What we file

Every interconnection application, complete.

Solar PV, battery storage, solar + storage and EV charger requests – with the drawings and forms each utility wants.

Get started See sample drawings

  • Unlimited applications
  • SLD + site plan included
  • Filed in your name
Gridpol product video
Product video with a fictional sample project.

Solar PV

Residential and small commercial PV under the utility’s simplified or standard process, incl. net metering or net billing enrollment.

Battery storage

Standalone or paired storage with the operating mode the utility asks for: backup only, self-consumption, non-export or export.

Solar + storage

One application with PV and storage, AC- or DC-coupled, with the combined nameplate and export settings.

EV chargers

Load letters or service upgrade requests where the utility documents a process for EV charging equipment.

In every application package

Application form

Filled in from your project data, in the utility’s portal or on its form, in the customer’s and your company’s name.

Single-line diagram

Array and strings, rapid shutdown, inverter or microinverters, battery, disconnects, point of connection, main panel and meter – with NEC references.

Site plan

House, street, arrays by orientation and every equipment location: meter, main panel, inverter, AC disconnect, battery, charger.

Pre-submission check

Common rejection reasons checked before filing, plus the utility’s own document list.

Homeowner authorization

E-signature link for the customer’s authorization; NEM or net billing agreement prepared where the utility needs one.

Follow-up to PTO

Utility questions, corrections, resubmissions, approval to install, inspection sign-off and permission to operate.

Interconnection only – not permits

Gridpol covers the application to the utility. Building and electrical permit plan sets for the authority having jurisdiction are not part of Gridpol, and our drawings are not PE-stamped. Where a utility requires a PE stamp (usually larger or commercial systems), our utility pages say so and we tell you before we file.

EV chargers: many utilities have no interconnection application for chargers because they do not export. Where a utility documents a load letter, service upgrade request or EV rate enrollment, we file that. Where it does not, we tell you.
Get started – $500/month unlimited