 2026-11-13)
Wisconsin interconnection rule
Public Service Commission of Wisconsin
Interconnection ruleWis. Admin. Code ch. PSC 119 (implements s. 196.496, Stats.) – Rules for Interconnecting Distributed Generation Facilities · source
Applies toAll electric public utilities (investor-owned and municipal utilities, which are public utilities under ch. 196) for DG facilities <=15 MW on their distribution systems. Electric cooperatives are not public utilities under ch. 196 and are not covered.
Application formStatewide standard forms: Form 6031 Wisconsin Standard Distributed Generation Application (+ technology supplements: solar PV, wind, energy storage, generator, change of ownership); Form 6029 Interconnection Agreement (<=20 kW), Form 6030 (20 kW-15 MW); pre-application Forms 6032/6033 (all dated 2024-05-01)
TimelinesUtility furnishes guidelines and standard form within 5 working days of request; completeness notice within 10 working days of application + fee; application review within 10 working days of completeness (if no engineering review needed, applicant may install); applicant has 15 working days to accept engineering review estimate; engineering review 10/15/20/40 working days for Cat. 1/2/3/4; distribution study 10/15/20 working days (Cat. 1-3). Modifications: advance notice 20/40/60 working days; utility response 20/40/60/60 working days or deemed approved.
FeesTable PSC 119.08-1: Cat. 1 $150 (1-8 kW) or $300 (9-20 kW); Cat. 2 $300 + $10/kW; Cat. 3 $2,000 + $2/kW; Cat. 4 $4,000 + $0.50/kW; engineering review and distribution study cost-based; commissioning fee $150/$250/$1,000/$2,500. Utility may waive.
InsuranceMinimum liability insurance per occurrence: Cat. 1 $300,000; Cat. 2 $1,000,000; Cat. 3 $2,000,000; Cat. 4 negotiated. Cat. 2-4 must name the utility as additional insured. Alternative financial responsibility by mutual agreement.
External disconnectUtility may require a lockable, visible-break interconnection disconnect switch opening all ungrounded poles, accessible at all times and labeled 'Interconnection Disconnect Switch' (PSC 119.20(3)-(4)); one-line diagram and site plan must show the switch location.
Export compensationUtility-specific – No statewide net metering statute; PSC-approved parallel generation / net metering tariffs of each utility
PSC: net metering available to customers of investor-owned and municipal utilities below a utility-specific size threshold; buyback rates set in each utility's parallel generation tariff.
Municipal utilities are bound by PSC 119 and file PSC-approved tariffs. Electric cooperatives are not PSC-regulated public utilities and set their own interconnection and net metering/buyback policies.
- Wis. Admin. Code ch. PSC 119 (archive.org copy, Register Jan. 2025 No. 829): https://web.archive.org/web/20260113134928/https://docs.legis.wisconsin.gov/code/admin_code/psc/119.pdf (retrieved 2026-11-13)
- PSC of Wisconsin - Customer-Owned Generation (forms 6029-6033): https://psc.wi.gov/Pages/ForConsumers/MoreResources/CustomerOwnedGeneration.aspx (retrieved 2026-11-13)
Other utilities in Wisconsin
- We Energies1,056,086
- Alliant Energy (Wisconsin)440,746
- Wisconsin Public Service (WPS)415,643
- Xcel Energy (Wisconsin/Michigan)222,746
- MGE148,482
- Adams-Columbia Electric Cooperative36,159
- Polk-Burnett Electric Cooperative20,584
- Barron Electric Cooperative19,395
- Riverland Energy Cooperative19,120
- Oakdale Electric Cooperative17,139
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks