Electric cooperativeDixie Escalante R E A, Inc. interconnection application
Dixie Escalante R E A, Inc. is an electric cooperative serving 31,231 residential customers in Arizona, Utah (EIA-861, 2025). Gridpol files Dixie Escalante R E A, Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Utah’s interconnection rule (Utah Admin. Code R746-312 (Electrical Interconnection)) applies to Dixie Escalante R E A, Inc.. Levels, timelines and documents below come from that rule; Dixie Escalante R E A, Inc.’s own form and portal are confirmed on the first project.
Dixie Escalante R E A, Inc. at a glance
Dixie Escalante R E A, Inc
TypeElectric cooperative
EIA utility ID40165
Residential customers31,231 (EIA-861, 2025)
Net-metered residential customers230 (EIA-861, 2025)
Service territory1 county in Arizona, 3 counties in Utah
Documents Dixie Escalante R E A, Inc. asks for
- Interconnection application formRequired by the state rule Gridpol prepares this.
- Interconnection agreementRequired by the state rule
- UL 1741 / IEEE 1547 certificationRequired by the state rule
Documents required by the Utah rule. Dixie Escalante R E A, Inc. may ask for more on its own form; we confirm on the first project.
Utah interconnection rule
Public Service Commission of Utah
Interconnection ruleUtah Admin. Code R746-312 (Electrical Interconnection) – Electrical Interconnection · source
Applies toPublic utilities providing electric service (Rocky Mountain Power). Rule also defines governing authority for distribution electrical cooperatives (board of directors) for net metering interconnections; fee limits apply to commission-regulated utilities, other utilities may set reasonable fees. Municipal utilities not covered.
Application formStandard form application/interconnection agreement based on FERC SGIP forms, modified to match the rule (R746-312-2 'standard form')
TimelinesDate/time stamp on receipt; acknowledgment 3 business days; completeness 10 business days (10 business days to cure); Level 1/2 screens 15 business days after completeness; Level 1 deemed approved if no notice within 25 business days of receipt; final authorization/inspection within 10 business days of documentation, otherwise witness test waived.
FeesLevel 1: none. Level 2: <=$50 + $1/kW. Level 3: <=$100 + $2/kW + study costs; engineering <=$100/h (annual CPI adjustment).
InsuranceFor net metering customers meeting Utah Code 54-15-106 standards, the utility may not require additional tests or additional liability insurance.
Export compensationNet billing – Utah Code Title 54, Chapter 15 (54-15-102 to -106)
Customer generation system 1.2-25 kW residential, <=2 MW non-residential (inverter-controlled). Excess credited at least at avoided cost or as set by governing authority (PSC/co-op board); unused credits expire at end of annualized billing period (April-March) and go to low-income programs. Rocky Mountain Power uses a PSC-set export credit (cost-benefit determination under 54-15-105.1). Utilities may close program at 0.1% of 2007 peak or if <1,000 customers.
Distribution electrical cooperatives fall under Utah Code 54-15 with their board of directors as governing authority (sets credits, extra requirements). Municipal utilities are not electrical corporations under 54-15 and set their own policies.
- R746-312-8 Level 1: https://www.law.cornell.edu/regulations/utah/Utah-Admin-Code-R746-312-8 (retrieved 2026-11-13)
- R746-312-9 Level 2: https://www.law.cornell.edu/regulations/utah/Utah-Admin-Code-R746-312-9 (retrieved 2026-11-13)
- R746-312-13 Fees: https://www.law.cornell.edu/regulations/utah/Utah-Admin-Code-R746-312-13 (retrieved 2026-11-13)
- R746-312-2 Definitions: https://www.law.cornell.edu/regulations/utah/Utah-Admin-Code-R746-312-2 (retrieved 2026-11-13)
- Utah Code 54-15-102 Definitions: https://le.utah.gov/xcode/Title54/Chapter15/54-15-S102.html (retrieved 2026-11-13)
- Utah Code 54-15-104 Credits: https://le.utah.gov/xcode/Title54/Chapter15/54-15-S104.html (retrieved 2026-11-13)
- Utah Code 54-15-106 Requirements/insurance: https://le.utah.gov/xcode/Title54/Chapter15/54-15-S106.html (retrieved 2026-11-13)
Other utilities in Utah
- Rocky Mountain Power (UT, ID, WY) / Pacific Power (OR, WA, CA)969,037
- Provo City Power36,032
- City of St George28,681
- Lehi City Corporation28,051
- City of Logan19,879
- City of Murray17,724
- Spanish Fork City Corporation16,588
- City of Bountiful15,762
- Heber Light & Power Company13,903
- Moon Lake Electric Association Inc.13,441
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.