Home › Utilities › South Dakota › Northern Electric Cooperative, Inc.
Electric cooperativeNorthern Electric Cooperative, Inc. interconnection application
Northern Electric Cooperative, Inc. is an electric cooperative serving 5,823 residential customers in North Dakota, South Dakota (EIA-861, 2025). Gridpol files Northern Electric Cooperative, Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
South Dakota’s commission rule (ARSD 20:10:36 (Small Generator Interconnection)) does not bind electric cooperatives; Northern Electric Cooperative, Inc. sets its own interconnection policy. We confirm its form on the first project. Electric cooperatives and municipal utilities are not rate-regulated by the PUC and set their own interconnection and buyback policies.
Northern Electric Cooperative, Inc. at a glance
Northern Electric Coop, Inc
TypeElectric cooperative
EIA utility ID13750
Residential customers5,823 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory2 counties in North Dakota, 10 counties in South Dakota
Wholesale supplier / associationBasin Electric Power Cooperative
Documents Northern Electric Cooperative, Inc. asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Northern Electric Cooperative, Inc.. We confirm Northern Electric Cooperative, Inc.’s exact list on the first project.
South Dakota interconnection rule
South Dakota Public Utilities Commission
Interconnection ruleARSD 20:10:36 (Small Generator Interconnection) – Small Generator Facility Interconnection · source
Applies toPublic utilities (PUC rate-regulated IOUs: Xcel/NSP, Black Hills, NorthWestern, MDU, Otter Tail) for facilities <=10 MW not under FERC/RTO jurisdiction
Application formCommission tier application forms (application forms available from the commission, 20:10:36:33); certificate of completion; interconnection agreement
TimelinesTier 1: acknowledgment within 3 business days, completeness within 10 BD, applicant 20 BD to cure, review within 15 BD after complete (20:10:36:33). Completion requires passed screens, code inspector approval, witness test if done, certificate of completion, executed agreement (20:10:36:34).
FeesTier 1 $50; Tier 2 $50 + $1/kW up to $500; Tier 3 and 4 $100 + $2/kW up to $1,000 (20:10:36:06).
InsuranceTier 1: proof of adequate homeowners/general/commercial liability; Tier 2 up to $500,000; Tiers 3-4 up to $1,000,000 at utility request (20:10:36:26). Endorsements (utility additional insured etc.) not required for residential <=10 kW (20:10:36:27).
External disconnectOnly if required by the utility: primary-line lockable visible-break device; secondary-line lockable device with clearly indicated status; lockbox alternative (20:10:36:15).
Export compensationNone statewide
No statewide net metering rule; compensation per utility tariff (e.g. avoided-cost/PURPA).
Electric cooperatives and municipal utilities are not rate-regulated by the PUC and set their own interconnection and buyback policies.
- ARSD 20:10:36 chapter index: https://sdlegislature.gov/api/Rules/20:10:36.html (retrieved 2026-11-13)
- ARSD 20:10:36:06 Application fees: https://sdlegislature.gov/api/Rules/20:10:36:06.html (retrieved 2026-11-13)
- ARSD 20:10:36:26 Insurance amounts: https://sdlegislature.gov/api/Rules/20:10:36:26.html (retrieved 2026-11-13)
- ARSD 20:10:36:33 Tier 1 review procedures: https://sdlegislature.gov/api/Rules/20:10:36:33.html (retrieved 2026-11-13)
Other utilities in South Dakota
- Xcel Energy (Minnesota)94,137
- Black Hills Energy (Black Hills Power)67,608
- NorthWestern Energy (South Dakota)51,787
- Sioux Valley SW Electric Cooperative22,989
- Southeastern Electric Cooperative Inc.20,959
- West River Electric Association Inc.18,975
- Watertown Municipal Utilities11,775
- City of Brookings10,769
- Black Hills Electric Cooperative, Inc.9,415
- Otter Tail Power9,094
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.