Home › Utilities › Georgia › Walton EMC
Electric cooperativeWalton EMC interconnection application
Walton EMC is an electric cooperative serving 133,581 residential customers in Georgia (EIA-861, 2025). Gridpol files Walton EMC interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. Documents and fees confirmed from current application PDF and page; NOT verified because submission channel (email/mail/in person) is not published - call Member Services 770-267-2505 on first project. Also open: review timelines, inspection requirement, storage rules, contents of OH/UG diagrams (scanned images, not readable).
Walton EMC at a glance
Walton Electric Member Corp
TypeElectric cooperative
EIA utility ID20065
Residential customers133,581 (EIA-861, 2025)
Net-metered residential customers689 (EIA-861, 2025)
Service territory10 counties in Georgia
Who submitsCustomer-owner (applicant where the facility is installed) signs the application; form has a separate Contractor Information section (company, contact, email), so installer is identified but no LOA/agent form is published. Facility must be owned and operated by the customer-owner on own premises.
Export compensationNet billing – Rate Schedule COGEN 2010 (avoided energy cost credit)
Bi-directional metering (customer side of meter): exported kWh credited at avoided energy cost, $0.026/kWh for 1/1/2026-12/31/2026; single-directional (co-op side): paid for metered energy delivered. Credit balance carried to next bill.
Oglethorpe Power Corporation / Georgia Transmission Corporation
Documents Walton EMC asks for
- Interconnection application formDistributed Generation Facilities and Interconnection Application/Agreement (rev. 2025-10): applicant + contractor info, WEMC meter #, generator type, inverter make/model/kW, panel make/model, W/panel, # panels, total kW, disconnect lever switch make/model/rating, OH/UG service and amp size, proposed installation and interconnection dates Gridpol prepares this.
- Single-line diagram (one-line)Single-line diagram of customer generating facilities and interconnection; service panel, disconnect switch, inverters, generators, breakers must show electrical rating and operating voltage Gridpol prepares this.
- Inverter spec sheetInverter manufacturer, model and power rating on form
- PV module spec sheetPanel manufacturer/model, watts per panel, number of panels on form
- Battery spec sheet (when applicable)Battery system manufacturer, model, kW and kWh on form if installed
- Customer signatureApplicant signature certifying information
- Other utility-specific document (when applicable)Walton EMC underground or overhead photovoltaic interconnection diagram (reference drawings) applies to installation type
How the Walton EMC process runs
- Complete Interconnection Application/Agreement with single-line diagram (contact Member Services 770-267-2505 for application details).
- Walton EMC handles each request individually; approval signed on form ('WEMC Official Use').
- Install per IEEE 1547 with disconnect lever switch per Walton EMC overhead/underground interconnection diagram.
- Meter change work order created; $800 bi-directional meter charge billed.
- Do not operate in parallel until written authorization for parallel operation is received from Walton EMC.
Fees
| Fee | Applies to | Note |
|---|---|---|
| $800 | Bi-directional meter (Rate Schedule COGEN 2010) | Added to power bill when the meter change work order is created; incremental metering cost and installation |
| actual cost | Interconnection | All interconnection costs paid by customer-owner; no application fee stated |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Residential | 50 kW | Peak generating capacity |
| Commercial | 100 kW | Peak generating capacity |
| Net metering cap | 50 kW |
Purchase obligation first come, first served until cumulative renewable capacity reaches 0.50% of prior-year annual peak demand (Georgia Cogeneration and DG Act of 2001).
Storage, EV and stamps
Battery storage
Application form asks for battery system manufacturer, model, kW and kWh; no further storage rules published.
Sources
- Walton EMC - Selling Your Solar Power: https://www.waltonemc.com/solar/rooftop-solar/selling-your-solar-power/ (retrieved 2026-11-13)
- Walton EMC - Distributed Generation Facilities and Interconnection Application/Agreement: https://www.waltonemc.com/wp-content/uploads/2025/10/Solar-interconnect-agreement-updated2.pdf (retrieved 2026-11-13)
- Walton EMC Metering Installation Guide (5/18/20), Sec. 5.1 Residential Renewable Generation: https://www.waltonemc.com/uploads/main/WEMC_Metering_Installtion_Guide_2020.pdf (retrieved 2026-11-13)
- Walton EMC - Underground photovoltaic interconnection diagram: https://www.waltonemc.com/wp-content/uploads/2022/02/URD_PHOTOVOLTAIC.pdf (retrieved 2026-11-13)
- Walton EMC - Overhead photovoltaic interconnection diagram: https://www.waltonemc.com/wp-content/uploads/2022/02/OH_PHOTOVOLTAIC.pdf (retrieved 2026-11-13)
Georgia interconnection rule
Georgia Public Service Commission
Interconnection ruleO.C.G.A. 46-3-50 to 46-3-56 (Georgia Cogeneration and Distributed Generation Act of 2001) – Cogeneration and Distributed Generation · source
Applies toAll electric service providers: electric utilities (Georgia Power), electric membership corporations and municipal electric utilities (O.C.G.A. 46-3-52)
Application formNo statewide form; written agreement between provider and customer generator (46-3-54); each provider uses own interconnection application/agreement (e.g. Georgia Power DG Interconnection Guidelines, EMC DG policies)
TimelinesNo statutory or PSC review timelines found.
FeesFees limited to direct costs of interconnecting/administering metering; no standby, capacity, interconnection or other fees beyond monthly service charge unless customer agrees or commission/governing body approves (46-3-54).
InsuranceProvider may not require additional liability insurance from a facility meeting NEC, NESC, IEEE and UL requirements (46-3-56).
External disconnectNot addressed in statute; utility-specific (e.g. Georgia Power DG construction guidelines).
Export compensationUtility-specific – O.C.G.A. 46-3-55, 46-3-56
Bidirectional metering with excess credited at rate filed with commission; providers must buy first-come first-served until 0.2% of prior-year annual peak demand, at not more than avoided energy cost. Georgia Power offers monthly netting/buyback per PSC-approved tariffs.
EMCs and municipal utilities are covered by the Act; rates set by their governing bodies instead of PSC; each publishes own DG interconnection policy (e.g. Altamaha EMC, Carroll EMC, City of Cartersville).
- O.C.G.A. 46-3-52 Definitions: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-52/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-54: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-54/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-55: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-55/ (retrieved 2026-11-13)
- O.C.G.A. 46-3-56: https://codes.findlaw.com/ga/title-46-public-utilities-and-public-transportation/ga-code-sect-46-3-56/ (retrieved 2026-11-13)
Other utilities in Georgia
- Georgia Power2,480,484
- Jackson EMC245,849
- Cobb EMC203,131
- Sawnee EMC182,849
- GreyStone Power142,841
- Snapping Shoals El Member Corporation106,304
- North Georgia Electric Member Corporation90,932
- Flint Electric Membership Corporation85,358
- Coweta-Fayette El Member Corporation83,660
- Colquitt Electric Membership Corporation66,177
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.