Electric cooperativeColumbia Rural Electric Association, Inc. interconnection application
Columbia Rural Electric Association, Inc. is an electric cooperative serving 4,510 residential customers in Oregon, Washington (EIA-861, 2025). Gridpol files Columbia Rural Electric Association, Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Washington’s commission rule (WAC 480-108 (480-108-001 to -999)) does not bind electric cooperatives; Columbia Rural Electric Association, Inc. sets its own interconnection policy. We confirm its form on the first project. Consumer-owned utilities (PUDs, munis, coops) must offer net metering under RCW 80.60 (<=100 kW) and may adopt their own additional safety/power-quality/interconnection requirements by governing-body action after notice and comment (RCW 80.60.040(2)), but may not require extra standards, tests or liability insurance for compliant systems (80.60.040(3)).
Columbia Rural Electric Association, Inc. at a glance
Columbia Rural Elec Assn, Inc
TypeElectric cooperative
EIA utility ID4041
Residential customers4,510 (EIA-861, 2025)
Net-metered residential customers206 (EIA-861, 2025)
Service territory1 county in Oregon, 2 counties in Washington
Documents Columbia Rural Electric Association, Inc. asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Columbia Rural Electric Association, Inc.. We confirm Columbia Rural Electric Association, Inc.’s exact list on the first project.
Washington interconnection rule
Washington Utilities and Transportation Commission (UTC)
Interconnection ruleWAC 480-108 (480-108-001 to -999) – Electric companies - Interconnection with electric generators · source
Applies toUTC-regulated electrical companies (investor-owned: PSE, Avista, PacifiCorp) for customer generating facilities up to 20 MW; excludes PURPA QFs under WAC 480-107. Not binding on PUDs, munis, coops.
Application formUtility-specific standard application form filed with the UTC and posted on the utility website, internet submission where practical (WAC 480-108-030(1)); must be signed and complete.
TimelinesReceipt notice 5 business days; completeness notice 10 business days; cure 15 business days (Tier 1-2) / 30 (Tier 3); Tier 1 decision 20 BD, Tier 2 30 BD; agreement with approval (Tier 1) or within 5 BD (Tier 2); operation within 1 year of approval (Tier 1-2). Completion requires certificate of completion with permits, electrical inspector approval; utility may witness test (WAC 480-108-050).
FeesNonrefundable application fee caps: $100 (0-25 kW), $500 (26-500 kW), $1,000 (>500 kW-20 MW) (WAC 480-108-030(5)).
InsuranceNo additional insurance necessary for generating facility under 100 kW (WAC 480-108-040(14)); RCW 80.60.040(3) bars utilities from requiring net-metering customers to buy additional liability insurance.
External disconnectTier 1: lockable disconnect not required for certified inverter systems on self-contained meter <=320 A unless L&I requires it (WAC 480-108-020(2)(a)(iv)). Tier 2: visible lockable AC disconnect required but utility may waive for inverter-based systems.
Export compensationNEM – RCW 80.60
Applies to all electric utilities incl. PUDs, munis, coops. Offer required until earlier of 2029-06-30 or 4% of utility's 1996 peak; utilities may then file successor tariff (UTC approval for IOUs).
Consumer-owned utilities (PUDs, munis, coops) must offer net metering under RCW 80.60 (<=100 kW) and may adopt their own additional safety/power-quality/interconnection requirements by governing-body action after notice and comment (RCW 80.60.040(2)), but may not require extra standards, tests or liability insurance for compliant systems (80.60.040(3)).
- WAC 480-108: https://app.leg.wa.gov/wac/default.aspx?cite=480-108&full=true (retrieved 2026-11-13)
- RCW 80.60 Net metering: https://app.leg.wa.gov/rcw/default.aspx?cite=80.60&full=true (retrieved 2026-11-13)
Other utilities in Washington
- Puget Sound Energy (PSE)1,104,338
- Seattle City Light472,309
- Snohomish County PUD349,905
- Avista Utilities247,159
- Clark Public Utilities223,119
- Tacoma Power (Tacoma Public Utilities)177,554
- Rocky Mountain Power (UT, ID, WY) / Pacific Power (OR, WA, CA)114,998
- PUD No 1 of Benton County50,835
- PUD No 1 of Cowlitz County48,849
- PUD No 2 of Grant County43,160
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.