Municipal utilityCity & County of San Francisco interconnection application
City & County of San Francisco is a municipal utility serving 3,670 residential customers in California (EIA-861, 2025). Gridpol files City & County of San Francisco interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
California’s commission rule (CPUC Electric Tariff Rule 21 (utility-filed, CPUC-approved); D.20-09-035 timelines; current rulemaking R.25-08-004) does not bind municipal utilitys; City & County of San Francisco sets its own interconnection policy. We confirm its form on the first project. Publicly owned utilities are not under Rule 21 and set their own interconnection rules; PU Code §2827 net metering obligations applied to POUs until their 5% cap; POUs now offer own successor tariffs.
City & County of San Francisco at a glance
City & County of San Francisco
TypeMunicipal utility
EIA utility ID16612
Residential customers3,670 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory2 counties in California
Documents City & County of San Francisco asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for City & County of San Francisco. We confirm City & County of San Francisco’s exact list on the first project.
California interconnection rule
Rule 21 tariff PDFs not read in full (PG&E file too large, SDG&E host unreachable): insurance, disconnect, NEM/NBT fee and document list unverified; documents list is typical, confirm in tariff Section E. NBT cap 1 MW per PU Code 2827 eligibility - confirm.
California Public Utilities Commission (CPUC)
Interconnection ruleCPUC Electric Tariff Rule 21 (utility-filed, CPUC-approved); D.20-09-035 timelines; current rulemaking R.25-08-004 – Rule 21 - Generating Facility Interconnections · source
Applies toCPUC-jurisdictional IOUs: PG&E, SCE, SDG&E, Bear Valley Electric, Liberty Utilities (CalPeco); PacifiCorp uses OATT-based process under D.07-07-027. Not munis/POUs (LADWP, SMUD, IID etc.). Wholesale-market facilities go under WDT/CAISO.
Application formUtility-specific Rule 21 interconnection request forms filed with CPUC (e.g. SCE Form 14-957 for NEM/NBT, 14-732 non-export); submitted via each IOU's online portal.
TimelinesInitial Review 15 BD; Supplemental Review 20 BD; draft interconnection agreement or cost estimate within 15 BD after review; D.20-09-035 requires tracking of 19 timelines and standard construction/meter timelines.
Fees$800 interconnection request fee; $2,500 supplemental review (SCE page). NEM-2/NBT <=1 MW historically exempt from study costs; NEM/NBT request fee amount is utility-specific (not verified here).
Export compensationNet billing – Pub. Util. Code §2827.1; CPUC D.22-12-056 (Net Billing Tariff, 'Solar Billing Plan'); Res. E-5301
NBT applies to IOU applications submitted on/after 2023-04-15; exports credited at avoided-cost-based values; required TOU rates (E-ELEC, TOU-D-PRIME, EV-TOU-5); 9-year legacy. Earlier NEM 1.0/2.0 grandfathered.
Publicly owned utilities are not under Rule 21 and set their own interconnection rules; PU Code §2827 net metering obligations applied to POUs until their 5% cap; POUs now offer own successor tariffs.
- CPUC Rule 21 Interconnection: https://www.cpuc.ca.gov/Rule21/ (retrieved 2026-11-13)
- CPUC Net Energy Metering and Net Billing: https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/customer-generation/net-energy-metering-and-net-billing (retrieved 2026-11-13)
- SCE Interconnecting Generation under Rule 21: https://www.sce.com/business/smart-energy-solar/solar-for-business/grid-interconnections/interconnecting-generation-under-rule-21 (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.