Home › Utilities › Florida › Lakeland Electric

Municipal utility

Lakeland Electric interconnection application

Lakeland Electric is a municipal utility serving 122,506 residential customers in Florida (EIA-861, 2025). Applications: PDF + email (PV-ESS Agreement (all tiers) with Appendix B Application and Compliance Form, to Lakeland Electric Solar Team (solar@lakelandelectric.com; 501 E Lemon St, Mail Code LE-ED ENG, Lakeland FL 33801)). Gridpol files Lakeland Electric interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Lakeland Electric’s official sources (see below). Verified 2026-11-13 from lakelandelectric.com solar page and PV-ESS Agreement (rev. 12/18/2019). Submission channel: agreement names LE Solar Team (solar@lakelandelectric.com) – page lists SolarRates@lakelandelectric.com for questions; confirm preferred inbox on first project. No interconnection fee published.

Lakeland Electric at a glance

Utility

City of Lakeland (City of Lakeland (municipal))

Type

Municipal utility

EIA utility ID

10623

Residential customers

122,506 (EIA-861, 2025)

Net-metered residential customers

2,130 (EIA-861, 2025)

Service territory

1 county in Florida

How to apply

PDF + email – PV-ESS Agreement (all tiers) with Appendix B Application and Compliance Form, to Lakeland Electric Solar Team (solar@lakelandelectric.com; 501 E Lemon St, Mail Code LE-ED ENG, Lakeland FL 33801) · official link

Who submits

Customer signs agreement and notarized indemnification; FL-licensed installation contractor completes contractor section and compliance certification (Appendix B). Signed Lakeland Electric PV agreement is also needed for the City building permit.

Export compensation

NEM – Net metering / Solar Price Plan
Excess kWh credit carried forward to next billing cycle; customer is never paid for excess energy (agreement §8). Page: credited at full retail rate; Solar Price Plan $6.08/kW peak demand + $0.0282/kWh.

Review time (official)

Written approval within 10 business days after request for inspection and approval (agreement §4).

Documents Lakeland Electric asks for

  • Interconnection agreementAgreement for parallel connection of PV and/or ESS up to 2 MW, signed by customer and City
  • Interconnection application formAppendix B Application and Compliance Form: PV array DC watts, module/inverter models, ESS model and Wh, locations, AC disconnect location, contractor FL license # Gridpol prepares this.
  • Customer signatureAppendix C Hold Harmless/Indemnification signed by customer and notarized
  • Proof of insuranceProof of general liability ≥$100,000 (homeowner's policy may satisfy)
  • Final inspection sign-offWritten documentation of Final Electrical Inspection from City/County
  • UL 1741 / IEEE 1547 certificationInverter UL 1741, modules UL 1703 / IEEE 1262, ESS UL 1642 listing; installed per IEEE 1547 and NEC
  • Site plan / site layoutFor City building permit Gridpol prepares this.
  • PV module spec sheetSpec sheets for permit
  • Photos (meter, main panel, equipment) (when applicable)LE may take or request photographs during inspection

How the Lakeland Electric process runs

  1. Optional PV audit; select FL-licensed solar contractor.
  2. Complete and sign PV-ESS Agreement, Appendix B application (contractor + owner sections) and notarized Appendix C; provide proof of insurance; notify LE if >10 kW (Tier 2/3 may need study).
  3. Obtain City building permit (signed agreement, site plan, spec sheets) and install with lockable external disconnect adjacent to meter.
  4. Pass City/County final electrical inspection and submit documentation to LE.
  5. LE inspects and signs utility approval (within 10 business days of request); no parallel operation before written approval.
  6. LE installs bi-directional metering on first day of following billing cycle.

Size levels and limits

LevelUp toNote
Tier 110 kWPV array <10 kW (SOC); notify LE immediately if >10 kW
Tier 2100 kWInterconnection study and charge may be required
Tier 32000 kWInterconnection study and charge may be required

Total PV-ESS may not exceed 100% of customer's annual consumption; if >90% of transformer/service capacity, upgrades at customer cost. Net metering page: residential up to 10 kW, commercial up to 500 kW.

Storage, EV and stamps

Battery storage

ESS covered by the same PV-ESS agreement; ESS must be UL 1642 listed; ESS model, Wh and inverter listed in Appendix B; agreement includes metering diagrams for solar with battery storage.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited