Electric cooperativeSoutheast Electric Cooperative, Inc. interconnection application
Southeast Electric Cooperative, Inc. is an electric cooperative serving 2,233 customers in Montana, South Dakota, Wyoming (EIA-861, 2025). Gridpol files Southeast Electric Cooperative, Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Montana’s commission rule (ARM 38.5.8401 - 38.5.8413 (Small Generator Interconnection)) does not bind electric cooperatives; Southeast Electric Cooperative, Inc. sets its own interconnection policy. We confirm its form on the first project. Electric cooperatives are exempt from the net metering statute and PSC interconnection rules and set their own policies; MDU largely exempt from the statutory net metering part.
Southeast Electric Cooperative, Inc. at a glance
Southeast Electric Coop, Inc
TypeElectric cooperative
EIA utility ID17593
Customers2,233 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory4 counties in Montana, 1 county in South Dakota, 1 county in Wyoming
Wholesale supplier / associationBasin Electric Power Cooperative
Documents Southeast Electric Cooperative, Inc. asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Southeast Electric Cooperative, Inc.. We confirm Southeast Electric Cooperative, Inc.’s exact list on the first project.
Montana interconnection rule
Montana Public Service Commission
Interconnection ruleARM 38.5.8401 - 38.5.8413 (Small Generator Interconnection) – Small Generator Interconnection · source
Applies toElectric distribution companies (EDCs) subject to PSC regulation (NorthWestern Energy, Montana-Dakota Utilities, Black Hills); not electric cooperatives or municipal utilities
Application formUtility-specific standard interconnection request form, agreements and fee schedule filed with and approved by the PSC (ARM 38.5.8403/8404)
TimelinesLevel 1: completeness 10 business days, screens 15 BD, agreement 5 BD, applicant signs within 30 BD. Level 2: completeness 10 BD, evaluation 20 BD. Applicant gives 20 BD notice of commissioning test; EDC witness test within 10 BD or deemed waived; deficiencies report 5 BD, cure 30 BD (ARM 38.5.8408-8410).
FeesEDC files fee schedule and study rates with PSC for approval; no deviation without approval (ARM 38.5.8404). No amounts in rule.
InsuranceNot addressed in reviewed rules.
External disconnectRequired: lockable, visible-break isolation device accessible to EDC, owned/maintained by generator owner, between facility and point of interconnection (ARM 38.5.8408(6)).
Export compensationNEM – MCA 69-8-601 to 69-8-605
Statutory net metering applies to NorthWestern Energy (public utility) only; monthly kWh credit carried forward, unused credit granted to utility at end of customer-chosen 12-month period (69-8-603). 50 kW system cap per DSIRE/legislative primer, not verified in statute text.
Electric cooperatives are exempt from the net metering statute and PSC interconnection rules and set their own policies; MDU largely exempt from the statutory net metering part.
- ARM 38.5.8401 Definitions: https://www.law.cornell.edu/regulations/montana/Mont-Admin-R-38-5-8401 (retrieved 2026-11-13)
- ARM 38.5.8406 Review procedures: https://www.law.cornell.edu/regulations/montana/Mont-Admin-R-38-5-8406 (retrieved 2026-11-13)
- ARM 38.5.8408 Additional requirements: https://www.law.cornell.edu/regulations/montana/Mont-Admin-R-38-5-8408 (retrieved 2026-11-13)
- ARM 38.5.8409 Level 1 expedited review: https://www.law.cornell.edu/regulations/montana/Mont-Admin-R-38-5-8409 (retrieved 2026-11-13)
- ARM 38.5.8410 Level 2 expedited review: https://www.law.cornell.edu/regulations/montana/Mont-Admin-R-38-5-8410 (retrieved 2026-11-13)
- MCA 69-8-603: https://mca.legmt.gov/bills/mca/title_0690/chapter_0080/part_0060/section_0030/0690-0080-0060-0030.html (retrieved 2026-11-13)
- MCA 69-8-604: https://mca.legmt.gov/bills/mca/title_0690/chapter_0080/part_0060/section_0040/0690-0080-0060-0040.html (retrieved 2026-11-13)
Other utilities in Montana
- NorthWestern Energy (Montana)333,713
- Flathead Electric Cooperative64,334
- Yellowstone Valley Electric Co-op21,471
- Montana-Dakota Utilities19,626
- USBIA-Mission Valley Power16,353
- Missoula Electric Cooperative, Inc.14,867
- Fergus Electric Cooperative, Inc.6,855
- Northern Lights, Inc.4,700
- Lower Yellowstone R E A, Inc.3,247
- Fall River Rural Electric Cooperative Inc.1,525
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.