Investor-owned utilityMontana-Dakota Utilities interconnection application
Montana-Dakota Utilities is an investor-owned utility serving 120,678 residential customers in Montana, North Dakota, South Dakota, Wyoming (EIA-861, 2025). Gridpol files Montana-Dakota Utilities interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. verify on first project: montana-dakota.com (pages and tariff PDFs) returns 403 to all our fetchers and archive.org is unreachable; submission route, documents, fees, levels, steps and per-state tariffs (MT Rate 92/96, ND Rate 140, SD ARSD 20:10:36, WY) still to be confirmed with Montana-Dakota (Bismarck, 701-222-7900).
Montana-Dakota Utilities at a glance
Montana-Dakota Utilities Co (MDU Resources Group)
TypeInvestor-owned utility
EIA utility ID12199
Residential customers120,678 (EIA-861, 2025)
Net-metered residential customers215 (EIA-861, 2025)
Service territory11 counties in Montana, 29 counties in North Dakota, 13 counties in South Dakota, 2 counties in Wyoming
Export compensationNEM – Montana: Net Metering Service Rate 92; Small Generator Interconnection Rate 96
Montana only, per search-index text of tariff PDFs (bi-directional meter, one net metering system per metered service). ND (Rate 140 small qualifying facilities), SD, WY tariffs not confirmed.
Documents Montana-Dakota Utilities asks for
- Interconnection application formMontana: Small Generator Facility Level 1 Interconnection Request (tariff Rate 96) with Addendum A Net Metering Rate Request (Rate 92); separate Level 2 and Level 3 & 4 forms. Per search-index text only; other states not seen. Gridpol prepares this.
Fees
| Fee | Applies to | Note |
|---|---|---|
| Montana Level 1 | Form states application fee must be paid before processing; amount not retrieved (Rate 96). |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|
Not retrieved.
Sources
- Montana-Dakota - Net metering (not retrievable, 403; archive.org not reachable): https://www.montana-dakota.com/net-metering/ (retrieved 2026-11-13)
- Montana-Dakota MT Electric Rate 96 small generator interconnection incl. Level 1 request form (search-index text only; PDF 403): https://www.montana-dakota.com/wp-content/uploads/PDFs/Rates-Tariffs/Montana/Electric/MTElectric96.pdf (retrieved 2026-11-13)
- Montana-Dakota MT Electric Rate 92 Net Metering Service (search-index text only; PDF 403): https://www.montana-dakota.com/wp-content/uploads/PDFs/Rates-Tariffs/Montana/Electric/MTElectric92.pdf (retrieved 2026-11-13)
- SD PUC - Montana-Dakota Small Generator Facility Interconnection Report 2025 (no SD interconnections in 2025; ARSD 20:10:36): https://puc.sd.gov/commission/commissionaction/interconnectionreports/2025MDUReport.pdf (retrieved 2026-11-13)
North Dakota interconnection rule
North Dakota Public Service Commission (PSC)
Interconnection ruleN.D. Admin. Code ch. 69-09-07 (Small Power Production and Cogeneration, PURPA implementation), esp. 69-09-07-11 Interconnection costs – Small Power Production and Cogeneration · source
Applies toSales/purchases between PURPA qualifying facilities and 'electric public utilities' under PSC jurisdiction (NDCC 49-03-01.5) - investor-owned utilities (Xcel/NSP, MDU, Otter Tail). Rural electric cooperatives and munis are not PSC rate-regulated.
Application formNo statewide interconnection application/standard in the Administrative Code; utility-specific tariffs and forms.
FeesQF pays interconnection costs the commission may assess on a nondiscriminatory basis; reimbursement may be spread over time (69-09-07-11). No fee caps.
Export compensationNEM – N.D. Admin. Code 69-09-07-09(3)(a)
QFs <=100 kW design capacity entitled to net energy billing (meter reverses); utility may recover production-monitoring metering costs. Applies to PSC-regulated IOUs only; Legislative Council committee objection filed 1991 (rule remains). Netting period (monthly/annual) set in utility tariffs.
Rural electric cooperatives and municipal utilities are not covered by the PSC net billing rule or any state interconnection standard; they follow their own policies and federal PURPA obligations.
- N.D. Admin. Code ch. 69-09-07: https://ndlegis.gov/information/acdata/pdf/69-09-07.pdf (retrieved 2026-11-13)
- N.D. Admin. Code Art. 69-09 index: https://ndlegis.gov/information/acdata/html/69-09.html (retrieved 2026-11-13)
Other utilities in North Dakota
- Xcel Energy (Minnesota)83,434
- Cass County Electric Cooperative Inc.52,785
- Otter Tail Power45,437
- Nodak Electric Cooperative Inc.20,715
- Capital Electric Cooperative, Inc.19,650
- Verendrye Electric Cooperative Inc.14,357
- Mountrail-Williams Electric Cooperative11,485
- Roughrider Electric Cooperativ11,246
- Northern Plains Electric Cooperative10,472
- North Central Electric Cooperative, Inc.6,088
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.