Home › Utilities › Florida › LCEC

Electric cooperative

LCEC interconnection application

LCEC is an electric cooperative serving 236,578 residential customers in Florida (EIA-861, 2025). Applications: Own online portal (LCEC electronic Interconnection Agreement + secure document upload). Gridpol files LCEC interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from LCEC’s official sources (see below).

LCEC at a glance

Utility

Lee County Electric Coop, Inc (Seminole Electric Cooperative (wholesale supplier))

Type

Electric cooperative

EIA utility ID

10857

Residential customers

236,578 (EIA-861, 2025)

Net-metered residential customers

10,389 (EIA-861, 2025)

Service territory

6 counties in Florida

How to apply

Own online portal – LCEC electronic Interconnection Agreement + secure document upload · official link

Who submits

Member on the account must complete the documents (contractor may assist); Tier 3 contact LCEC designers first.

Export compensation

NEM – Net Metering Program (tariff Volume 3)
Excess kWh banked as reserves; unused reserves after December bill paid in January at calculated avoided wholesale rate ($0.02875/kWh for 2025); <$300 as bill credit, else check.

Review time (official)

No timeline stated.

Documents LCEC asks for

  • Interconnection application formApplication and Compliance Form (electronic) Gridpol prepares this.
  • Interconnection agreementTier-specific Interconnection Agreement
  • Final inspection sign-offPassed city/county inspection
  • Single-line diagram (one-line)Electric one-line diagram Gridpol prepares this.
  • Inverter spec sheetSpec sheet of inverter and other installed equipment
  • Proof of insurance (when applicable)Tier 2 and Tier 3 amounts per agreements

How the LCEC process runs

  1. Keep manual disconnect open except testing/inspection.
  2. Review Net Metering Guidelines and tier agreement; review rates.
  3. Tier 1/2: complete electronic Interconnection Agreement and Application and Compliance form with supporting documents (Tier 3: consult LCEC designer first).
  4. LCEC installs bidirectional meter after all documentation received.
  5. Permission to Operate letter; begin parallel operation.

Fees

FeeApplies toNote
$35Tier 1 0-10 kWBilled to account after agreement approved
$300Tier 2 >10-100 kWBilled after approval (tariff sheet says up to $1,000)
$1,000Tier 3 >100 kW-1 MWApplication fee

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Tier 110 kW
Tier 2100 kW
Tier 31000 kW
Net metering cap1000 kW

Gross power rating = inverter AC capacity (or DC x 0.85 if DC < inverter AC); cumulative behind one meter.

Common issues the utility lists

  • Operation before bidirectional meter installed is prohibited (tampering penalties, no credit).

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited