Public power districtSnohomish County PUD interconnection application
Snohomish County PUD is a public power district serving 349,905 residential customers in Washington (EIA-861, 2025). Applications: Own online portal (Interconnection Application and Net Metering Agreement (Adobe Sign web form)). Gridpol files Snohomish County PUD interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Snohomish County PUD’s official sources (see below).
Snohomish County PUD at a glance
PUD No 1 of Snohomish County
TypePublic power district
EIA utility ID17470
Residential customers349,905 (EIA-861, 2025)
Net-metered residential customers5,189 (EIA-861, 2025)
Service territory2 counties in Washington
How to applyOwn online portal – Interconnection Application and Net Metering Agreement (Adobe Sign web form) · official link
Who submitsInstaller or DIY customer fills in the Adobe Sign application and attaches documents; on submit enters customer's email; PUD customer then initials the application and signs the Net Metering Agreement before it goes to the PUD.
Export compensationNEM – Net metering (RCW 80.60)
Review time (official)Allow up to 2 weeks for application processing.
Documents Snohomish County PUD asks for
- Interconnection application formInterconnection Application (Adobe Sign web form) Gridpol prepares this.
- Net metering / net billing agreementNet Metering Agreement signed by customer
- Single-line diagram (one-line)Wiring/one-line diagram incl. existing generation at site Gridpol prepares this.
- PV module spec sheetSpec sheets
- UL 1741 / IEEE 1547 certificationUL certifications
- Customer signatureCustomer initials application and signs NMA via Adobe Sign
- Final inspection sign-offLocal jurisdiction / L&I electrical permit finaled before Notice of Completion
- Other utility-specific documentNotice of Completion (Adobe Sign form) after install
How the Snohomish County PUD process runs
- Submit Interconnection Application and Net Metering Agreement with documents (customer signs via Adobe Sign)
- PUD review (up to 2 weeks); 'Approval to Construct' email; $85 fee to PUD account
- Install per PUD ESR Section 6, codes, permits; PUD installs AMI meter if not present
- Electrical permit finaled by local jurisdiction/L&I
- Submit Notice of Completion
- 'Permission to Operate' email
Fees
| Fee | Applies to | Note |
|---|---|---|
| $85 | Net metering interconnection < 100 kW | Charged to PUD account after approval |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Standardized small net-metered | 77 kW | Single-phase 120/240 V secondary, self-contained meter |
| Net metering | 100 kW | Projects 78 kW and greater must be three-phase |
| Net metering cap | 100 kW |
Larger resources follow separate process (ESR Section 6, Form 6-1/6-2).
Storage, EV and stamps
Battery storage
Process also applies to adding/only installing a battery, including bi-directional EV chargers. Standby/backup generation and batteries in parallel must meet Standby Generation requirements (ESR Section 6).
EV chargers
Bi-directional EV chargers follow the same interconnection process as batteries.
Common issues the utility lists
- Customer email entered incorrectly by installer so customer never receives signing request
Gridpol’s pre-submission check covers these before we file.
Sources
- Snohomish PUD Rooftop Solar Installation & Interconnecting: https://www.snopud.com/save-energy/solar/rooftop/installation-interconnecting/ (retrieved 2026-11-13)
- Snohomish PUD Interconnection Application & Net Metering Agreement Workflow: https://www.snopud.com/wp-content/uploads/2023/05/NetMeteringWorkflow.pdf (retrieved 2026-11-13)
- Snohomish PUD Electrical Service Requirements Section 6 Generation Interconnection: https://esr.snopud.com/Content/6_gen/6_Gen_Int.htm (retrieved 2026-11-13)
Other utilities in Washington
- Puget Sound Energy (PSE)1,104,338
- Seattle City Light472,309
- Avista Utilities247,159
- Clark Public Utilities223,119
- Tacoma Power (Tacoma Public Utilities)177,554
- Rocky Mountain Power (UT, ID, WY) / Pacific Power (OR, WA, CA)114,998
- PUD No 1 of Benton County50,835
- PUD No 1 of Cowlitz County48,849
- PUD No 2 of Grant County43,160
- PUD No 1 of Chelan County42,571
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.