Home › Utilities › Wisconsin › Wisconsin Public Service (WPS)

Investor-owned utility

Wisconsin Public Service (WPS) interconnection application

Wisconsin Public Service (WPS) is an investor-owned utility serving 415,643 residential customers in Wisconsin (EIA-861, 2025). Applications: PDF + email (WPS customer-owned generation). Gridpol files Wisconsin Public Service (WPS) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Wisconsin Public Service (WPS)’s official sources (see below). ≤20 kW submission route assumed same contacts (no separate page found); PG rate terms not extracted.

Wisconsin Public Service (WPS) at a glance

Utility

Wisconsin Public Service Corp (WEC Energy Group)

Type

Investor-owned utility

EIA utility ID

20860

Residential customers

415,643 (EIA-861, 2025)

Net-metered residential customers

2,166 (EIA-861, 2025)

Service territory

22 counties in Wisconsin

How to apply

PDF + email – WPS customer-owned generation · official link

Who submits

Customer of record / installer submits PSC Form 6031 by email customergen@wisconsinpublicservice.com or mail (WPS, Attn: Christine Behnke, 134 MacArthur Drive, Coleman WI 54112). Payments sent separately to We Energies, Essential Services A299, PO Box 2046, Milwaukee WI 53201-9627.

Review time (official)

Status contact within 10 business days; engineering review determination within 10 business days.

Documents Wisconsin Public Service (WPS) asks for

  • Interconnection application formWisconsin Standard DG Application Form 6031 Gridpol prepares this.
  • Other utility-specific documentSolar PV / Energy Storage supplement forms
  • Single-line diagram (one-line)Computer generated, PSC 119.10 (shared WEC COG manual) Gridpol prepares this.
  • Site plan / site layoutComputer generated, PSC 119.12 Gridpol prepares this.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Photos (meter, main panel, equipment)Existing metering equipment photos
  • Proof of insuranceper PSC 119 category
  • Interconnection agreementSigned after commissioning with purchase agreement

How the Wisconsin Public Service (WPS) process runs

  1. Submit Form 6031 + supplements and documents by email/mail; pay fee separately
  2. Completeness (10 BD) and engineering review decision (10 BD)
  3. Pay upgrades
  4. Install, inspection
  5. Commissioning by Company
  6. Sign agreements; final acceptance

Fees

FeeApplies toNote
$300Optional pre-application report
per PSC 119 categoryApplication reviewnot stated

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Category 120 kWPSC 119
Category 2200 kW
Category 31000 kW
Category 415000 kW

Same WEC COG manual as We Energies

Storage, EV and stamps

Battery storage

Same as We Energies manual: UL 9540, Energy Storage form, non-export means must be reviewed with test data.

EV chargers

EV chargers must be shown on one-line (WEC COG manual).

Common issues the utility lists

  • Hand-drawn one-line/site plan not accepted (WEC manual)
  • Equipment differing from submitted documents

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited