Home › Utilities › Texas › Panola-Harrison Electric Cooperative, Inc.
Electric cooperativePanola-Harrison Electric Cooperative, Inc. interconnection application
Panola-Harrison Electric Cooperative, Inc. is an electric cooperative serving 17,917 residential customers in Louisiana, Texas (EIA-861, 2025). Gridpol files Panola-Harrison Electric Cooperative, Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Texas’s commission rule (16 TAC §25.211 (Interconnection of On-Site Distributed Generation) and §25.212 (Technical Requirements)) does not bind electric cooperatives; Panola-Harrison Electric Cooperative, Inc. sets its own interconnection policy. We confirm its form on the first project. Municipal utilities and electric cooperatives are not bound by §25.211/§25.212 (except coop gas-DG under (o)) and set their own interconnection and net metering/buyback policies.
Panola-Harrison Electric Cooperative, Inc. at a glance
Panola-Harrison Elec Coop, Inc
TypeElectric cooperative
EIA utility ID14424
Residential customers17,917 (EIA-861, 2025)
Net-metered residential customers94 (EIA-861, 2025)
Service territory2 counties in Louisiana, 2 counties in Texas
Documents Panola-Harrison Electric Cooperative, Inc. asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Panola-Harrison Electric Cooperative, Inc.. We confirm Panola-Harrison Electric Cooperative, Inc.’s exact list on the first project.
Texas interconnection rule
Public Utility Commission of Texas (PUCT)
Interconnection rule16 TAC §25.211 (Interconnection of On-Site Distributed Generation) and §25.212 (Technical Requirements) – Interconnection of On-Site Distributed Generation (DG) · source
Applies toElectric utilities under PUCT jurisdiction (incl. ERCOT transmission & distribution utilities such as Oncor, CenterPoint, AEP Texas, TNMP and non-ERCOT IOUs). Electric cooperatives only via §25.211(o) (distributed natural gas generation); municipal utilities not addressed.
Application formCommission-prescribed statewide application for interconnection and parallel operation (§25.211(q) figure) and prescribed interconnection agreement (§25.211(p)); utility must file DG tariff on prescribed form (§25.211(d)). Customer must submit application and execute agreement on these forms before interconnecting (§25.211(e)(5)).
TimelinesPre-certified: interconnect within 4 weeks of complete application; others 6 weeks; if substantial upgrades, within 2 weeks after upgrades complete (§25.211(m)); pre-interconnection studies <=4 weeks.
FeesNo separate application fee in rule; study fees in utility DG tariff; no study fee for pre-certified <=500 kW meeting (g)(1) or network inverter <20 kW; no distribution/O&M/transmission charges for exported energy (§25.211(d)).
External disconnect§25.212(b)(8): manual disconnect accessible to utility personnel, lockable open, with visible break; no small-inverter waiver in rule text, but parties may agree otherwise or seek good-cause exception (§25.212(a)(4)).
Export compensationNone statewide – 16 TAC §25.242(h) (QF purchase arrangements, integrated IOUs only)
No statewide net metering mandate found for ERCOT competitive areas; export compensation is set by retail electric providers. For integrated (non-unbundled) IOUs, §25.242(h) provides standard-rate purchase of QF output <=100 kW; single forward/backward meter option for renewable QFs <=50 kW closed to contracts after 2008-12-31. §25.242 excludes munis, river authorities, coops.
Municipal utilities and electric cooperatives are not bound by §25.211/§25.212 (except coop gas-DG under (o)) and set their own interconnection and net metering/buyback policies.
- 16 TAC §25.211: https://www.law.cornell.edu/regulations/texas/16-Tex-Admin-Code-SS-25-211 (retrieved 2026-11-13)
- 16 TAC §25.212: https://www.law.cornell.edu/regulations/texas/16-Tex-Admin-Code-SS-25-212 (retrieved 2026-11-13)
- 16 TAC §25.242: https://www.law.cornell.edu/regulations/texas/16-Tex-Admin-Code-SS-25-242 (retrieved 2026-11-13)
- PUCT §25.211 PDF (403 from fetch): https://ftp.puc.texas.gov/public/puct-info/agency/rulesnlaws/subrules/electric/25.211/25.211.pdf (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.