Arizona interconnection applications
42 electric utilities serve Arizona (EIA-861, 2025): 6 investor-owned utilitys, 14 public power districts, 10 electric cooperatives, 2 state power authoritys, 7 municipal utilitys, 3 federal power agencys. Together they serve 3,158,829 residential customers; 333,870 residential customers were on net metering at year-end 2025.
Largest utilities in Arizona
Investor-owned utility · 1,287,097 residential customers · Arizona
Applications: PowerClerk – APS Interconnection (PowerClerk)
Interconnection process and documents →Public power district · 1,074,095 residential customers · Arizona
Applications: PowerClerk – SRP Interconnect (PowerClerk)
Interconnection process and documents →Investor-owned utility · 416,268 residential customers · Arizona
Applications: PowerClerk – TEP PowerClerk
Interconnection process and documents →Investor-owned utility · 95,288 residential customers · Arizona
Applications: PowerClerk – UniSource Energy Services PowerClerk
Interconnection process and documents →Electric cooperative · 53,721 residential customers · Arizona
Applications: PowerClerk – PowerClerk
Interconnection process and documents →Electric cooperative · 46,398 residential customers · Arizona
Interconnection process and documents →Electric cooperative · 41,741 residential customers · Arizona
Interconnection process and documents →Electric cooperative · 42,295 residential customers · Arizona
Interconnection process and documents →Public power district · 32,951 residential customers · Arizona
Interconnection process and documents →State power authority · 38,553 residential customers · Arizona
Interconnection process and documents →Municipal utility · 15,507 residential customers · Arizona
Interconnection process and documents →Federal power agency · 12,018 residential customers · Arizona
Interconnection process and documents →Export compensation among the researched Arizona utilities: Net billing. Rules differ by utility – see each utility page.
Arizona interconnection rule
Arizona Corporation Commission (ACC)
Interconnection ruleA.A.C. R14-2-2601 through R14-2-2628 (Title 14, Ch. 2, Article 26) – Interconnection of Distributed Generation Facilities · source
Applies toGenerating facilities operating in parallel with the distribution system of an ACC-jurisdictional utility (public service corporations: IOUs such as APS, TEP, UNS Electric, and electric cooperatives; cooperatives may use Commission-approved Interconnection Manual timelines per R14-2-2627). Not SRP or municipal utilities (not ACC-jurisdictional).
Application formUtility-specific application 'on a form provided by the Utility, or according to a format provided by the Utility' (R14-2-2614); utility Interconnection Manuals required (R14-2-2628).
TimelinesCompleteness review 7 calendar days (applicant has 30 days to cure). Level 1 review 14 days, Level 2 review 21 days. Interconnection agreement sent within 7 days of approval; site inspection within 7 days of request; approval/failure notice within 3 days after inspection and signed documents; re-inspection within 14 days; application may be deemed withdrawn if not interconnected within 180 days of approval (R14-2-2614, -2617, -2618, -2621). Non-exporting storage and inadvertent-export systems <=20 kW exempt from R14-2-2614 application requirements; Expedited process in R14-2-2623.
FeesApplication/processing, additional-review, inspection and metering fees only if contained in a Commission-approved tariff (R14-2-2614, -2617, -2618, -2621). Customer pays required utility facility/equipment modifications.
InsuranceUtility shall not require general liability insurance as condition of interconnection, nor a particular insurer (R14-2-2607); exception: RUS-financed utilities (cooperatives) may require liability insurance to the extent needed for RUS obligations.
External disconnectIf required by the utility, customer installs a visual-open, manually operated, load-break disconnect switch isolating all ungrounded conductors (gang-operated for multi-phase); utility may add requirements in its Interconnection Manual (R14-2-2624). Inspection checks 24-hour utility access to disconnect (R14-2-2621).
Export compensationNet billing – A.A.C. R14-2-2301 et seq. (Net Metering rules, eff. 2009); ACC Decision No. 75859 (Jan. 3, 2017)
Decision 75859 replaced retail net metering for new customer-generators of ACC-regulated utilities with an export rate initially set by the Resource Comparison Proxy (RCP) methodology, changes limited to 10%/year; existing NEM customers grandfathered. Exact implementation is utility-tariff specific (APS, TEP, UNSE RCP riders). Details from secondary summaries; decision text not retrieved.
