California

California interconnection applications

61 electric utilities serve California (EIA-861, 2025): 6 investor-owned utilitys, 33 municipal utilitys, 13 public power districts, 4 electric cooperatives, 4 federal power agencys, 1 community choice aggregator (no grid). Together they serve 14,207,431 residential customers; 2,241,381 residential customers were on net metering at year-end 2025.

Largest utilities in California

PG&EProcess verified

Investor-owned utility · 5,055,556 residential customers · California

Applications: Own online portal – PG&E Interconnection Portal (YourProjects)

Interconnection process and documents →
SCEProcess verified

Investor-owned utility · 4,627,247 residential customers · California

Applications: PowerClerk – SCE Interconnection Online Application System

Interconnection process and documents →
LADWPProcess verified

Municipal utility · 1,415,602 residential customers · California

Applications: Own online portal – LADWP NEM Portal (online interconnection application; issues Work Request number WR#)

Interconnection process and documents →
SDG&EPartly researched

Investor-owned utility · 1,378,465 residential customers · California

Applications: Own online portal – Distribution Interconnection Information System (DIIS)

Interconnection process and documents →
SMUDProcess verified

Public power district · 601,275 residential customers · California

Applications: PowerClerk – SMUD Interconnection (PowerClerk)

Interconnection process and documents →
IIDProcess verified

Public power district · 142,916 residential customers · California

Applications: PowerClerk – IID Rooftop Solar PowerClerk (customer or contractor account)

Interconnection process and documents →
City of AnaheimState guidance

Municipal utility · 107,148 residential customers · California

Interconnection process and documents →
Modesto Irrigation DistrictState guidance

Public power district · 104,671 residential customers · California

Interconnection process and documents →
City of RiversideState guidance

Municipal utility · 101,042 residential customers · California

Interconnection process and documents →
Turlock Irrigation DistrictState guidance

Public power district · 80,976 residential customers · California

Interconnection process and documents →
City of GlendaleState guidance

Municipal utility · 78,071 residential customers · California

Applications: PowerClerk

Interconnection process and documents →
City of RosevilleState guidance

Municipal utility · 64,556 residential customers · California

Interconnection process and documents →

Export compensation among the researched California utilities: Net billing, NEM. Rules differ by utility – see each utility page.

California interconnection rule

Rule 21 tariff PDFs not read in full (PG&E file too large, SDG&E host unreachable): insurance, disconnect, NEM/NBT fee and document list unverified; documents list is typical, confirm in tariff Section E. NBT cap 1 MW per PU Code 2827 eligibility - confirm.

Commission

California Public Utilities Commission (CPUC)

Interconnection rule

CPUC Electric Tariff Rule 21 (utility-filed, CPUC-approved); D.20-09-035 timelines; current rulemaking R.25-08-004 – Rule 21 - Generating Facility Interconnections · source

Applies to

CPUC-jurisdictional IOUs: PG&E, SCE, SDG&E, Bear Valley Electric, Liberty Utilities (CalPeco); PacifiCorp uses OATT-based process under D.07-07-027. Not munis/POUs (LADWP, SMUD, IID etc.). Wholesale-market facilities go under WDT/CAISO.

Application form

Utility-specific Rule 21 interconnection request forms filed with CPUC (e.g. SCE Form 14-957 for NEM/NBT, 14-732 non-export); submitted via each IOU's online portal.

Timelines

Initial Review 15 BD; Supplemental Review 20 BD; draft interconnection agreement or cost estimate within 15 BD after review; D.20-09-035 requires tracking of 19 timelines and standard construction/meter timelines.

Fees

$800 interconnection request fee; $2,500 supplemental review (SCE page). NEM-2/NBT <=1 MW historically exempt from study costs; NEM/NBT request fee amount is utility-specific (not verified here).

Export compensation

Net billing – Pub. Util. Code §2827.1; CPUC D.22-12-056 (Net Billing Tariff, 'Solar Billing Plan'); Res. E-5301
NBT applies to IOU applications submitted on/after 2023-04-15; exports credited at avoided-cost-based values; required TOU rates (E-ELEC, TOU-D-PRIME, EV-TOU-5); 9-year legacy. Earlier NEM 1.0/2.0 grandfathered.

Not bound by the rule

Publicly owned utilities are not under Rule 21 and set their own interconnection rules; PU Code §2827 net metering obligations applied to POUs until their 5% cap; POUs now offer own successor tariffs.

LevelUp toCriteria / review / fee
Fast Track - Initial ReviewScreens; NEM/NBT and non-exporting projects eligible for Fast Track regardless of nameplate (per SCE) · 15 business days after application deemed complete · $800 interconnection request fee (non-NEM); NEM/NBT fee per utility tariff
Fast Track - Supplemental ReviewIf Initial Review screens fail · 20 business days after fee received · $2,500
Detailed Study (Independent / Distribution Group / Transmission Cluster)Projects failing Fast Track · Independent Study Screen Q/R results within 20 BD of deposit; Distribution Group 30 BD after window · Study deposit per Rule 21 Table E.1

All 61 utilities in California

Residential customers in California per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited