GreyStone Power is an electric cooperative serving 142,841 residential customers in Georgia (EIA-861, 2025). Applications: Own online portal (GreyStone online Residential Application (formtracking) + contractor upload link). Gridpol files GreyStone Power interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from GreyStone Power’s official sources (see below).

GreyStone Power at a glance

Utility

GreyStone Power Corporation

Type

Electric cooperative

EIA utility ID

7090

Residential customers

142,841 (EIA-861, 2025)

Net-metered residential customers

607 (EIA-861, 2025)

Service territory

8 counties in Georgia

How to apply

Own online portal – GreyStone online Residential Application (formtracking) + contractor upload link · official link

Who submits

Homeowner/business completes and signs online application; contractor gets email link to upload technical documents; DG Interconnection Agreement mailed to member and must be wet-signed (no DocuSign/copies).

Export compensation

Net billing – Distributed Generation Service rider
Credits at average annual avoided cost of energy ($0.02855/kWh as of rider effective date); availability until 0.2% of annual peak.

Documents GreyStone Power asks for

  • Interconnection application formOnline Residential Application Gridpol prepares this.
  • Site plan / site layoutUploaded by contractor Gridpol prepares this.
  • Single-line diagram (one-line)One-line diagram Gridpol prepares this.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • PV module spec sheetManufacturer data sheet of the modules.
  • Battery spec sheet (when applicable)Back-up battery information if applicable
  • Interconnection agreementOriginal wet signature required
  • Final inspection sign-offFinal signed jurisdictional approval (electrical permit), emailed; no screenshots

How the GreyStone Power process runs

  1. Member completes and signs online application.
  2. Contractor uploads site plan, one-line, inverter/panel specs, battery info.
  3. Engineering review; contractor told installation may begin.
  4. DG Interconnection Agreement mailed, wet-signed by member.
  5. After install, email signed electrical permit approval.
  6. Notice of permission to interconnect issued.

Fees

FeeApplies toNote
up to $500Inspection feePer DG Interconnection Agreement

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote

Systems >10 kW may require modifications and witness testing. Georgia Cogeneration and Distributed Generation Act of 2001 (O.C.G.A. 46-3-50 et seq.): EMC purchase obligation limited to residential ≤10 kW / commercial ≤100 kW, first come first served to 0.2% of prior-year peak.

Storage, EV and stamps

Battery storage

Back-up battery information uploaded with application.

Common issues the utility lists

  • Screenshots of passed permits not accepted.
  • DocuSigned or copied agreements not accepted.

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited