Home › Utilities › Florida

Florida

Florida interconnection applications

52 electric utilities serve Florida (EIA-861, 2025): 4 investor-owned utilitys, 32 municipal utilitys, 16 electric cooperatives. Together they serve 10,600,037 residential customers; 319,411 residential customers were on net metering at year-end 2025.

Largest utilities in Florida

FPLProcess verified

Investor-owned utility · 5,337,118 residential customers · Florida

Applications: Own online portal – FPL Net Metering online application (My Account)

Interconnection process and documents →
Duke Energy FloridaPartly researched

Investor-owned utility · 1,819,962 residential customers · Florida

Interconnection process and documents →
Tampa ElectricProcess verified

Investor-owned utility · 768,806 residential customers · Florida

Applications: Own online portal – Tampa Electric online solar / battery / combo interconnection application

Interconnection process and documents →
JEAPartly researched

Municipal utility · 479,288 residential customers · Florida

Applications: PowerClerk – JEA PowerClerk (linked from Apply for Distributed Generation page)

Interconnection process and documents →
OUCProcess verified

Municipal utility · 254,552 residential customers · Florida

Applications: Own online portal – OUC Contractor Portal

Interconnection process and documents →
SECO EnergyProcess verified

Electric cooperative · 240,241 residential customers · Florida

Applications: Own online portal – SECO Energy online interconnection application (member account; contractors can register)

Interconnection process and documents →
LCECProcess verified

Electric cooperative · 236,578 residential customers · Florida

Applications: Own online portal – LCEC electronic Interconnection Agreement + secure document upload

Interconnection process and documents →
WRECProcess verified

Electric cooperative · 231,677 residential customers · Florida

Applications: PDF + email – Application for Operation of Renewable Generation System (RGS) + Net Metering Agreement, emailed to rgs@wrec.net

Interconnection process and documents →
Clay ElectricProcess verified

Electric cooperative · 173,966 residential customers · Florida

Applications: PDF + email – Interconnection Agreement + Net Meter Application to Clay Electric Energy Services (solar@clayelectric.com)

Interconnection process and documents →
Lakeland ElectricProcess verified

Municipal utility · 122,506 residential customers · Florida

Applications: PDF + email – PV-ESS Agreement (all tiers) with Appendix B Application and Compliance Form, to Lakeland Electric Solar Team (solar@lakelandelectric.com; 501 E Lemon St, Mail Code LE-ED ENG, Lakeland FL 33801)

Interconnection process and documents →
City of TallahasseeState guidance

Municipal utility · 105,945 residential customers · Florida

Interconnection process and documents →
Gainesville Regional UtilitiesState guidance

Municipal utility · 93,214 residential customers · Florida

Interconnection process and documents →

Export compensation among the researched Florida utilities: NEM, Net billing. Rules differ by utility – see each utility page.

Florida interconnection rule

Commission

Florida Public Service Commission

Interconnection rule

Rule 25-6.065, F.A.C. – Interconnection and Metering of Customer-Owned Renewable Generation · source

Applies to

All investor-owned electric utilities (FPL, Duke Energy Florida, TECO, FPUC). Municipal utilities and rural electric cooperatives are not bound by the rule but must adopt their own standardized interconnection agreement and net metering program under s. 366.91(6), F.S.

Application form

Utility-specific standard interconnection application and Standard Interconnection Agreement (filed as part of each IOU's tariff); forms must be posted on the utility website, hard copy within 5 business days of request

Timelines

Completeness check within 10 business days of receipt; written notice of receipt/inspection dates/study need within 10 business days of complete application; utility executes agreement within 30 calendar days (90 days if Tier 3 study); customer returns signed agreement >=30 days before parallel operation and within 1 year; utility inspection within 30 calendar days of receiving signed agreement; customer notifies utility >=10 days before first energization.

Fees

Tier 1: no fees beyond those of other retail customers. Tiers 2-3: cost-based application fee only with Commission approval; Tier 3 may add study charge. No interconnection fees without prior Commission approval.

Insurance

Tier 1: none required (utility may recommend). Tier 2: general liability up to $1 million. Tier 3: up to $2 million. Self-insurance allowed.

External disconnect

Utility may require a visible, lockable load-break manual disconnect adjacent to the meter at customer expense; inverter-based Tier 1 systems are exempt unless the utility installs it at its own expense.

Export compensation

NEM – Rule 25-6.065(8), F.A.C.; s. 366.91, F.S.
Monthly netting; excess credited to next month's bill, rolled up to 12 months; unused credits paid at average annual COG-1 as-available energy rate at year-end. Customer keeps RECs. No aggregate cap in rule.

Not bound by the rule

Each municipal electric utility and rural electric cooperative selling at retail must develop a standardized interconnection agreement and net metering program for customer-owned renewable generation (s. 366.91(6), F.S.); terms set by each governing authority.

LevelUp toCriteria / review / fee
Tier 110 kWgross power rating <=10 kW; gross rating may not exceed 90% of customer's service rating; inverter AC rating = DC nameplate x 0.85 · completeness 10 business days; utility executes agreement within 30 calendar days of complete application · no fees beyond those charged to other retail customers (no application fee)
Tier 2100 kW>10 kW to 100 kW · completeness 10 business days; agreement within 30 calendar days · cost-based standard application fee approved by Commission (utility tariff)
Tier 32000 kW>100 kW to 2 MW · agreement within 30 days, or 90 days if interconnection study required · Commission-approved application fee plus possible Interconnection Study Charge

All 52 utilities in Florida

Residential customers in Florida per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.