Public power districtSMUD interconnection application
SMUD is a public power district serving 601,275 residential customers in California (EIA-861, 2025). Applications: PowerClerk (SMUD Interconnection (PowerClerk)). Gridpol files SMUD interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from SMUD’s official sources (see below). Fee amount and review timelines not stated; check SMUD Interconnection Guidelines.
SMUD at a glance
Sacramento Municipal Util Dist
TypePublic power district
EIA utility ID16534
Residential customers601,275 (EIA-861, 2025)
Net-metered residential customers62,657 (EIA-861, 2025)
Service territory3 counties in California
How to applyPowerClerk – SMUD Interconnection (PowerClerk) · official link
Who submitsContractor submits for the customer; self-installers may apply directly.
Export compensationNet billing – Solar and Storage Rate (SSR)
Exports credited at 9.6¢/kWh regardless of time/season.
Documents SMUD asks for
- Interconnection application formOnline in PowerClerk; customer email and phone Gridpol prepares this.
- Recent electric billMost recent SMUD bill: account no., meter no., service address (must match final building permit)
- Site plan / site layoutSolar site plan Gridpol prepares this.
- Single-line diagram (one-line)Labeled one-line or three-line drawing Gridpol prepares this.
- PV module spec sheetMake/model/qty of PV, inverter, AC disconnect; PV and inverter must be CEC-listed
- Other utility-specific document (when applicable)Proof of advanced inverter settings if applicable; new construction uses separate form
How the SMUD process runs
- Apply in PowerClerk and pay interconnection fee
- SMUD reviews, contacts if needed
- SMUD approves by email incl. required inverter settings
- Install; installer obtains local permit/inspection and configures advanced inverter functions
- Submit proof of inverter settings if applicable
- SMUD sets meter and issues PTO
- Billing set up
Fees
| Fee | Applies to | Note |
|---|---|---|
| one-time interconnection fee (amount not stated on page) | New solar, solar+battery, battery-only (since 1 Mar 2022) | Paid when submitting |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|
Solar and Storage Rate: up to 110% of last 12 months kWh, or 120% if battery storage added.
Storage, EV and stamps
Battery storage
Battery adds sizing allowance to 120%; battery-only systems also need interconnection; SMUD battery incentives available.
PE stamp
Commercial: CA-licensed PE-stamped single line if using the 120% busbar rule (commercial checklist). – PE-stamped drawings are not included in Gridpol.
Sources
- SMUD - Solar for your home: https://www.smud.org/Solar (retrieved 2026-11-13)
- SMUD Residential Solar Interconnection Checklist (6/25): https://www.smud.org/es/-/media/Documents/Going-Green/Solar-and-Storage/Residential-Solar-Interconnection-Checklist.ashx (retrieved 2026-11-13)
- SMUD - Solar for your business: https://www.smud.org/GOING-GREEN/Solar-for-Your-Business (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.