Tampa Electric interconnection application

Tampa Electric is an investor-owned utility serving 768,806 residential customers in Florida (EIA-861, 2025). Applications: Own online portal (Tampa Electric online solar / battery / combo interconnection application). Gridpol files Tampa Electric interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Tampa Electric’s official sources (see below).

Tampa Electric at a glance

Utility

Tampa Electric Co (Emera)

Type

Investor-owned utility

EIA utility ID

18454

Residential customers

768,806 (EIA-861, 2025)

Net-metered residential customers

32,662 (EIA-861, 2025)

Service territory

4 counties in Florida

How to apply

Own online portal – Tampa Electric online solar / battery / combo interconnection application · official link

Who submits

Customer or contractor; signed agreement emailed to customer and contractor at PTO.

Export compensation

NEM – Net Metering (Rule 25-6.065)
Net meter customers must be on standard residential rate (not Energy Planner); annual excess paid at COG-1 per FL rule.

Review time (official)

Per FAC 25-6.065(7) (IOUs): within 10 business days utility confirms application complete or lists deficiencies; agreement executed by utility within 30 calendar days of completed application (90 days if Tier 3 study needed); utility inspections within 30 calendar days of request; customer must notify utility 10 days before initial parallel operation.

Documents Tampa Electric asks for

  • Interconnection agreementTier 1 (tariff sheet 8.1000), Tier 2 (8.1035), Tier 3 (8.1070); battery/V2G agreement (8.1150) for batteries ≥1 kW
  • Interconnection application formOnline solar, battery, or solar+battery (combo) application; separate forms for adding panels/batteries Gridpol prepares this.
  • Inverter spec sheetManufacturer installation, operation and maintenance instructions for inverter (web link acceptable); battery too if storage
  • Photos (meter, main panel, equipment)Photo of visible-load-break disconnect adjacent to meter with engraved placard 'ON-SITE GENERATION UTILITY DISCONNECT SWITCH'
  • Final inspection sign-offProof of inspection and approval by local code authority
  • Proof of insurance (when applicable)Tier 2 ≥$1M, Tier 3 ≥$2M general liability, renewed annually; battery ≤15 kW AC ≥$100k, >15 kW ≥$1M

How the Tampa Electric process runs

  1. Download and complete the tier-appropriate interconnection agreement (and battery agreement if storage); read and accept Electrical Standards (SESR).
  2. Install; obtain local code authority inspection approval; install labeled disconnect.
  3. Submit online application (solar / battery / combo) with documents.
  4. Pay application fee online (Customer Number 906) or by check to EMS Team (Tier 2/3).
  5. Tampa Electric inspects system and sets bi-directional meter.
  6. Signed Interconnection Agreement emailed to customer and contractor = permission to operate.

Fees

FeeApplies toNote
$0Tier 1 ≤10 kW AC
$250Tier 2 >10-100 kW AC
$500Tier 3 >100 kW-2 MWInterconnection study may be required
$37Failed/incomplete inspection, each re-inspection, lock install/removal

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Tier 110 kW
Tier 2100 kW
Tier 32000 kW
Net metering cap2000 kW

Rated in AC. Tier 1 disconnect switch reimbursed up to $320 single-phase / $395 three-phase.

Storage, EV and stamps

Battery storage

Battery energy storage and V2G require separate battery interconnection agreement (sheet 8.1150) and review; batteries are interconnected but not net metered.

Common issues the utility lists

  • Inspection cannot be completed (no meter access, failed inspection) - $37 fee per attempt.
  • Missing disconnect placard photo; Electrical Standards not accepted (application cannot be submitted).

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited