Home › Utilities › Iowa › MidAmerican Energy

Investor-owned utility

MidAmerican Energy interconnection application

MidAmerican Energy is an investor-owned utility serving 717,275 residential customers in Iowa, Illinois, South Dakota (EIA-861, 2025). Applications: PDF + mail (State standard interconnection forms (IA/IL/SD)). Gridpol files MidAmerican Energy interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from MidAmerican Energy’s official sources (see below). Confirm submission channel (mail vs email to privategeneration@midamerican.com) and IL/SD fees on first project.

MidAmerican Energy at a glance

Utility

MidAmerican Energy Co (Berkshire Hathaway Energy)

Type

Investor-owned utility

EIA utility ID

12341

Residential customers

717,275 (EIA-861, 2025)

Net-metered residential customers

5,523 (EIA-861, 2025)

Service territory

55 counties in Iowa, 3 counties in Illinois, 2 counties in South Dakota

How to apply

PDF + mail – State standard interconnection forms (IA/IL/SD) · official link

Who submits

Customer (Interconnection Customer) signs; equipment/electrical contractor listed on form. Installer needs MidAmerican third-party access form to obtain usage history. Iowa Level 1 form: mail completed form with fee to utility; questions privategeneration@midamerican.com.

Export compensation

Net billing – Iowa Rate IO (Inflow/Outflow)
IA: 15-minute inflow/outflow, outflow credited at retail volumetric rate, carryover expires per Jan/Apr billing year. IL: Rate NEM (applied ≥1/1/2025, supply credit kWh or monetary). SD: Rate QF only.

Review time (official)

Per state rules (199 IAC 45 / IL Part 466 / SD 20:10:36); commissioning date changes must be reported within 15 business days (IA form).

Documents MidAmerican Energy asks for

  • Interconnection application formIA Level 1 (≤20 kVA) / Level 2-4 (≤10 MVA); IL Level 1 (≤25 kW) / 2-4; SD Tier 1 (≤10 kW) / Tier 2-4 Gridpol prepares this.
  • Customer signatureApplicant signature must match contact name
  • Single-line diagram (one-line)One line diagram attached Gridpol prepares this.
  • Site plan / site layoutPlot plan relative to streets/landmarks Gridpol prepares this.
  • Inverter spec sheetManufacturer specs + NRTL (UL) label information
  • Proof of insuranceProof of homeowner's or general liability insurance
  • Other utility-specific documentCertificate of Completion + inverter setting details after install
  • Letter of authorization / designated agent form (when applicable)Third-party access form for installer to get usage history
  • Net metering / net billing agreement (when applicable)IL only: Net Energy Metering Application, Installer Certification Form, copy of installation invoice

How the MidAmerican Energy process runs

  1. Gather usage history (installer needs third-party access form)
  2. Submit state interconnection application + fee
  3. MidAmerican review under state rules
  4. Identify system/grid upgrades and costs
  5. Sign standard state interconnection agreement
  6. Install; submit Certificate of Completion and inverter settings
  7. Inverter settings review + witness test ($125 IA)
  8. Meter change; executed Certificate of Completion = permission to operate
  9. New rate takes effect

Fees

FeeApplies toNote
$125Iowa Level 1 applicationper Iowa Level 1 form
$125Iowa witness testcost-based, max $125

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
IA Level 120 kWkVA
IA Level 2-410000 kW
IL Level 125 kW
SD Tier 110 kW

Storage, EV and stamps

Battery storage

Iowa form allows 'Storage – specify type' as energy source; no separate storage rules found.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited