Home › Utilities › Indiana › Indiana Michigan Power (I&M)
Investor-owned utilityIndiana Michigan Power (I&M) interconnection application
Indiana Michigan Power (I&M) is an investor-owned utility serving 537,980 residential customers in Indiana, Michigan (EIA-861, 2025). Applications: PowerClerk (AEP PowerClerk). Gridpol files Indiana Michigan Power (I&M) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Indiana Michigan Power (I&M)’s official sources (see below).
Indiana Michigan Power (I&M) at a glance
Indiana Michigan Power Co (American Electric Power)
TypeInvestor-owned utility
EIA utility ID9324
Residential customers537,980 (EIA-861, 2025)
Net-metered residential customers2,346 (EIA-861, 2025)
Service territory25 counties in Indiana, 6 counties in Michigan
How to applyPowerClerk – AEP PowerClerk · official link
Who submitsInstaller or customer registers in PowerClerk and submits the New Interconnection Service Request; customer signs via DocuSign and pays fee. Installer can grant customer read-only/read-write access.
Export compensationNet billing – IN: Excess Distributed Generation (EDG) Rider; MI: Distributed Generation (DG) Rider
IN applications after June 30, 2022 under EDG. MI net metering NMS-1/NMS-2 closed after Feb 1, 2020.
Meter installation typically 7-10 business days after verification. Fewer than 5% of projects need a study.
Documents Indiana Michigan Power (I&M) asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Site plan / site layoutSite location map Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Photos (meter, main panel, equipment)Panel location, current meter, area within 2 ft of meter
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Proof of insurance (when applicable)Indiana: proof of insurance, at least $100,000 liability
- Customer signatureDocuSign
- Interconnection agreementUtility agreement signed by the customer, usually after review.
- Final inspection sign-offLocal building inspection report, or electrician's letter if no local authority
- Photos (meter, main panel, equipment)Post-install: equipment, AC disconnect, inverter nameplate, meter, placards
How the Indiana Michigan Power (I&M) process runs
- 1-4. Submit request in PowerClerk, customer signs (DocuSign) and pays, I&M confirms complete application.
- 5-8. Distribution impact review, construction agreement if needed, sign Interconnection Agreement, approval to build.
- Install; upload inspection report and photos.
- I&M verifies and orders bi-directional meter.
- Meter install (typically 7-10 business days).
- Permission to Operate issued.
Fees
| Fee | Applies to | Note |
|---|---|---|
| $0 | IN: 10 kW or less | |
| $50 + $1/kW | IN: 11-2,000 kW | |
| $100 + $2/kW | IN: over 2,000 kW | |
| $50 | MI: legacy NEM or DG application | |
| $100 + $1/kWac | MI: non-export/fast track certified | |
| $300 | MI: pre-application report (Level 4-5) |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Net metering cap | 1000 kW |
IN: lesser of 1,000 kW or annual usage (EDG). MI: up to 110% of prior 12 months consumption, max 550 kW (DG).
Storage, EV and stamps
Battery storage
Battery storage treated as DER; IEEE 1547-2018 equipment required since Jan 1, 2024; visible lockable disconnect.
EV chargers
Indiana: plug-in EV tariff customers cannot operate under the EDG Rider.
PE stamp
IN: one-line PE-stamped for facilities over 50 kW. MI: over 20 kW PE seal or licensed electrical contractor signature with license number; over 550 kW PE seal. – PE-stamped drawings are not included in Gridpol.
Sources
- I&M CreateGreen Indiana: https://www.indianamichiganpower.com/business/builders/CreateGreen-IN (retrieved 2026-11-13)
- I&M CreateGreen Michigan: https://www.indianamichiganpower.com/business/builders/createGreen-MI (retrieved 2026-11-13)
Other utilities in Indiana
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.