Investor-owned utilityPotomac Edison interconnection application
Potomac Edison is an investor-owned utility serving 396,593 residential customers in Maryland, West Virginia (EIA-861, 2025). Applications: Own online portal (FirstEnergy Interconnection Portal). Gridpol files Potomac Edison interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Potomac Edison’s official sources (see below). WV process (firstenergycorp.com/feconnect/westvirginia.html) not checked; storage-specific form for MD not confirmed.
Potomac Edison at a glance
The Potomac Edison Company (FirstEnergy)
TypeInvestor-owned utility
EIA utility ID15263
Residential customers396,593 (EIA-861, 2025)
Net-metered residential customers10,224 (EIA-861, 2025)
Service territory7 counties in Maryland, 8 counties in West Virginia
How to applyOwn online portal – FirstEnergy Interconnection Portal · official link
Who submitsCustomer or installer via online portal; since 2025-06-23 only portal applications accepted (no email/fax).
Export compensationNEM – Maryland Net Energy Metering Rider (COMAR 20.50.10)
standard meter does not register export; NEM application needed for bi-directional meter
Processed per COMAR 20.50.09 schedule (Level 1: completeness notice 5 business days, approval/PTO within 20 business days of acceptable documents).
Documents Potomac Edison asks for
- Interconnection application formLevel 1 (<=20 kW) or Level 2-4 application in portal Gridpol prepares this.
- Site plan / site layoutno overhead internet photos; property layout, north arrow, nearest cross streets, route/length of connection, DER AC disconnect location (visible-break for CT metering), generation/inverter/storage locations, service transformer Gridpol prepares this.
- Single-line diagram (one-line)energy source with DC/AC ratings, inverter AC rating, disconnect make/model and lockable visible break, connection point, utility meter, inverter and battery equipment Gridpol prepares this.
- Net metering / net billing agreement (when applicable)Net Energy Metering Rider Application
- Interconnection agreementafter installation
- Final inspection sign-offCertificate of Completion with electrical inspection evidence
How the Potomac Edison process runs
- Determine size/type and application level (online portal determines level from data entered)
- Submit application with site plan and one-line diagram in the FirstEnergy Interconnection Portal; pay fee online
- Engineering review; customer notified by email/phone: approved, upgrade+fee required, or information missing/incorrect
- Install per approved application and FirstEnergy interconnection requirements
- Submit signed Interconnection Agreement with Certificate of Completion and evidence of electrical inspection
- Company final review, possible witness test, Approval to Operate (do not energize before)
- Company replaces meter with bi-directional net meter (may take several weeks; excess not credited until installed)
Fees
| Fee | Applies to | Note |
|---|---|---|
| $0 | MD Level 1 (<=20 kW inverter-based) | fee structure effective 2025-11-06 |
| $50 + $1/kW | MD Level 2 | |
| $100 + $2/kW | MD Level 3 & 4 | non-residential Level 4 study fees per COMAR 20.50.09.12 |
| $300 | Pre-application |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Level 1 | 20 kW | inverter-based |
| Level 2-4 | 10000 kW | >20 kW |
| Net metering cap | 2000 kW |
MD: interconnection limit 10,000 kW; NEM limit 2,000 kW (biomass, solar, wind)
Storage, EV and stamps
Battery storage
Site plan and one-line must show storage (battery) equipment; Limited Export Agreements guidance available for MD.
Common issues the utility lists
- Application not completed correctly
- Drawings/documentation missing
- Fees not determined/paid
- Overhead internet photos submitted instead of a site plan
- Design inconsistent with company policy/state requirements
Gridpol’s pre-submission check covers these before we file.
Sources
- FirstEnergy Maryland Interconnection (Potomac Edison): https://firstenergycorp.com/feconnect/maryland.html (retrieved 2026-11-13)
- COMAR 20.50.09.09: https://regs.maryland.gov/us/md/exec/comar/20.50.09.09 (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.