Clay Electric is an electric cooperative serving 173,966 residential customers in Florida (EIA-861, 2025). Applications: PDF + email (Interconnection Agreement + Net Meter Application to Clay Electric Energy Services (solar@clayelectric.com)). Gridpol files Clay Electric interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Clay Electric’s official sources (see below). Battery rules not published.

Clay Electric at a glance

Utility

Clay Electric Cooperative, Inc (Seminole Electric Cooperative (wholesale supplier))

Type

Electric cooperative

EIA utility ID

3757

Residential customers

173,966 (EIA-861, 2025)

Net-metered residential customers

3,287 (EIA-861, 2025)

Service territory

15 counties in Florida

How to apply

PDF + email – Interconnection Agreement + Net Meter Application to Clay Electric Energy Services (solar@clayelectric.com) · official link

Who submits

Member and/or contractor supply documents; letter and signed agreement sent to member and contractor.

Export compensation

Net billing – Avoided-cost net billing (interconnected after May 1, 2022)
Excess kWh do not bank; credited at wholesale/avoided cost. Pre-May 2022 systems on banked program until 2037 unless account changes.

Wholesale supplier / association

Seminole Electric Cooperative, Inc.

Documents Clay Electric asks for

  • Interconnection agreementUtility agreement signed by the customer, usually after review.
  • Interconnection application formNet Meter Application Gridpol prepares this.
  • PV module spec sheetPV panel information
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Single-line diagram (one-line)Line diagram of electrical connections and system specs Gridpol prepares this.
  • Final inspection sign-offCounty electrical permit with final inspection notice
  • Proof of insurance (when applicable)$1,000,000 property/personal liability for systems ≥10 kW (Tiers 2 and 3)

How the Clay Electric process runs

  1. Sign and submit Interconnection Agreement and Net Meter Application (pre-approval if ≥20 kW).
  2. Contractor installs.
  3. Submit net meter request and documents.
  4. Clay Electric reviews and processes.
  5. Net meter installed and photographed ($60 trip fee).
  6. Letter and signed agreement sent to member and contractor; account on net meter program.

Fees

FeeApplies toNote
$60Net meter installation trip fee

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Net metering cap1000 kW

Up to 90% of member service entrance rating or co-op transformer kVA, whichever less; ≥20 kW requires engineering pre-approval of drawings; 1 MW max.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited