Home › Utilities › Texas › Xcel Energy (SPS)

Investor-owned utility

Xcel Energy (SPS) interconnection application

Xcel Energy (SPS) is an investor-owned utility serving 324,888 residential customers in New Mexico, Texas (EIA-861, 2025). Applications: Own online portal (Xcel Energy DER Interconnection Portal (Salesforce)). Gridpol files Xcel Energy (SPS) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Partly researched from official sources. verify on first project: Texas (SPS-TX) application route, fees and net metering/buyback tariff; NM portal process confirmed.

Xcel Energy (SPS) at a glance

Utility

Southwestern Public Service Co (Xcel Energy)

Type

Investor-owned utility

EIA utility ID

17718

Residential customers

324,888 (EIA-861, 2025)

Net-metered residential customers

2,240 (EIA-861, 2025)

Service territory

6 counties in New Mexico, 45 counties in Texas

How to apply

Own online portal – Xcel Energy DER Interconnection Portal (Salesforce) · official link

Who submits

Applicant/installer registers in portal, selects New Mexico + Distributed Generation; application agent e-mail recorded; customer signs application agreement (e-signature). SPS Texas service area is in SPP (non-ERCOT).

Export compensation

NEM – New Mexico net metering (17.9.570 NMAC); Texas SPS tariff not retrieved

Review time (official)

NM: PMO review 3 business days, completeness review 7 business days (10 business days total per guide).

Documents Xcel Energy (SPS) asks for

  • Interconnection application formContact info, system details, application details, battery details; signed application agreement Gridpol prepares this.
  • Single-line diagram (one-line)One-line diagram Gridpol prepares this.
  • Site plan / site layoutSite plan + annotated aerial map Gridpol prepares this.
  • Inverter spec sheetSpecification sheet(s)
  • Other utility-specific documentProof of site control; protection & control schematics/fuse curves if applicable; 120% Rule support documentation if system >120% of load (NM)
  • Proof of insuranceSubmitted at Design & Construction stage
  • Final inspection sign-offInspection details at Design & Construction stage

How the Xcel Energy (SPS) process runs

  1. Initiate application in portal (details, fee, e-signature, documents)
  2. PMO + completeness review
  3. Engineering screens (supplemental review/studies if needed)
  4. Interconnection Agreement signed/countersigned
  5. Design & construction: submit insurance, inspection, installation details
  6. Metering & testing (witness test if needed), meter enrollment
  7. Permission to Operate e-mail

Fees

FeeApplies toNote
$150NM limited export <=25 kW; non-export <100 kW; battery <100 kW
$300NM limited export >25-100 kW; non-export >=100 kW
$300 + $1/kWNM export >100 kW

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Simple track50 kWAC nameplate <=50 kW (NM)
Fast track>50 kW

NM: system >120% of customer load needs supporting documentation (17.9.568 NMAC)

Storage, EV and stamps

Battery storage

Battery is a DER type in the portal with battery details; battery <100 kW fee $150 (NM).

Sources

Texas interconnection rule

Commission

Public Utility Commission of Texas (PUCT)

Interconnection rule

16 TAC §25.211 (Interconnection of On-Site Distributed Generation) and §25.212 (Technical Requirements) – Interconnection of On-Site Distributed Generation (DG) · source

Applies to

Electric utilities under PUCT jurisdiction (incl. ERCOT transmission & distribution utilities such as Oncor, CenterPoint, AEP Texas, TNMP and non-ERCOT IOUs). Electric cooperatives only via §25.211(o) (distributed natural gas generation); municipal utilities not addressed.

Application form

Commission-prescribed statewide application for interconnection and parallel operation (§25.211(q) figure) and prescribed interconnection agreement (§25.211(p)); utility must file DG tariff on prescribed form (§25.211(d)). Customer must submit application and execute agreement on these forms before interconnecting (§25.211(e)(5)).

Timelines

Pre-certified: interconnect within 4 weeks of complete application; others 6 weeks; if substantial upgrades, within 2 weeks after upgrades complete (§25.211(m)); pre-interconnection studies <=4 weeks.

Fees

No separate application fee in rule; study fees in utility DG tariff; no study fee for pre-certified <=500 kW meeting (g)(1) or network inverter <20 kW; no distribution/O&M/transmission charges for exported energy (§25.211(d)).

External disconnect

§25.212(b)(8): manual disconnect accessible to utility personnel, lockable open, with visible break; no small-inverter waiver in rule text, but parties may agree otherwise or seek good-cause exception (§25.212(a)(4)).

Export compensation

None statewide – 16 TAC §25.242(h) (QF purchase arrangements, integrated IOUs only)
No statewide net metering mandate found for ERCOT competitive areas; export compensation is set by retail electric providers. For integrated (non-unbundled) IOUs, §25.242(h) provides standard-rate purchase of QF output <=100 kW; single forward/backward meter option for renewable QFs <=50 kW closed to contracts after 2008-12-31. §25.242 excludes munis, river authorities, coops.

Not bound by the rule

Municipal utilities and electric cooperatives are not bound by §25.211/§25.212 (except coop gas-DG under (o)) and set their own interconnection and net metering/buyback policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited