Electric cooperativeCobb EMC interconnection application
Cobb EMC is an electric cooperative serving 203,131 residential customers in Georgia (EIA-861, 2025). Applications: Own online portal (Cobb EMC Interconnect Application). Gridpol files Cobb EMC interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Cobb EMC’s official sources (see below). Battery rules and PE requirements not published.
Cobb EMC at a glance
Cobb Electric Membership Corp
TypeElectric cooperative
EIA utility ID3916
Residential customers203,131 (EIA-861, 2025)
Net-metered residential customers628 (EIA-861, 2025)
Service territory5 counties in Georgia
How to applyOwn online portal – Cobb EMC Interconnect Application · official link
Who submitsMember starts application and names contractor; contractor receives email to complete technical portion (system specifications).
Export compensationNet billing – Distributed Generation Service rate schedule (2026)
Net meter; surplus paid at avoided cost ($0.05121/kWh for systems connected on/after July 1, 2015; $0.0683 for older). Any rate except Even Bill.
Interconnect agreement must be completed at least 45 days before intended interconnection date.
Wholesale supplier / associationOglethorpe Power Corporation / Georgia Transmission Corporation
Documents Cobb EMC asks for
- Interconnection application formOnline interconnect agreement application, ≥45 days before intended interconnection Gridpol prepares this.
- Interconnection agreementDistributed Generation Facility Interconnection Agreement
- PV module spec sheetTechnical specifications entered by contractor
- Final inspection sign-offFinal city/county inspection report sent to Cobb EMC
How the Cobb EMC process runs
- Member starts online interconnect application (≥45 days ahead) and names contractor.
- Contractor completes technical section.
- Cobb EMC approves; install (interconnection at breaker panel).
- Contractor obtains final city/county inspection and sends report.
- Cobb EMC replaces meter with net meter.
Fees
| Fee | Applies to | Note |
|---|---|---|
| $100 | Interconnection fee | Billed to member account |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|
No size limits stated on page. Georgia Cogeneration and Distributed Generation Act of 2001 (O.C.G.A. 46-3-50 et seq.): EMC purchase obligation limited to residential ≤10 kW / commercial ≤100 kW, first come first served to 0.2% of prior-year peak.
Storage, EV and stamps
Battery storage
Not covered in rooftop solar guide (separate Battery Storage page).
Sources
- Cobb EMC - I'm ready to install rooftop solar: https://www.cobbemc.com/im-ready-install-rooftop-solar (retrieved 2026-11-13)
- Cobb EMC Distributed Generation Service rate schedule 2026: https://www.cobbemc.com/sites/default/files/documents/rates/residential/2026/0226_DG_Rate_Schedule.pdf (retrieved 2026-11-13)
Other utilities in Georgia
- Georgia Power2,480,484
- Jackson EMC245,849
- Sawnee EMC182,849
- GreyStone Power142,841
- Walton EMC133,581
- Snapping Shoals El Member Corporation106,304
- North Georgia Electric Member Corporation90,932
- Flint Electric Membership Corporation85,358
- Coweta-Fayette El Member Corporation83,660
- Colquitt Electric Membership Corporation66,177
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.