Indiana

Indiana interconnection applications

119 electric utilities serve Indiana (EIA-861, 2025): 6 investor-owned utilitys, 40 electric cooperatives, 73 municipal utilitys. Together they serve 2,934,465 residential customers; 11,490 residential customers were on net metering at year-end 2025.

Largest utilities in Indiana

Duke Energy IndianaPartly researched

Investor-owned utility · 808,572 residential customers · Indiana

Interconnection process and documents →
AES IndianaProcess verified

Investor-owned utility · 469,634 residential customers · Indiana

Applications: PowerClerk – AES Indiana Interconnection (PowerClerk)

Interconnection process and documents →
NIPSCOProcess verified

Investor-owned utility · 433,889 residential customers · Indiana

Applications: PDF + email – NIPSCO New Business Department (Rider 679 Application for Interconnection)

Interconnection process and documents →
Indiana Michigan Power (I&M)Process verified

Investor-owned utility · 537,980 residential customers · Indiana

Applications: PowerClerk – AEP PowerClerk

Interconnection process and documents →
CenterPoint Energy Indiana SouthProcess verified

Investor-owned utility · 134,700 residential customers · Indiana

Applications: PDF + email – CenterPoint New Service (fillable PDF with 'Submit Application' button, email or fax 888-287-2770)

Interconnection process and documents →
Hendricks County Rural E M CState guidance

Electric cooperative · 38,554 residential customers · Indiana

Interconnection process and documents →
South Central Indiana REMCState guidance

Electric cooperative · 35,216 residential customers · Indiana

Interconnection process and documents →
Northeastern Rural E M CState guidance

Electric cooperative · 31,034 residential customers · Indiana

Interconnection process and documents →
City of AndersonState guidance

Municipal utility · 29,600 residential customers · Indiana

Interconnection process and documents →
Tipmont Rural Electric Member CorporationState guidance

Electric cooperative · 29,540 residential customers · Indiana

Interconnection process and documents →
Johnson County Rural E M CState guidance

Electric cooperative · 29,132 residential customers · Indiana

Interconnection process and documents →
Clark County Rural E M CState guidance

Electric cooperative · 27,707 residential customers · Indiana

Interconnection process and documents →

Export compensation among the researched Indiana utilities: Net billing. Rules differ by utility – see each utility page.

Indiana interconnection rule

Commission

Indiana Utility Regulatory Commission (IURC)

Interconnection rule

170 IAC 4-4.3 (as amended by LSA #25-368, IURC RM #24-01) – Interconnection of customer facilities · source

Applies to

Investor-owned electric utilities subject to IURC jurisdiction (170 IAC 4-4.3-2). Municipal utilities and electric cooperatives are not covered.

Application form

Commission-approved interconnection application and interconnection agreement forms, used by each IOU (170 IAC 4-4.3-4(c)).

Timelines

Level 1/2: completeness notice 10 business days; determination 15 business days after complete; executable agreement 10 business days after approval; customer returns executed agreement at least 10 business days before operation; final approval after executed agreement and any inspection, conditioned on electrical code official approval (170 IAC 4-4.3-6, -7).

Fees

Level 1: no fee. Level 2: <= $50 + $1/kW nameplate (+ minor modifications/additional review, engineering <= $100/h). Level 3: <= $100 + $2/kW + study time (<= $100/h) (170 IAC 4-4.3-4(e)).

Insurance

Net metering facilities: liability coverage of at least $100,000 (homeowners, commercial or other); utility may not require higher limits or additional policies (170 IAC 4-4.2-8, referenced by 4-4.3-10(a)). Other customer facilities: only reasonable amounts of insurance against reasonably likely risks, mutual indemnification (170 IAC 4-4.3-10(b)).

External disconnect

Utility may require the applicant to include a disconnect switch as a supplement to the equipment package (170 IAC 4-4.3-4(d)).

Export compensation

Net billing – IC 8-1-40 (P.L.264-2017, SEA 309); 170 IAC 4-4.2 (net metering rule, legacy)
Net metering tariffs closed to new customers after June 30, 2022 (IC 8-1-40-11); legacy NEM customers continue per IC 8-1-40-13/-14. New distributed generation (<= lesser of 1 MW or average annual consumption, IC 8-1-40-3) is credited for excess distributed generation (instantaneous difference, IC 8-1-40-5) at 1.25 x the supplier's average marginal price of electricity of the prior year (IC 8-1-40-17). Applies to IURC-regulated public utilities; excludes municipally owned utilities and certain cooperatives (IC 8-1-40-4).

Not bound by the rule

Municipal utilities and REMC/electric cooperatives are not bound by 170 IAC 4-4.3 or IC 8-1-40 (IC 8-1-40-4 excludes them) and set their own interconnection and DG policies (many through Hoosier Energy / Wabash Valley Power member policies, not reviewed).

LevelUp toCriteria / review / fee
Level 1 (170 IAC 4-4.3-6)25 kWInverter-based, nameplate <= 25 kW (raised from 10 kW by RM #24-01), certified equipment (IEEE 1547-2018 / UL 1741) · Completeness 10 business days; approval/denial 15 business days after complete; agreement within 10 business days of approval · No application or other fee
Level 2 (170 IAC 4-4.3-7)2000 kWNameplate <= 2 MW, certified equipment, screens (e.g., network: lesser of 10% min load or 50 kW) · Completeness 10 business days; initial review 15 business days after complete; agreement within 10 business days · Up to $50 + $1/kW plus cost of minor modifications/additional review (engineering <= $100/h)
Level 3 (170 IAC 4-4.3-8)Facilities not qualifying for Level 1 or 2; impact and facilities studies · Up to $100 + $2/kW plus actual study time (<= $100/h); applicant pays required facilities

All 119 utilities in Indiana

Residential customers in Indiana per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited