Home › Utilities › Florida › Florida Public Utilities (FPU)

Investor-owned utility

Florida Public Utilities (FPU) interconnection application

Florida Public Utilities (FPU) is an investor-owned utility serving 26,053 residential customers in Florida (EIA-861, 2025). Applications: PDF + email (FPU solar interconnection application (email or mail to division office)). Gridpol files Florida Public Utilities (FPU) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Florida Public Utilities (FPU)’s official sources (see below). Application PDF direct link and division email addresses not captured (obfuscated on page).

Florida Public Utilities (FPU) at a glance

Utility

Florida Public Utilities Co (Chesapeake Utilities)

Type

Investor-owned utility

EIA utility ID

6457

Residential customers

26,053 (EIA-861, 2025)

Net-metered residential customers

623 (EIA-861, 2025)

Service territory

4 counties in Florida

How to apply

PDF + email – FPU solar interconnection application (email or mail to division office) · official link

Who submits

Customer submits (works with a qualified solar contractor); separate contacts for Northeast Division (Nassau County/Amelia Island, Fernandina Beach) and Northwest Division (Jackson, Calhoun, Liberty counties, Marianna).

Export compensation

NEM – Net Metering (Rule 25-6.065)
Credits for excess energy per tariff; banked energy credits shown on bill.

Review time (official)

Per FAC 25-6.065(7) (IOUs): within 10 business days utility confirms application complete or lists deficiencies; agreement executed by utility within 30 calendar days of completed application (90 days if Tier 3 study needed); utility inspections within 30 calendar days of request; customer must notify utility 10 days before initial parallel operation. FPU page gives no specific timeline.

Documents Florida Public Utilities (FPU) asks for

  • Interconnection application formSolar interconnection application (download from FPUC.com or local office) Gridpol prepares this.
  • PV module spec sheetSystem specifications
  • Single-line diagram (one-line)Engineering drawings Gridpol prepares this.
  • Interconnection agreementSigned agreement per Rule 25-6.065 / FPU Interconnection Agreement
  • UL 1741 / IEEE 1547 certificationDocumentation of compliance with IEEE 1547, IEEE 1547.1, UL 1741 before agreement execution
  • Final inspection sign-offApproval by local code officials before parallel operation; required permits
  • Proof of insurance (when applicable)Tier 2 $1,000,000; Tier 3 $2,000,000 general liability
  • Other utility-specific document (when applicable)Copy of lease agreement if facility leased from third party

How the Florida Public Utilities (FPU) process runs

  1. Select solar contractor.
  2. Submit interconnection application with specifications, drawings, permits, signed agreement, inspection documentation.
  3. FPU engineering review (may request more information).
  4. Contractor installs; local inspections passed.
  5. Metering and final verification (possible FPU field verification).
  6. FPU authorizes operation.

Fees

FeeApplies toNote
$0Tier 1 ≤10 kW
$350Tier 2 and Tier 3Non-refundable
$2,000Tier 3 interconnection study (if required)Unused amount refunded

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Tier 110 kW
Tier 2100 kW
Tier 32000 kW
Net metering cap2000 kW

Gross power rating = AC nameplate; inverter systems DC x 0.85.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited