Wheeling Power is an investor-owned utility serving 34,202 residential customers in West Virginia (EIA-861, 2025). Applications: PowerClerk (AEP PowerClerk). Gridpol files Wheeling Power interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. Not verified for Wheeling specifically: the AEP WV Net Metering Customer Information Guide v2.0 (eff. 02/01/2026; PowerClerk aep.powerclerk.com) is written for the APCo distribution system and does not name Wheeling Power. APCo and Wheeling Power share a joint WV tariff (P.S.C. W. Va. Tariff No. 16 APCo / No. 21 Wheeling, Net Metering Service sheets 26-x), so the same process is expected. Verify on first project with dgcoordinator-wv@aep.com that Wheeling Power applications go through aep.powerclerk.com.
Wheeling Power at a glance
Wheeling Power Co (American Electric Power)
TypeInvestor-owned utility
EIA utility ID20521
Residential customers34,202 (EIA-861, 2025)
Net-metered residential customers111 (EIA-861, 2025)
Service territory4 counties in West Virginia
How to applyPowerClerk – AEP PowerClerk · official link
Who submitsCustomer/installer via AEP PowerClerk; customer signs Application Fee Agreement. Contact dgcoordinator-wv@aep.com.
Export compensationNEM – Net Metering Service (Tariff N.M.S.)
WV 150CSR33; terms subject to PSC revision.
Test results accepted within 10 business days; documents reviewed within 10 business days; meter install/reprogram within 10 business days.
Documents Wheeling Power asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Proof of insuranceGeneral liability min $100,000, certificate of insurance
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetGenerator spec sheet
- Inverter spec sheetUL 1741SB
- Interconnection agreementUtility agreement signed by the customer, usually after review.
- Final inspection sign-offCertificate of Completion signed by AHJ or WV-licensed third-party inspector
- Photos (meter, main panel, equipment)Installation photos
How the Wheeling Power process runs
- Submit application in PowerClerk (UL1741SB literature, insurance, one-line).
- Sign Application Fee Agreement, pay invoice; review.
- Approval; sign Interconnection Agreement; Approval to Interconnect.
- Install; conformance testing; electrical inspection (AHJ or licensed inspector).
- Submit Certificate of Completion, photos.
- Company review (10 business days), meter exchange (10 business days).
- Permission to Operate; keep generator OFF until then.
Fees
| Fee | Applies to | Note |
|---|---|---|
| $30 | Level 1 (<=25 kW inverter) | |
| $50 + $1/kW | Level 2 |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Level 1 | 25 kW | |
| Level 2 | ||
| Net metering cap | 25 kW |
Max AC: residential 25 kW, commercial 500 kW, industrial 2 MW.
Sources
- AEP (Appalachian Power) West Virginia Net Metering Customer Information Guide 2026: https://www.appalachianpower.com/lib/docs/business/builders/WVNetMeteringGuide-2026.pdf (retrieved 2026-11-13)
West Virginia interconnection rule
Rule sections 1-8 read; interconnection levels, timelines, fees, insurance and disconnect are in Form No. 2/appendices which are PDFs not retrievable (LII links 404). Fill from WV PSC copy of 150CSR33 Form 2.
Public Service Commission of West Virginia
Interconnection ruleW. Va. Code R. 150-33 (Rules Governing Electric Utility Net Metering Arrangements and Interconnections), interconnection standards in Form No. 2 – Rules Governing Electric Utility Net Metering Arrangements and Interconnections · source
Applies toElectric utilities (electric distribution companies selling at retail in WV, per 150-33-2); coverage of cooperatives/municipal utilities not confirmed
Application formStandard net metering tariff (Form No. 1) and interconnection agreement/standards and technical requirements (Form No. 2) incorporated in the rule
FeesUtility may not impose any fee, equipment or insurance requirement unless authorized by the rules and in the approved tariff (150-33-3.7); customer pays incremental upgrade costs and requested tests/inspections (3.5).
InsuranceOnly as specifically authorized by the rules and included in the Commission-approved tariff (150-33-3.7); amounts in Form 2 not read.
Export compensationNEM – W. Va. Code 24-2F-8; W. Va. Code R. 150-33-3, 150-33-5
Customer-generator limits: residential 25 kW, commercial 500 kW, industrial 2 MW. First come first served until 3% of utility's prior-year peak demand (0.5% reserved for residential); utility may seek limit when DG exceeds 15% (3-phase) / 5% (1-phase) of line section peak.
Not determined from rule text.
- W. Va. Code R. 150-33-1 General: https://www.law.cornell.edu/regulations/west-virginia/W-Va-C-S-R-SS-150-33-1 (retrieved 2026-11-13)
- W. Va. Code R. 150-33-3 General Provisions: https://www.law.cornell.edu/regulations/west-virginia/W-Va-C-S-R-SS-150-33-3 (retrieved 2026-11-13)
- W. Va. Code R. 150-33-8 Interconnection Obligation: https://www.law.cornell.edu/regulations/west-virginia/W-Va-C-S-R-SS-150-33-8 (retrieved 2026-11-13)
- W. Va. Code R. 150-33-2 Definitions: https://www.law.cornell.edu/regulations/west-virginia/W-Va-C-S-R-SS-150-33-2 (retrieved 2026-11-13)
Other utilities in West Virginia
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.