Home › Utilities › West Virginia › City of New Martinsville
Municipal utilityCity of New Martinsville interconnection application
City of New Martinsville is a municipal utility serving 1,740 customers in West Virginia (EIA-861, 2025). Gridpol files City of New Martinsville interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
West Virginia’s commission rule (W. Va. Code R. 150-33 (Rules Governing Electric Utility Net Metering Arrangements and Interconnections), interconnection standards in Form No. 2) does not bind municipal utilitys; City of New Martinsville sets its own interconnection policy. We confirm its form on the first project. Not determined from rule text.
City of New Martinsville at a glance
City of New Martinsville
TypeMunicipal utility
EIA utility ID13471
Customers1,740 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory1 county in West Virginia
Documents City of New Martinsville asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for City of New Martinsville. We confirm City of New Martinsville’s exact list on the first project.
West Virginia interconnection rule
Rule sections 1-8 read; interconnection levels, timelines, fees, insurance and disconnect are in Form No. 2/appendices which are PDFs not retrievable (LII links 404). Fill from WV PSC copy of 150CSR33 Form 2.
Public Service Commission of West Virginia
Interconnection ruleW. Va. Code R. 150-33 (Rules Governing Electric Utility Net Metering Arrangements and Interconnections), interconnection standards in Form No. 2 – Rules Governing Electric Utility Net Metering Arrangements and Interconnections · source
Applies toElectric utilities (electric distribution companies selling at retail in WV, per 150-33-2); coverage of cooperatives/municipal utilities not confirmed
Application formStandard net metering tariff (Form No. 1) and interconnection agreement/standards and technical requirements (Form No. 2) incorporated in the rule
FeesUtility may not impose any fee, equipment or insurance requirement unless authorized by the rules and in the approved tariff (150-33-3.7); customer pays incremental upgrade costs and requested tests/inspections (3.5).
InsuranceOnly as specifically authorized by the rules and included in the Commission-approved tariff (150-33-3.7); amounts in Form 2 not read.
Export compensationNEM – W. Va. Code 24-2F-8; W. Va. Code R. 150-33-3, 150-33-5
Customer-generator limits: residential 25 kW, commercial 500 kW, industrial 2 MW. First come first served until 3% of utility's prior-year peak demand (0.5% reserved for residential); utility may seek limit when DG exceeds 15% (3-phase) / 5% (1-phase) of line section peak.
Not determined from rule text.
- W. Va. Code R. 150-33-1 General: https://www.law.cornell.edu/regulations/west-virginia/W-Va-C-S-R-SS-150-33-1 (retrieved 2026-11-13)
- W. Va. Code R. 150-33-3 General Provisions: https://www.law.cornell.edu/regulations/west-virginia/W-Va-C-S-R-SS-150-33-3 (retrieved 2026-11-13)
- W. Va. Code R. 150-33-8 Interconnection Obligation: https://www.law.cornell.edu/regulations/west-virginia/W-Va-C-S-R-SS-150-33-8 (retrieved 2026-11-13)
- W. Va. Code R. 150-33-2 Definitions: https://www.law.cornell.edu/regulations/west-virginia/W-Va-C-S-R-SS-150-33-2 (retrieved 2026-11-13)
Other utilities in West Virginia
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.