Home › Utilities › Georgia › Sawnee EMC
Electric cooperativeSawnee EMC interconnection application
Sawnee EMC is an electric cooperative serving 182,849 residential customers in Georgia (EIA-861, 2025). Applications: PDF + email (Interconnection documents emailed to interconnections@sawnee.coop). Gridpol files Sawnee EMC interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. Not verified: Sawnee site and file host block us; archive.org has the 2024-09-17 interconnection page and PV FAQ but not the Small DG procedure PDF, so the document checklist, fees and PTO step are unconfirmed. Documents: Policy 412 (09-05-2023), Small-Distributed-Generation-Resources-2021-v2.pdf, NEM-16 rider.
Sawnee EMC at a glance
Sawnee Electric Membership Corporation
TypeElectric cooperative
EIA utility ID16865
Residential customers182,849 (EIA-861, 2025)
Net-metered residential customers630 (EIA-861, 2025)
Service territory7 counties in Georgia
How to applyPDF + email – Interconnection documents emailed to interconnections@sawnee.coop · official link
Who submitsMember (signed Sawnee EMC membership application required) with installer.
Export compensationNet billing – Net Energy Metering Rate Rider (NEM-16)
Member keeps normal rate schedule for purchases and gets instant credit for kWh pushed to grid at the NEM rate in effect; first come, first served within program limits (Sawnee PV FAQ).
Applications valid for 90 days once approval for install is granted (Sawnee interconnection page).
Wholesale supplier / associationOglethorpe Power Corporation / Georgia Transmission Corporation
Documents Sawnee EMC asks for
- Interconnection application formInterconnection procedure document / SEMC application Gridpol prepares this.
- Single-line diagram (one-line)Electrical drawing Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetSpecification sheets
- Inverter spec sheetUL 1741 listed
- Other utility-specific document (when applicable)HOA approval if in HOA-governed subdivision
How the Sawnee EMC process runs
- Member (signed membership application) and installer prepare the Small DG interconnection procedure forms (size, UL listings, NEC compliance).
- Email interconnection documents to interconnections@sawnee.coop before installation (all requests directed to VP of Member Services per interconnection page).
- Sawnee reviews; if approved, issues approval to install (valid 90 days).
- Obtain local permits and install.
- NEM acceptance; Sawnee typically reprograms the existing meter remotely for NEM (PV FAQ).
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Small DG (procedure 'Small') | 100 kW | Residential ≤10 kW AC; commercial ≤100 kW AC |
| Large DG | >100 kW, separate 'Large' procedure | |
| Net metering cap | 10 kW |
Georgia Cogeneration and Distributed Generation Act of 2001 (O.C.G.A. 46-3-50 et seq.): EMC purchase obligation limited to residential ≤10 kW / commercial ≤100 kW, first come first served to 0.2% of prior-year peak.
Storage, EV and stamps
Battery storage
PV FAQ: battery backup possible with proper inverter and protection scheme; no further storage rules found.
Sources
- Sawnee EMC - Solar: https://sawnee.coop/content/solar (retrieved 2026-11-13)
- Sawnee EMC Interconnection (archive.org capture 2024-09-17): https://web.archive.org/web/20240917051855/https://sawnee.coop/interconnection (retrieved 2026-11-13)
- Sawnee EMC PV System FAQ v2 (archive.org capture 2024-09-20): https://web.archive.org/web/20240920131332/https://file.sawnee.coop/web-docs/solar/PV-System-FAQ-v2.pdf (retrieved 2026-11-13)
- Sawnee Small Distributed Generation Resources procedure (not retrieved): https://file.sawnee.coop/web-docs/library/Small-Distributed-Generation-Resources-2021-v2.pdf (retrieved 2026-11-13)
- Sawnee DG Facilities Policy 412 (not retrieved): https://file.sawnee.coop/web-docs/library/Distributed-Generation-Facilities-Policy-412-09052023.pdf (retrieved 2026-11-13)
- Sawnee Net Metering Rider NEM-16 (not retrieved): https://file.sawnee.coop/web-docs/rates/Net-Metering-Rider-NEM-16.pdf (retrieved 2026-11-13)
Georgia interconnection rule
Georgia Public Service Commission
Interconnection ruleO.C.G.A. 46-3-50 to 46-3-56 (Georgia Cogeneration and Distributed Generation Act of 2001) – Cogeneration and Distributed Generation · source
Applies toAll electric service providers: electric utilities (Georgia Power), electric membership corporations and municipal electric utilities (O.C.G.A. 46-3-52)
Application formNo statewide form; written agreement between provider and customer generator (46-3-54); each provider uses own interconnection application/agreement (e.g. Georgia Power DG Interconnection Guidelines, EMC DG policies)
TimelinesNo statutory or PSC review timelines found.
FeesFees limited to direct costs of interconnecting/administering metering; no standby, capacity, interconnection or other fees beyond monthly service charge unless customer agrees or commission/governing body approves (46-3-54).
InsuranceProvider may not require additional liability insurance from a facility meeting NEC, NESC, IEEE and UL requirements (46-3-56).
External disconnectNot addressed in statute; utility-specific (e.g. Georgia Power DG construction guidelines).
Export compensationUtility-specific – O.C.G.A. 46-3-55, 46-3-56
Bidirectional metering with excess credited at rate filed with commission; providers must buy first-come first-served until 0.2% of prior-year annual peak demand, at not more than avoided energy cost. Georgia Power offers monthly netting/buyback per PSC-approved tariffs.
EMCs and municipal utilities are covered by the Act; rates set by their governing bodies instead of PSC; each publishes own DG interconnection policy (e.g. Altamaha EMC, Carroll EMC, City of Cartersville).
- O.C.G.A. 46-3-52 Definitions: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-52/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-54: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-54/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-55: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-55/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-56: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-56/ (retrieved 2026-11-13)
Other utilities in Georgia
- Georgia Power2,480,484
- Jackson EMC245,849
- Cobb EMC203,131
- GreyStone Power142,841
- Walton EMC133,581
- Snapping Shoals El Member Corporation106,304
- North Georgia Electric Member Corporation90,932
- Flint Electric Membership Corporation85,358
- Coweta-Fayette El Member Corporation83,660
- Colquitt Electric Membership Corporation66,177
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.