Home › Utilities › Texas

Texas

Texas interconnection applications

150 electric utilities serve Texas (EIA-861, 2025): 9 investor-owned utilitys, 72 municipal utilitys, 68 electric cooperatives, 1 state power authority. Together they serve 12,957,808 residential customers; 137,816 residential customers were on net metering at year-end 2025.

Largest utilities in Texas

OncorProcess verified

Investor-owned utility · 3,545,814 residential customers · Texas

Applications: Third-party portal – Oncor installer portal (eTRACK / DERTRACK, hosted by anbetrack)

Interconnection process and documents →
CenterPoint Energy Houston ElectricProcess verified

Investor-owned utility · 2,529,039 residential customers · Texas

Applications: Third-party portal – CenterPoint Energy Distribution Interconnection Portal for installers (hosted by anbetrack)

Interconnection process and documents →
CPS EnergyProcess verified

Municipal utility · 888,946 residential customers · Texas

Applications: Own online portal – CPS Energy Solar Application Site / DG Review Portal

Interconnection process and documents →
AEP Texas (Central Division)Process verified

Investor-owned utility · 793,896 residential customers · Texas

Applications: PowerClerk – AEP PowerClerk interconnection portal

Interconnection process and documents →
Austin EnergyProcess verified

Municipal utility · 522,446 residential customers · Texas

Applications: PDF + email – Distributed Generation Planning Application (DGPA) + City of Austin AB+C permit portal

Interconnection process and documents →
Entergy TexasProcess verified

Investor-owned utility · 469,094 residential customers · Texas

Applications: Own online portal – Entergy Interconnection Portal

Interconnection process and documents →
PECProcess verified

Electric cooperative · 420,753 residential customers · Texas

Applications: PowerClerk – PEC Interconnection PowerClerk

Interconnection process and documents →
El Paso ElectricProcess verified

Investor-owned utility · 417,578 residential customers · Texas

Applications: Own online portal – EPE Distributed Generation online Standard / Expansion Interconnection Application (solarium3; e-signature, online fee payment, status link)

Interconnection process and documents →
CoServProcess verified

Electric cooperative · 310,805 residential customers · Texas

Applications: Own online portal – CoServ online DG application (residential PV <=50 kW DC)

Interconnection process and documents →
TNMPProcess verified

Investor-owned utility · 237,930 residential customers · Texas

Applications: PowerClerk – TNMP DG Portal (PowerClerk)

Interconnection process and documents →
Xcel Energy (SPS)Partly researched

Investor-owned utility · 324,888 residential customers · Texas

Applications: Own online portal – Xcel Energy DER Interconnection Portal (Salesforce)

Interconnection process and documents →
AEP Texas (North Division)Process verified

Investor-owned utility · 158,488 residential customers · Texas

Applications: PowerClerk – AEP PowerClerk interconnection portal

Interconnection process and documents →

Export compensation among the researched Texas utilities: Buy-all/sell-all, Net billing, NEM. Rules differ by utility – see each utility page.

Texas interconnection rule

Commission

Public Utility Commission of Texas (PUCT)

Interconnection rule

16 TAC §25.211 (Interconnection of On-Site Distributed Generation) and §25.212 (Technical Requirements) – Interconnection of On-Site Distributed Generation (DG) · source

Applies to

Electric utilities under PUCT jurisdiction (incl. ERCOT transmission & distribution utilities such as Oncor, CenterPoint, AEP Texas, TNMP and non-ERCOT IOUs). Electric cooperatives only via §25.211(o) (distributed natural gas generation); municipal utilities not addressed.

Application form

Commission-prescribed statewide application for interconnection and parallel operation (§25.211(q) figure) and prescribed interconnection agreement (§25.211(p)); utility must file DG tariff on prescribed form (§25.211(d)). Customer must submit application and execute agreement on these forms before interconnecting (§25.211(e)(5)).

Timelines

Pre-certified: interconnect within 4 weeks of complete application; others 6 weeks; if substantial upgrades, within 2 weeks after upgrades complete (§25.211(m)); pre-interconnection studies <=4 weeks.

Fees

No separate application fee in rule; study fees in utility DG tariff; no study fee for pre-certified <=500 kW meeting (g)(1) or network inverter <20 kW; no distribution/O&M/transmission charges for exported energy (§25.211(d)).

External disconnect

§25.212(b)(8): manual disconnect accessible to utility personnel, lockable open, with visible break; no small-inverter waiver in rule text, but parties may agree otherwise or seek good-cause exception (§25.212(a)(4)).

Export compensation

None statewide – 16 TAC §25.242(h) (QF purchase arrangements, integrated IOUs only)
No statewide net metering mandate found for ERCOT competitive areas; export compensation is set by retail electric providers. For integrated (non-unbundled) IOUs, §25.242(h) provides standard-rate purchase of QF output <=100 kW; single forward/backward meter option for renewable QFs <=50 kW closed to contracts after 2008-12-31. §25.242 excludes munis, river authorities, coops.

Not bound by the rule

Municipal utilities and electric cooperatives are not bound by §25.211/§25.212 (except coop gas-DG under (o)) and set their own interconnection and net metering/buyback policies.

LevelUp toCriteria / review / fee
Pre-certified, <=500 kW (export/short-circuit limits met)500 kWPre-certified equipment meeting §25.211(g)(1) export and short-circuit limits · Interconnection within 4 weeks of completed application (§25.211(m)(1)) · No pre-interconnection study fee (§25.211(g)(1))
Network-connected inverter <20 kW20 kWInverter systems on networked secondary · No study fee (§25.211(i))
Other DG up to 10 MW at PCC, <60 kV10000 kWNon-pre-certified or larger; pre-interconnection study may be required · Interconnection within 6 weeks (§25.211(m)(2)); studies max ~4 weeks (network ~6 weeks) · Study fee per utility tariff, cost estimate before study (§25.211(g)(2))

All 150 utilities in Texas

Residential customers in Texas per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.