Every interconnection application, complete.
Solar PV, battery storage, solar + storage and EV charger requests – with the drawings and forms each utility wants.
Get started See sample drawings
- Unlimited applications
- SLD + site plan included
- Filed in your name

Solar PV
Residential and small commercial PV under the utility’s simplified or standard process, incl. net metering or net billing enrollment.
Battery storage
Standalone or paired storage with the operating mode the utility asks for: backup only, self-consumption, non-export or export.
Solar + storage
One application with PV and storage, AC- or DC-coupled, with the combined nameplate and export settings.
EV chargers
Load letters or service upgrade requests where the utility documents a process for EV charging equipment.
In every application package
Application form
Filled in from your project data, in the utility’s portal or on its form, in the customer’s and your company’s name.
Single-line diagram
Array and strings, rapid shutdown, inverter or microinverters, battery, disconnects, point of connection, main panel and meter – with NEC references.
Site plan
House, street, arrays by orientation and every equipment location: meter, main panel, inverter, AC disconnect, battery, charger.
Pre-submission check
Common rejection reasons checked before filing, plus the utility’s own document list.
Homeowner authorization
E-signature link for the customer’s authorization; NEM or net billing agreement prepared where the utility needs one.
Follow-up to PTO
Utility questions, corrections, resubmissions, approval to install, inspection sign-off and permission to operate.
Interconnection only – not permits
Gridpol covers the application to the utility. Building and electrical permit plan sets for the authority having jurisdiction are not part of Gridpol, and our drawings are not PE-stamped. Where a utility requires a PE stamp (usually larger or commercial systems), our utility pages say so and we tell you before we file.