Electric cooperatives are bound by Article 26 but may substitute timelines via Commission-approved Interconnection Manuals and must use best reasonable efforts to meet deadlines (R14-2-2627). SRP and municipal utilities are not ACC-regulated and follow their own interconnection and export-rate policies.
| Level | Up to | Criteria / review / fee |
|---|---|---|
| Level 1 Super Fast Track (R14-2-2617) | 20 kW | Inverter-based, Certified Equipment only, must pass screens R14-2-2615(A),(E),(F) · 14 calendar days after completeness notice · No additional-review fee unless in Commission-approved tariff |
| Level 2 Fast Track (R14-2-2618) | 2000 kW | Maximum capacity < 2 MW (strictly less), must pass screens R14-2-2615(A)-(J); failures may go to Supplemental Review (R14-2-2620) · 21 calendar days after completeness notice · Only per Commission-approved tariff |
| Level 3 Study Track (R14-2-2619) | >= 2 MW or failed Level 1/2/Supplemental screens; optional scoping meeting, feasibility, system impact and facilities studies (45 days each) · Each study 45 days after signed agreement/payment · Customer pays study costs (good-faith estimates) and required upgrades |
- Ariz. Admin. Code Title 14, Ch. 2, Art. 26 (LII): https://www.law.cornell.edu/regulations/arizona/title-14/chapter-2/article-26 (retrieved 2026-11-13)
- R14-2-2614 Application requirements: https://www.law.cornell.edu/regulations/arizona/Ariz-Admin-Code-SS-R14-2-2614 (retrieved 2026-11-13)
- R14-2-2617 Level 1 Super Fast Track: https://www.law.cornell.edu/regulations/arizona/Ariz-Admin-Code-SS-R14-2-2617 (retrieved 2026-11-13)
- R14-2-2607 Insurance: https://www.law.cornell.edu/regulations/arizona/Ariz-Admin-Code-SS-R14-2-2607 (retrieved 2026-11-13)
- R14-2-2624 Disconnect Switch Requirements: https://www.law.cornell.edu/regulations/arizona/Ariz-Admin-Code-SS-R14-2-2624 (retrieved 2026-11-13)
- R14-2-2627 Electric Cooperatives: https://www.law.cornell.edu/regulations/arizona/Ariz-Admin-Code-SS-R14-2-2627 (retrieved 2026-11-13)
All 42 utilities in Arizona
- APS1,287,097
- SRP1,074,095
- TEP416,268
- UniSource Energy Services95,288
- Trico Electric Cooperative Inc.53,721
- Sulphur Springs Valley E C Inc.46,398
- Mohave Electric Cooperative, Inc.41,741
- Navopache Electric Cooperative, Inc.40,795
- Electrical District No3 Pinal County32,951
- Navajo Tribal Utility Authority26,978
- City of Mesa15,507
- USBIA-San Carlos Project12,018
- Electrical District No2 Pinal County5,592
- Dixie Escalante R E A, Inc.2,821
- Gila River Indian Utility Authority (GRICUA)2,707
- Morenci Water & Electric2,241
- Garkane Energy Cooperative, Inc.1,484
- Ajo Improvement Company808
- Ak-Chin Electric Utility Authority319
- SCE0
- Graham County Electric Cooperative Inc.0
- City of Safford0
- Columbus Electric Cooperative, Inc.0
- Page Utility Enterprises0
- Wellton-Mohawk Irr & Drain District0
- Tohono O'Odham Utility Authority0
- Colorado River Indian Irr Proj0
- Electrical District No4 Pinal County0
- Town of Thatcher0
- Duncan Valley Electric Cooperative, Inc.0
- City of Williams - AZ0
- Hohokam Irr & Drain District0
- Town of Wickenburg0
- Aha Macav Power Service0
- Town of Fredonia0
- Electrical District No8 Maricopa0
- WAPA-- Western Area Power Administration0
- McMullen Valley Water C&D District0
- Ocotillo Water Conserv. District.0
- Buckeye Water C&D District0
- Harquahala Valley Power District0
- Maricopa County M W C District #10
Residential customers in Arizona per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.