South Dakota

South Dakota interconnection applications

72 electric utilities serve South Dakota (EIA-861, 2025): 6 investor-owned utilitys, 30 electric cooperatives, 34 municipal utilitys, 1 public power district, 1 federal power agency. Together they serve 362,049 residential customers; 570 residential customers were on net metering at year-end 2025.

Largest utilities in South Dakota

Xcel Energy (Minnesota)Process verified

Investor-owned utility · 1,420,807 residential customers · South Dakota

Applications: Own online portal – Xcel Energy Minnesota DER Interconnection Portal

Interconnection process and documents →
Black Hills Energy (Black Hills Power)Partly researched

Investor-owned utility · 69,800 residential customers · South Dakota

Interconnection process and documents →
NorthWestern Energy (South Dakota)Partly researched

Investor-owned utility · 51,787 residential customers · South Dakota

Applications: PowerClerk – NorthWestern Energy PowerClerk – Level 1 Small Generator Interconnection Request

Interconnection process and documents →
Sioux Valley SW Electric CooperativeState guidance

Electric cooperative · 26,360 residential customers · South Dakota

Interconnection process and documents →
Southeastern Electric Cooperative Inc.State guidance

Electric cooperative · 20,959 residential customers · South Dakota

Interconnection process and documents →
West River Electric Association Inc.State guidance

Electric cooperative · 18,975 residential customers · South Dakota

Interconnection process and documents →
Watertown Municipal UtilitiesState guidance

Municipal utility · 11,775 residential customers · South Dakota

Interconnection process and documents →
City of BrookingsState guidance

Municipal utility · 10,769 residential customers · South Dakota

Interconnection process and documents →
Black Hills Electric Cooperative, Inc.State guidance

Electric cooperative · 9,415 residential customers · South Dakota

Interconnection process and documents →
Otter Tail PowerProcess verified

Investor-owned utility · 104,750 residential customers · South Dakota

Applications: Own online portal – Otter Tail Simplified Application (Smartsheet form)

Interconnection process and documents →
Central Electric Cooperative, Inc.State guidance

Electric cooperative · 6,515 residential customers · South Dakota

Interconnection process and documents →
Montana-Dakota UtilitiesPartly researched

Investor-owned utility · 120,678 residential customers · South Dakota

Interconnection process and documents →

Export compensation among the researched South Dakota utilities: NEM, Net billing. Rules differ by utility – see each utility page.

South Dakota interconnection rule

Commission

South Dakota Public Utilities Commission

Interconnection rule

ARSD 20:10:36 (Small Generator Interconnection) – Small Generator Facility Interconnection · source

Applies to

Public utilities (PUC rate-regulated IOUs: Xcel/NSP, Black Hills, NorthWestern, MDU, Otter Tail) for facilities <=10 MW not under FERC/RTO jurisdiction

Application form

Commission tier application forms (application forms available from the commission, 20:10:36:33); certificate of completion; interconnection agreement

Timelines

Tier 1: acknowledgment within 3 business days, completeness within 10 BD, applicant 20 BD to cure, review within 15 BD after complete (20:10:36:33). Completion requires passed screens, code inspector approval, witness test if done, certificate of completion, executed agreement (20:10:36:34).

Fees

Tier 1 $50; Tier 2 $50 + $1/kW up to $500; Tier 3 and 4 $100 + $2/kW up to $1,000 (20:10:36:06).

Insurance

Tier 1: proof of adequate homeowners/general/commercial liability; Tier 2 up to $500,000; Tiers 3-4 up to $1,000,000 at utility request (20:10:36:26). Endorsements (utility additional insured etc.) not required for residential <=10 kW (20:10:36:27).

External disconnect

Only if required by the utility: primary-line lockable visible-break device; secondary-line lockable device with clearly indicated status; lockbox alternative (20:10:36:15).

Export compensation

None statewide
No statewide net metering rule; compensation per utility tariff (e.g. avoided-cost/PURPA).

Not bound by the rule

Electric cooperatives and municipal utilities are not rate-regulated by the PUC and set their own interconnection and buyback policies.

LevelUp toCriteria / review / fee
Tier 110 kWInverter-based, lab-tested equipment, <=10 kW, not on transmission line · Acknowledge 3 BD; completeness 10 BD; review 15 BD after complete · $50
Tier 22000 kW<=2 MW, radial or single-premise spot network, lab- or field-tested equipment · $50 + $1/kW (max $500)
Tier 32000 kW<=2 MW non-exporting (reverse/low forward power protection) · $100 + $2/kW (max $1,000)
Tier 410000 kWAll other <=10 MW (studies) · $100 + $2/kW (max $1,000) + study deposit

All 72 utilities in South Dakota

Residential customers in South Dakota per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited