Home › Utilities › Minnesota › Otter Tail Power

Investor-owned utility

Otter Tail Power interconnection application

Otter Tail Power is an investor-owned utility serving 104,750 residential customers in Minnesota, North Dakota, South Dakota (EIA-861, 2025). Applications: Own online portal (Otter Tail Simplified Application (Smartsheet form)). Gridpol files Otter Tail Power interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Otter Tail Power’s official sources (see below). Base application fee and timelines: see MN DIP; ND/SD processes not researched.

Otter Tail Power at a glance

Utility

Otter Tail Power Co (Otter Tail Corp)

Type

Investor-owned utility

EIA utility ID

14232

Residential customers

104,750 (EIA-861, 2025)

Net-metered residential customers

89 (EIA-861, 2025)

Service territory

30 counties in Minnesota, 34 counties in North Dakota, 11 counties in South Dakota

How to apply

Own online portal – Otter Tail Simplified Application (Smartsheet form) · official link

Who submits

Installer or customer; online form or mail paper application with fee to Otter Tail Power, Attn: Interconnection Coordinator, 215 S. Cascade St., Fergus Falls MN 56538-0496. Fees payable online (Paymentus).

Export compensation

NEM – Small Power Producer Rider – Net Energy Billing Rate (MN 12.01)

Review time (official)

Per MN DIP (not stated on page).

Documents Otter Tail Power asks for

  • Interconnection application formMN DIP Attachment 2 Simplified Application (≤20 kW certified inverter); Attachment 3 Fast Track Gridpol prepares this.
  • Single-line diagram (one-line)Single line diagram Gridpol prepares this.
  • Site plan / site layoutSite diagram Gridpol prepares this.
  • Inverter spec sheetUL 1741 SB (3rd Ed.) certified, Utility Required Profile (URP) since 1/1/2024
  • Battery spec sheet (when applicable)Exhibit B 'For Energy Storage'
  • Other utility-specific documentURP-AS 'Applied Settings' file returned after witness test/site inspection
  • Other utility-specific documentCertificate of Completion (Exhibit C)
  • Interconnection agreementMN DIA / Uniform Statewide Contract

How the Otter Tail Power process runs

  1. Submit Simplified Application online (or mail) + fee
  2. Review per MN DIP Section 2
  3. Sign MN DIA
  4. Install; inspection
  5. Witness test and site inspection; return URP-AS applied settings file
  6. Certificate of Completion (Exhibit C)
  7. Permission to operate

Fees

FeeApplies toNote
per Attachment 3 + $30All MN applications$30 state surcharge remitted to MN PUC; base fee not stated on page (MN DIP max $100 simplified)

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Simplified20 kWcertified inverter-based
Fast TrackMN DIP
Study10000 kW
Net metering cap40 kW

ND/SD use separate state processes (ND DG application process docs)

Storage, EV and stamps

Battery storage

Exhibit B energy storage details required for storage; UL 1741 SB with URP.

Common issues the utility lists

  • Inverter not UL 1741 SB certified or URP settings not applied

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.