Home › Utilities › Washington › Tacoma Power (Tacoma Public Utilities)
Municipal utilityTacoma Power (Tacoma Public Utilities) interconnection application
Tacoma Power (Tacoma Public Utilities) is a municipal utility serving 177,554 residential customers in Washington (EIA-861, 2025). Applications: Own online portal (Tacoma Power Solar Application and Interconnection Agreement (DocuSign PowerForm)). Gridpol files Tacoma Power (Tacoma Public Utilities) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Tacoma Power (Tacoma Public Utilities)’s official sources (see below). Fees and review timelines not published; current DocuSign form attachment list not visible; verify on first project.
Tacoma Power (Tacoma Public Utilities) at a glance
City of Tacoma
TypeMunicipal utility
EIA utility ID18429
Residential customers177,554 (EIA-861, 2025)
Net-metered residential customers2,960 (EIA-861, 2025)
Service territory4 counties in Washington
How to applyOwn online portal – Tacoma Power Solar Application and Interconnection Agreement (DocuSign PowerForm) · official link
Who submitsContractor obtains electrical permit from Tacoma Power and submits the Solar Application and Interconnection Agreement; owner-occupant doing own electrical work may apply for permit directly.
Export compensationNEM – Net metering (Net Meter Bank)
Excess credited to Net Meter Bank; resets March 31 each year. Advanced meter required; no separate production meter required for new installs; moved to monthly billing.
Documents Tacoma Power (Tacoma Public Utilities) asks for
- Interconnection application formSolar Application and Interconnection Agreement (earlier PDF form: Net Metering Application <100 kW, 10-2019) Gridpol prepares this.
- Single-line diagram (one-line)One-line schematic showing modules, inverters, production/net meters, lockable visible AC disconnect, storage and other components Gridpol prepares this.
- Inverter spec sheetManufacturer cut-sheet showing UL 1741 listing
- Customer signatureInterconnection customer signs, agreeing to Net Energy Metering Interconnection Agreement terms
- Final inspection sign-offTacoma Power electrical permit (obtained before application) and inspection
How the Tacoma Power (Tacoma Public Utilities) process runs
- Choose licensed, bonded, insured contractor
- Contractor applies for Tacoma Power electrical permit
- Contractor submits Solar Application and Interconnection Agreement with supporting documents
- Install to Tacoma Power Electrical Construction Standards and pass inspection
- Interconnection to grid / net metering
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Net metering | 100 kW | |
| Net metering cap | 100 kW |
Storage, EV and stamps
Battery storage
Storage must be shown on the one-line diagram.
Sources
- Tacoma Power Solar: https://www.mytpu.org/community-environment-parks/solar/ (retrieved 2026-11-13)
- Tacoma Power Solar and Net Metering FAQs: https://www.mytpu.org/community-environment-parks/solar/solar-and-net-metering-faqs/ (retrieved 2026-11-13)
- Tacoma Power Net Metering Application less than 100 kW (10-2019): https://www.mytpu.org/wp-content/uploads/Net-metering-application-less-than-100kW_Oct-19.pdf (retrieved 2026-11-13)
Other utilities in Washington
- Puget Sound Energy (PSE)1,104,338
- Seattle City Light472,309
- Snohomish County PUD349,905
- Avista Utilities247,159
- Clark Public Utilities223,119
- Rocky Mountain Power (UT, ID, WY) / Pacific Power (OR, WA, CA)114,998
- PUD No 1 of Benton County50,835
- PUD No 1 of Cowlitz County48,849
- PUD No 2 of Grant County43,160
- PUD No 1 of Chelan County42,571
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.