Electric cooperativeCoServ interconnection application
CoServ is an electric cooperative serving 310,805 residential customers in Texas (EIA-861, 2025). Applications: Own online portal (CoServ online DG application (residential PV <=50 kW DC)). Gridpol files CoServ interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from CoServ’s official sources (see below). Document list and fee amount are in the DG Manual (not retrieved).
CoServ at a glance
Denton County Elec Coop, Inc
TypeElectric cooperative
EIA utility ID5078
Residential customers310,805 (EIA-861, 2025)
Net-metered residential customers9,170 (EIA-861, 2025)
Service territory6 counties in Texas
How to applyOwn online portal – CoServ online DG application (residential PV <=50 kW DC) · official link
Who submitsContractor typically submits (receives pre-approval and notifies completion); member billed the fee. CoServ (Denton County Electric Coop) is in ERCOT but handles its own coop interconnection.
Export compensationNet billing – DG w/Buyback Solar rate (since Feb 1, 2023)
All exports credited at avoided wholesale power cost (Nov 2026: $0.0843/kWh); credits may offset customer charge/taxes, carried forward
Pre-approval or change request within 15 days; inspection within 2-4 weeks after completion notice.
Documents CoServ asks for
- Interconnection application formOnline application for residential PV <=50 kW DC; otherwise paper application from DG Procedures and Guidelines Manual Gridpol prepares this.
How the CoServ process runs
- Contact CoServ Energy Solutions
- Submit online (or paper) application
- Pre-approval within 15 days
- Install; contractor e-mails completion
- CoServ inspection within 2-4 weeks; meter programmed bi-directional
- Operate; fee billed on next bill
Fees
| Fee | Applies to | Note |
|---|---|---|
| Application | Billed to member on next bill; amount in DG Manual |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Online application | 50 kW | Residential solar PV, kW DC |
Sources
- CoServ – Solar Installations: https://www.coserv.com/energy-solutions/distributed-energy/solar/solar-installations/ (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.