Home › Utilities › Tennessee › EPB (Electric Power Board of Chattanooga)
Municipal utilityEPB (Electric Power Board of Chattanooga) interconnection application
EPB (Electric Power Board of Chattanooga) is a municipal utility serving 176,219 residential customers in Georgia, Tennessee (EIA-861, 2025). Gridpol files EPB (Electric Power Board of Chattanooga) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. EPB pages (renewable-energy, epb-energy-pros) re-read 2026-11-13: no interconnection application, agreement, fees or checklist published. Verify on first project: call EPB 423-648-1372 for DG interconnection application/agreement, fees, required documents, insurance, metering, review time, Georgia service area rules.
EPB (Electric Power Board of Chattanooga) at a glance
City of Chattanooga (TVA local power company (municipal))
TypeMunicipal utility
EIA utility ID3408
Residential customers176,219 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory3 counties in Georgia, 6 counties in Tennessee
Who submitsCustomer contacts EPB Energy Pros for rooftop solar consultation (renewable energy form; EPB recommends TVA-approved, EnergyRight-trained contractors and offers free inspection of contractor work); formal interconnection application process not published.
Export compensationAvoided cost – No net metering; TVA Dispersed Power Production / TVA Green Connect for rooftop; EPB Solar Share community solar (sold out)
TVA (wholesale supplier) role: Tennessee has no state net metering mandate and the TN PUC does not regulate TVA local power companies (LPCs); the LPC sets its own interconnection rules under its TVA wholesale contract. For export compensation from TVA, the customer first establishes an interconnection agreement with the LPC and can then register in TVA's Dispersed Power Production (DPP) program to sell all or excess generation to TVA at avoided cost (time-of-day rates); metering at customer expense to TVA specs. Some LPCs (under TVA Long-Term Partnership flexibility) instead buy excess generation in their own programs.
Tennessee Valley Authority (TVA) - local power company (distributor) network · TVA Dispersed Power Production (DPP) Guidelines + Dispersed Power Price Schedule CSPP (Attachment A)
Documents EPB (Electric Power Board of Chattanooga) asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for EPB (Electric Power Board of Chattanooga). We confirm EPB (Electric Power Board of Chattanooga)’s exact list on the first project.
How the EPB (Electric Power Board of Chattanooga) process runs
- Contact EPB Energy Pros (renewable energy form) for rooftop solar consultation.
- Obtain EPB interconnection approval/agreement (process not published).
- Install, local inspection, EPB metering and written authorization (assumed per TVA LPC practice - not confirmed).
Sources
- EPB - How You Can Go Solar: https://epb.com/energy/renewable-energy/ (retrieved 2026-11-13)
- TVA Dispersed Power Production (DPP) Online Registration Process: https://www.tva.com/docs/default-source/1-float/dpp_customer_process_flow_finala99b8478-07f0-4731-89ce-f65bb2799261.pdf (retrieved 2026-11-13)
- TVA DPP program guidelines/pricing (Feb 28, 2022): https://www.tva.com/docs/default-source/1-float/march_2022_dpp_documents_for_publishinga32159c4-5499-417b-9b01-71e57b29f6df.pdf (retrieved 2026-11-13)
- EPB Energy Pros - Solar Energy Consultation / Approved Contractors (TVA-approved, EnergyRight guidelines): https://epb.com/energy/epb-energy-pros/ (retrieved 2026-11-13)
Tennessee interconnection rule
TVA role and no-net-metering confirmed from TVA FAQ (2021). TPUC jurisdiction statement (only Kingsport Power) not verified from TPUC source; Dispersed Power Production terms (size limits, rate) not retrieved; tva.com blocks direct fetch.
Tennessee Public Utility Commission (TPUC); Tennessee Valley Authority (TVA) as wholesale supplier/regulator of its local power companies
Interconnection rule– No general TPUC small-generator interconnection rule. TVA-area local power companies (munis/coops) use TVA program standards (Green Connect / Dispersed Power Production) and their own interconnection agreements. · source
Applies toNearly all of Tennessee is served by TVA-supplied municipal and cooperative local power companies (LPCs), whose retail rates and DG policies are governed by TVA wholesale contracts, not TPUC. TPUC regulates only investor-owned Kingsport Power (AEP Appalachian Power) in electricity; no TPUC interconnection rule was found.
Application formLPC-specific interconnection application/agreement; in participating LPCs the TVA Green Connect portal (www.greenconnect.com) or paper application is used for residential PV with TVA Quality Contractor Network (QCN) installer.
TimelinesGreen Connect: no time limit to install after application while program active; installation verification (1-2 hours) by Green Connect team with homeowner/installer/inspectors before commissioning (TVA Green Connect FAQ).
FeesLPC-specific ('pays all necessary fees' per TVA FAQ).
InsuranceTVA does not require liability insurance; many local power companies have their own liability insurance requirements (TVA Green Connect FAQ Q23).
Export compensationNone statewide – TVA Green Connect FAQ Q20-21
Net metering is not available in the TVA service area. Excess energy can be compensated via TVA Dispersed Power Production (with the local power company). Behind-the-meter PV allowed.
TVA local power companies (municipal utilities and cooperatives) set their own interconnection procedures and agreements; Green Connect participation is voluntary per LPC (residential PV, TVA QCN installer, TVA program standards, installation verification). Excess generation via TVA Dispersed Power Production.
- TVA Green Connect FAQs (Apr. 2021): https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/energy/valley-renewable-energy/gc-faqs-final-20210415.pdf?sfvrsn=d2d7479_2 (retrieved 2026-11-13)
- TVA Green Connect page (archive.org copy, Apr. 2025): https://web.archive.org/web/20250404053108/https://www.tva.com/energy/valley-renewable-energy/green-connect (retrieved 2026-11-13)
Other utilities in Tennessee
- Nashville Electric Service (NES)424,808
- Memphis Light, Gas and Water (MLGW)385,015
- Middle Tennessee Electric (MTE)311,520
- Knoxville Utilities Board (KUB)196,674
- Volunteer Electric Cooperative105,248
- Cumberland Electric Member Corporation101,734
- City of Clarksville77,509
- Johnson City72,729
- Duck River Electric Member Corporation71,969
- City of Lenoir63,379
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.