Georgia interconnection applications
97 electric utilities serve Georgia (EIA-861, 2025): 1 investor-owned utility, 42 electric cooperatives, 52 municipal utilitys, 1 public power district, 1 federal power agency. Together they serve 4,740,567 residential customers; 20,377 residential customers were on net metering at year-end 2025.
Largest utilities in Georgia
Investor-owned utility · 2,480,484 residential customers · Georgia
Applications: PowerClerk – Georgia Power BTM PowerClerk
Interconnection process and documents →Electric cooperative · 245,849 residential customers · Georgia
Applications: PDF + mail – Interconnection Request (Application), Appendix B of DG Interconnection Procedure; mail with $100 fee to Jackson EMC, Attn: System Engineering, P.O. Box 38, Jefferson, GA 30549 (questions: interconnection@jacksonemc.com)
Interconnection process and documents →Electric cooperative · 203,131 residential customers · Georgia
Applications: Own online portal – Cobb EMC Interconnect Application
Interconnection process and documents →Electric cooperative · 182,849 residential customers · Georgia
Applications: PDF + email – Interconnection documents emailed to interconnections@sawnee.coop
Interconnection process and documents →Electric cooperative · 142,841 residential customers · Georgia
Applications: Own online portal – GreyStone online Residential Application (formtracking) + contractor upload link
Interconnection process and documents →Electric cooperative · 133,581 residential customers · Georgia
Interconnection process and documents →Electric cooperative · 106,304 residential customers · Georgia
Interconnection process and documents →Electric cooperative · 90,932 residential customers · Georgia
Interconnection process and documents →Electric cooperative · 85,358 residential customers · Georgia
Interconnection process and documents →Electric cooperative · 83,660 residential customers · Georgia
Interconnection process and documents →Electric cooperative · 66,177 residential customers · Georgia
Interconnection process and documents →Electric cooperative · 62,546 residential customers · Georgia
Interconnection process and documents →Export compensation among the researched Georgia utilities: Net billing, Avoided cost. Rules differ by utility – see each utility page.
Georgia interconnection rule
Georgia Public Service Commission
Interconnection ruleO.C.G.A. 46-3-50 to 46-3-56 (Georgia Cogeneration and Distributed Generation Act of 2001) – Cogeneration and Distributed Generation · source
Applies toAll electric service providers: electric utilities (Georgia Power), electric membership corporations and municipal electric utilities (O.C.G.A. 46-3-52)
Application formNo statewide form; written agreement between provider and customer generator (46-3-54); each provider uses own interconnection application/agreement (e.g. Georgia Power DG Interconnection Guidelines, EMC DG policies)
TimelinesNo statutory or PSC review timelines found.
FeesFees limited to direct costs of interconnecting/administering metering; no standby, capacity, interconnection or other fees beyond monthly service charge unless customer agrees or commission/governing body approves (46-3-54).
InsuranceProvider may not require additional liability insurance from a facility meeting NEC, NESC, IEEE and UL requirements (46-3-56).
External disconnectNot addressed in statute; utility-specific (e.g. Georgia Power DG construction guidelines).
Export compensationUtility-specific – O.C.G.A. 46-3-55, 46-3-56
Bidirectional metering with excess credited at rate filed with commission; providers must buy first-come first-served until 0.2% of prior-year annual peak demand, at not more than avoided energy cost. Georgia Power offers monthly netting/buyback per PSC-approved tariffs.
EMCs and municipal utilities are covered by the Act; rates set by their governing bodies instead of PSC; each publishes own DG interconnection policy (e.g. Altamaha EMC, Carroll EMC, City of Cartersville).
| Level | Up to | Criteria / review / fee |
|---|---|---|
| Distributed generation facility (statute) | 10 kW | Residential: solar PV, fuel cell or wind, on premises, parallel operation, primarily offsets own use · Only direct costs of interconnection/metering admin; no additional standby/capacity/interconnection fees without commission approval (46-3-54) |
| Distributed generation facility (statute) - commercial | 100 kW | Commercial application, same technology/location criteria · As above |
- O.C.G.A. 46-3-52 Definitions: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-52/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-54: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-54/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-55: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-55/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-56: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-56/ (retrieved 2026-11-13)
All 97 utilities in Georgia
- Georgia Power2,480,484
- Jackson EMC245,849
- Cobb EMC203,131
- Sawnee EMC182,849
- GreyStone Power142,841
- Walton EMC133,581
- Snapping Shoals El Member Corporation106,304
- North Georgia Electric Member Corporation90,932
- Flint Electric Membership Corporation85,358
- Coweta-Fayette El Member Corporation83,660
- Colquitt Electric Membership Corporation66,177
- Central Georgia El Member Corporation62,546
- Satilla Rural Electric Member Corporation54,207
- Carroll Electric Member Corporation53,707
- Amicalola Electric Member Corporation51,657
- City of Marietta36,288
- Habersham Electric Membership Corporation35,519
- Jefferson Electric Member Corporation34,651
- Diverse Power Incorporated32,557
- Albany Utility Board31,706
- Blue Ridge Mountain EMC30,863
- Hart Electric Member Corporation30,698
- Okefenoke Rural El Member Corporation28,463
- Canoochee Electric Member Corporation24,733
- Excelsior Electric Member Corporation23,762
- Coastal Electric Member Corporation21,397
- Mitchell Electric Member Corporation21,350
- Tri-County Electric Member Corporation (GA)21,329
- Southern Rivers Energy20,770
- Altamaha Electric Member Corporation19,623
- Grady Electric Membership Corporation19,416
- Rayle Electric Membership Corporation16,474
- Planters Electric Member Corporation16,417
- City of East Point16,204
- Washington Electric Member Corporation15,170
- Sumter Electric Member Corporation15,145
- City of Lawrenceville14,747
- City of Thomasville14,275
- Three Notch Electric Member Corporation13,680
- City of Griffin13,584
- Dalton Utilities13,473
- City of Covington13,302
- Tri-State Electric Member Corporation13,218
- City of La Grange13,081
- EPB (Electric Power Board of Chattanooga)11,305
- Oconee Electric Member Corporation10,868
- Newnan Wtr, Sewer & Light Comm9,259
- Crisp County Power Comm9,210
- City of College Park7,794
- City of Cartersville7,507
- City of Calhoun5,042
- City of Douglas4,129
- City of Buford3,004
- City of Sandersville2,215
- City of Sylvania1,909
- City of Washington1,884
- City of Chickamauga828
- Haywood Electric Member Corporation435
- Ocmulgee Electric Member Corporation0
- Irwin Electric Membership Corporation0
- Little Ocmulgee El Member Corporation0
- Upson Electric Member Corporation0
- Slash Pine Electric Member Corporation0
- Middle Georgia El Member Corporation0
- City of Monroe0
- City of Moultrie0
- City of Acworth0
- Fitzgerald Wtr Lgt & Bond Comm0
- City of Norcross0
- City of Thomaston0
- Fort Valley Utility Comm0
- City of Cairo0
- City of Elberton0
- City of LaFayette0
- City of Fairburn0
- City of Forsyth0
- City of Barnesville0
- City of Commerce0
- City of Adel0
- City of Camilla0
- City of Sylvester0
- City of Hampton0
- City of Blakely0
- City of Quitman0
- City of Palmetto0
- City of Hogansville0
- City of Jackson0
- City of West Point0
- City of Monticello0
- City of Grantville0
- City of Ellaville0
- City of Oxford0
- City of Doerun0
- City of Whigham0
- City of Mansfield0
- Town of Brinson0
- Tennessee Valley Authority0
Residential customers in Georgia per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.