Mon Power interconnection application

Mon Power is an investor-owned utility serving 334,336 residential customers in West Virginia (EIA-861, 2025). Applications: Own online portal (FirstEnergy Interconnection Portal). Gridpol files Mon Power interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Mon Power’s official sources (see below). Current WV net metering credit rate not verified.

Mon Power at a glance

Utility

Monongahela Power Co (FirstEnergy)

Type

Investor-owned utility

EIA utility ID

12796

Residential customers

334,336 (EIA-861, 2025)

Net-metered residential customers

1,090 (EIA-861, 2025)

Service territory

34 counties in West Virginia

How to apply

Own online portal – FirstEnergy Interconnection Portal · official link

Who submits

Customer or installer via online portal.

Export compensation

NEM – Net Energy Metering Rider (WV)
WV PSC 150CSR33; credit changes for applications after Jan 1, 2025 reported - verify current tariff.

Review time (official)

Per WV PSC rules 150CSR33.

Documents Mon Power asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Site plan / site layoutSame content rules as FE (north arrow, cross streets, disconnect, storage, transformer); no overhead internet photos Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Net metering / net billing agreementNet Metering Application
  • Interconnection agreementLevel 1 (Appendix E) or Level 2 (Appendix F)
  • Final inspection sign-offCertificate of Completion (Appendix D) / Certificate of Electrical Approval

How the Mon Power process runs

  1. Determine size/type.
  2. Submit application, site plan, one-line, fee in portal.
  3. Engineering review and notification.
  4. Install; local electrical inspection.
  5. Submit Interconnection Agreement + Certificate of Completion.
  6. Approval to Operate; do not energize before.
  7. Bi-directional meter installed (may take several weeks).

Fees

FeeApplies toNote
$30Level 1 (<=25 kW)
$50 + $1/kWLevel 2 (>25 kW)

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 125 kWinverter-based
Level 2>25 kW
Net metering cap25 kW

Net metering limits: residential 25 kW, commercial 500 kW, industrial 2,000 kW.

Storage, EV and stamps

Battery storage

Storage location and battery equipment must be on site plan/one-line. New IEEE 1547-2018 inverter settings required from Jan 1, 2024.

Common issues the utility lists

  • Overhead internet photos instead of site plan
  • Information incorrect or missing

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited