WREC interconnection application

WREC is an electric cooperative serving 231,677 residential customers in Florida (EIA-861, 2025). Applications: PDF + email (Application for Operation of Renewable Generation System (RGS) + Net Metering Agreement, emailed to rgs@wrec.net). Gridpol files WREC interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from WREC’s official sources (see below). Fees and size tiers not published; confirm with WREC engineering (352) 567-5133.

WREC at a glance

Utility

Withlacoochee River Elec Coop (Seminole Electric Cooperative (wholesale supplier))

Type

Electric cooperative

EIA utility ID

20885

Residential customers

231,677 (EIA-861, 2025)

Net-metered residential customers

5,637 (EIA-861, 2025)

Service territory

5 counties in Florida

How to apply

PDF + email – Application for Operation of Renewable Generation System (RGS) + Net Metering Agreement, emailed to rgs@wrec.net · official link

Who submits

Contractor and/or WREC member completes fillable PDF; contractor signs and certifies UL 1741/IEEE 1547 compliance.

Export compensation

NEM – Net Metering Agreement
Annual excess bought at Seminole Electric Cooperative avoided cost.

Wholesale supplier / association

Seminole Electric Cooperative, Inc.

Documents WREC asks for

  • Interconnection application formFillable PDF (no handwritten or image copies) incl. 7-digit account number Gridpol prepares this.
  • Interconnection agreementNet Metering Agreement
  • Single-line diagram (one-line)Engineering-quality one-line PDF (permit set), panel count/size, battery interconnect/size/qty; no hand-drawn Gridpol prepares this.
  • PV module spec sheetModule and inverter specifications PDF
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Proof of insurance (when applicable)$1,000,000 liability for RGS >10 kW AC

How the WREC process runs

  1. Complete application PDF and Net Metering Agreement.
  2. Email single multipage PDF package to rgs@wrec.net (mail is slower).
  3. WREC may inspect array and verify equipment.
  4. After inspection and size verification, net meter installed.

Fees

FeeApplies toNote
$100Tampering charge if meter seal removed by non-WREC personnelNot an application fee; no application fee found

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote

Insurance threshold 10 kW AC; no other size limits published.

Storage, EV and stamps

Battery storage

Battery backup must be IEEE 1547/UL 1741 compliant; number and wattage of batteries on application and one-line.

Common issues the utility lists

  • Handwritten/picture applications rejected; incomplete packages delay net meter installation.
  • Contact WREC to remove meter seal ($100 tampering charge otherwise).

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited