Crisp County Power Comm interconnection application

Crisp County Power Comm is a public power district serving 9,210 residential customers in Georgia (EIA-861, 2025). Gridpol files Crisp County Power Comm interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Georgia’s commission rule (O.C.G.A. 46-3-50 to 46-3-56 (Georgia Cogeneration and Distributed Generation Act of 2001)) does not bind public power districts; Crisp County Power Comm sets its own interconnection policy. We confirm its form on the first project. EMCs and municipal utilities are covered by the Act; rates set by their governing bodies instead of PSC; each publishes own DG interconnection policy (e.g. Altamaha EMC, Carroll EMC, City of Cartersville).

Crisp County Power Comm at a glance

Utility

Crisp County Power Comm

Type

Public power district

EIA utility ID

4538

Residential customers

9,210 (EIA-861, 2025)

Net-metered residential customers

6 (EIA-861, 2025)

Service territory

5 counties in Georgia

Documents Crisp County Power Comm asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for Crisp County Power Comm. We confirm Crisp County Power Comm’s exact list on the first project.

Georgia interconnection rule

Commission

Georgia Public Service Commission

Interconnection rule

O.C.G.A. 46-3-50 to 46-3-56 (Georgia Cogeneration and Distributed Generation Act of 2001) – Cogeneration and Distributed Generation · source

Applies to

All electric service providers: electric utilities (Georgia Power), electric membership corporations and municipal electric utilities (O.C.G.A. 46-3-52)

Application form

No statewide form; written agreement between provider and customer generator (46-3-54); each provider uses own interconnection application/agreement (e.g. Georgia Power DG Interconnection Guidelines, EMC DG policies)

Timelines

No statutory or PSC review timelines found.

Fees

Fees limited to direct costs of interconnecting/administering metering; no standby, capacity, interconnection or other fees beyond monthly service charge unless customer agrees or commission/governing body approves (46-3-54).

Insurance

Provider may not require additional liability insurance from a facility meeting NEC, NESC, IEEE and UL requirements (46-3-56).

External disconnect

Not addressed in statute; utility-specific (e.g. Georgia Power DG construction guidelines).

Export compensation

Utility-specific – O.C.G.A. 46-3-55, 46-3-56
Bidirectional metering with excess credited at rate filed with commission; providers must buy first-come first-served until 0.2% of prior-year annual peak demand, at not more than avoided energy cost. Georgia Power offers monthly netting/buyback per PSC-approved tariffs.

Not bound by the rule

EMCs and municipal utilities are covered by the Act; rates set by their governing bodies instead of PSC; each publishes own DG interconnection policy (e.g. Altamaha EMC, Carroll EMC, City of Cartersville).

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.