Home › Utilities › Arizona › Navajo Tribal Utility Authority

State power authority

Navajo Tribal Utility Authority interconnection application

Navajo Tribal Utility Authority is a state power authority serving 38,553 residential customers in Arizona, New Mexico, Utah (EIA-861, 2025). Gridpol files Navajo Tribal Utility Authority interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Arizona’s commission rule (A.A.C. R14-2-2601 through R14-2-2628 (Title 14, Ch. 2, Article 26)) does not bind state power authoritys; Navajo Tribal Utility Authority sets its own interconnection policy. We confirm its form on the first project. Electric cooperatives are bound by Article 26 but may substitute timelines via Commission-approved Interconnection Manuals and must use best reasonable efforts to meet deadlines (R14-2-2627). SRP and municipal utilities are not ACC-regulated and follow their own interconnection and export-rate policies.

Navajo Tribal Utility Authority at a glance

Utility

Navajo Tribal Utility Authority

Type

State power authority

EIA utility ID

13314

Residential customers

38,553 (EIA-861, 2025)

Net-metered residential customers

none reported

Service territory

3 counties in Arizona, 2 counties in New Mexico, 1 county in Utah

Wholesale supplier / association

Utah Associated Municipal Power Systems (UAMPS)

Documents Navajo Tribal Utility Authority asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for Navajo Tribal Utility Authority. We confirm Navajo Tribal Utility Authority’s exact list on the first project.

Arizona interconnection rule

Commission

Arizona Corporation Commission (ACC)

Interconnection rule

A.A.C. R14-2-2601 through R14-2-2628 (Title 14, Ch. 2, Article 26) – Interconnection of Distributed Generation Facilities · source

Applies to

Generating facilities operating in parallel with the distribution system of an ACC-jurisdictional utility (public service corporations: IOUs such as APS, TEP, UNS Electric, and electric cooperatives; cooperatives may use Commission-approved Interconnection Manual timelines per R14-2-2627). Not SRP or municipal utilities (not ACC-jurisdictional).

Application form

Utility-specific application 'on a form provided by the Utility, or according to a format provided by the Utility' (R14-2-2614); utility Interconnection Manuals required (R14-2-2628).

Timelines

Completeness review 7 calendar days (applicant has 30 days to cure). Level 1 review 14 days, Level 2 review 21 days. Interconnection agreement sent within 7 days of approval; site inspection within 7 days of request; approval/failure notice within 3 days after inspection and signed documents; re-inspection within 14 days; application may be deemed withdrawn if not interconnected within 180 days of approval (R14-2-2614, -2617, -2618, -2621). Non-exporting storage and inadvertent-export systems <=20 kW exempt from R14-2-2614 application requirements; Expedited process in R14-2-2623.

Fees

Application/processing, additional-review, inspection and metering fees only if contained in a Commission-approved tariff (R14-2-2614, -2617, -2618, -2621). Customer pays required utility facility/equipment modifications.

Insurance

Utility shall not require general liability insurance as condition of interconnection, nor a particular insurer (R14-2-2607); exception: RUS-financed utilities (cooperatives) may require liability insurance to the extent needed for RUS obligations.

External disconnect

If required by the utility, customer installs a visual-open, manually operated, load-break disconnect switch isolating all ungrounded conductors (gang-operated for multi-phase); utility may add requirements in its Interconnection Manual (R14-2-2624). Inspection checks 24-hour utility access to disconnect (R14-2-2621).

Export compensation

Net billing – A.A.C. R14-2-2301 et seq. (Net Metering rules, eff. 2009); ACC Decision No. 75859 (Jan. 3, 2017)
Decision 75859 replaced retail net metering for new customer-generators of ACC-regulated utilities with an export rate initially set by the Resource Comparison Proxy (RCP) methodology, changes limited to 10%/year; existing NEM customers grandfathered. Exact implementation is utility-tariff specific (APS, TEP, UNSE RCP riders). Details from secondary summaries; decision text not retrieved.

Not bound by the rule

Electric cooperatives are bound by Article 26 but may substitute timelines via Commission-approved Interconnection Manuals and must use best reasonable efforts to meet deadlines (R14-2-2627). SRP and municipal utilities are not ACC-regulated and follow their own interconnection and export-rate policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.