Home › Utilities › Indiana › City of Troy
Municipal utilityCity of Troy interconnection application
City of Troy is a municipal utility serving 304 customers in Indiana (EIA-861, 2025). Gridpol files City of Troy interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Indiana’s commission rule (170 IAC 4-4.3 (as amended by LSA #25-368, IURC RM #24-01)) does not bind municipal utilitys; City of Troy sets its own interconnection policy. We confirm its form on the first project. Municipal utilities and REMC/electric cooperatives are not bound by 170 IAC 4-4.3 or IC 8-1-40 (IC 8-1-40-4 excludes them) and set their own interconnection and DG policies (many through Hoosier Energy / Wabash Valley Power member policies, not reviewed).
City of Troy at a glance
City of Troy
TypeMunicipal utility
EIA utility ID19227
Customers304 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory2 counties in Indiana
Documents City of Troy asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for City of Troy. We confirm City of Troy’s exact list on the first project.
Indiana interconnection rule
Indiana Utility Regulatory Commission (IURC)
Interconnection rule170 IAC 4-4.3 (as amended by LSA #25-368, IURC RM #24-01) – Interconnection of customer facilities · source
Applies toInvestor-owned electric utilities subject to IURC jurisdiction (170 IAC 4-4.3-2). Municipal utilities and electric cooperatives are not covered.
Application formCommission-approved interconnection application and interconnection agreement forms, used by each IOU (170 IAC 4-4.3-4(c)).
TimelinesLevel 1/2: completeness notice 10 business days; determination 15 business days after complete; executable agreement 10 business days after approval; customer returns executed agreement at least 10 business days before operation; final approval after executed agreement and any inspection, conditioned on electrical code official approval (170 IAC 4-4.3-6, -7).
FeesLevel 1: no fee. Level 2: <= $50 + $1/kW nameplate (+ minor modifications/additional review, engineering <= $100/h). Level 3: <= $100 + $2/kW + study time (<= $100/h) (170 IAC 4-4.3-4(e)).
InsuranceNet metering facilities: liability coverage of at least $100,000 (homeowners, commercial or other); utility may not require higher limits or additional policies (170 IAC 4-4.2-8, referenced by 4-4.3-10(a)). Other customer facilities: only reasonable amounts of insurance against reasonably likely risks, mutual indemnification (170 IAC 4-4.3-10(b)).
External disconnectUtility may require the applicant to include a disconnect switch as a supplement to the equipment package (170 IAC 4-4.3-4(d)).
Export compensationNet billing – IC 8-1-40 (P.L.264-2017, SEA 309); 170 IAC 4-4.2 (net metering rule, legacy)
Net metering tariffs closed to new customers after June 30, 2022 (IC 8-1-40-11); legacy NEM customers continue per IC 8-1-40-13/-14. New distributed generation (<= lesser of 1 MW or average annual consumption, IC 8-1-40-3) is credited for excess distributed generation (instantaneous difference, IC 8-1-40-5) at 1.25 x the supplier's average marginal price of electricity of the prior year (IC 8-1-40-17). Applies to IURC-regulated public utilities; excludes municipally owned utilities and certain cooperatives (IC 8-1-40-4).
Municipal utilities and REMC/electric cooperatives are not bound by 170 IAC 4-4.3 or IC 8-1-40 (IC 8-1-40-4 excludes them) and set their own interconnection and DG policies (many through Hoosier Energy / Wabash Valley Power member policies, not reviewed).
- IURC Final Rulemaking RM #24-01 (LSA #25-368), amended 170 IAC 4-4.3: https://www.in.gov/iurc/files/ord_RM24-01_093025.pdf (retrieved 2026-11-13)
- 170 IAC 4-4.2-8 Insurance (net metering): https://www.law.cornell.edu/regulations/indiana/170-IAC-4-4.2-8 (retrieved 2026-11-13)
- 170 IAC 4-4.2-1 Definitions (net metering): https://www.law.cornell.edu/regulations/indiana/170-IAC-4-4.2-1 (retrieved 2026-11-13)
- IURC handout: IC 8-1-40 statute text: https://secure.in.gov/iurc/files/2017-07-20-IURC-Tech-Conf-Handout-re-IC-8-1-40.pdf (retrieved 2026-11-13)
Other utilities in Indiana
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.