Imprint

Company information for gridpol.com.

Operator

Stage Strategy USA, Inc.
a Florida corporation
7901 4th St N, STE 300, St. Petersburg, FL 33702, USA

Represented by

Andreas Hartwig, President

Contact

Email: info@gridpol.com

Parent company

Stage Strategy USA, Inc. is a subsidiary of Stage Strategy GmbH, Görlitzer Ring 31, 23879 Mölln, Germany.

Note

Gridpol prepares and files utility interconnection applications for licensed solar, battery storage and EV charger installers, using the installer’s portal accounts and documents. Gridpol is not an electrical contractor and holds no electrical license; applications are filed under the installer’s license. Gridpol Unlimited: $500 per month for unlimited interconnection applications on a 12-month agreement with Stage Strategy USA, Inc.. Utility approval, timelines and fees are decided by each utility. Drawings are not stamped by a professional engineer. Gridpol is not affiliated with any utility or software vendor named on this site.

Get started – $500/month unlimited