Virginia

Virginia interconnection applications

32 electric utilities serve Virginia (EIA-861, 2025): 3 investor-owned utilitys, 13 electric cooperatives, 15 municipal utilitys, 1 state power authority. Together they serve 3,620,392 residential customers; 74,360 residential customers were on net metering at year-end 2025.

Largest utilities in Virginia

Dominion Energy Virginia / Dominion Energy North CarolinaProcess verified

Investor-owned utility · 2,517,958 residential customers · Virginia

Applications: Own online portal – Dominion Energy Net Metering Customer Self-Service Portal (online NMIN form, Salesforce)

Interconnection process and documents →
Appalachian Power (APCo)Process verified

Investor-owned utility · 815,235 residential customers · Virginia

Applications: PowerClerk – AEP PowerClerk

Interconnection process and documents →
Rappahannock Electric Cooperative (REC)Process verified

Electric cooperative · 172,883 residential customers · Virginia

Applications: PowerClerk – REC Net Metering application (PowerClerk)

Interconnection process and documents →
NOVECPartly researched

Electric cooperative · 169,027 residential customers · Virginia

Applications: PDF + email – Email to NOVEC net metering / system metering department

Interconnection process and documents →
Shenandoah Valley Electric CooperativeState rule applies

Electric cooperative · 86,656 residential customers · Virginia

Interconnection process and documents →
Southside Electric Cooperative, Inc.State rule applies

Electric cooperative · 57,305 residential customers · Virginia

Interconnection process and documents →
City of DanvilleState guidance

Municipal utility · 38,226 residential customers · Virginia

Interconnection process and documents →
Central Virginia Electric CooperativeState rule applies

Electric cooperative · 35,353 residential customers · Virginia

Interconnection process and documents →
A & N Electric CooperativeState rule applies

Electric cooperative · 33,261 residential customers · Virginia

Interconnection process and documents →
Mecklenburg Electric CooperativeState rule applies

Electric cooperative · 30,215 residential customers · Virginia

Interconnection process and documents →
KUProcess verified

Investor-owned utility · 476,780 residential customers · Virginia

Applications: PDF + email – LG&E/KU Net Metering group

Interconnection process and documents →
Northern Neck Electric Cooperative, Inc.State rule applies

Electric cooperative · 18,199 residential customers · Virginia

Interconnection process and documents →

Export compensation among the researched Virginia utilities: NEM, Net billing. Rules differ by utility – see each utility page.

Virginia interconnection rule

Commission

Virginia State Corporation Commission

Interconnection rule

20VAC5-315 (Regulations Governing Net Energy Metering, incl. interconnection of net metering facilities); 20VAC5-314 (Interconnection of Small Electrical Generators and Storage, for non-net-metered) – Regulations Governing Net Energy Metering · source

Applies to

Electric distribution companies: investor-owned (Dominion, Appalachian Power) and electric cooperatives; 20VAC5-314 does not apply to net metering customers (they follow 20VAC5-315)

Application form

Commission-approved net metering notification form (or identical utility electronic system) signed by customer, licensed electrician and vendor (20VAC5-315-30/40); non-NEM: Level 1 Interconnection Request Form (Schedule 5) <=500 kW

Timelines

Net metering: residential customer must notify before construction and get approval before interconnecting; utility has 30 days (nonresidential 60 days) from notification (third day after mailing) to determine compliance (20VAC5-315-30).

Fees

Net metering: no application fee in rule; up to $50 per generator for inverter-settings inspection (>10 kW) or protective settings inspection; standby charges only for Phase II utility residential >15 kW (20VAC5-315-40/50).

Insurance

Net metering: <=10 kW at least $100,000 liability (homeowners/commercial); >10 kW at least $300,000; no higher limits or additional policies may be required (20VAC5-315-60). Non-NEM (314-160): $100k <=10 kW, $300k <=500 kW, $2M >500 kW.

External disconnect

Lockable, utility-accessible, load-breaking manual disconnect switch only if required by the utility's tariff; electrician certifies installation on the notification form (20VAC5-315-40 A 2-3).

Export compensation

NEM – Va. Code 56-594, 56-594.01, 56-594.2; 20VAC5-315
Monthly netting at retail rate under same tariff as non-NEM customers; 12-month net metering period. Recent SCC proceedings revising Dominion/APCo net metering not verified here.

Not bound by the rule

Electric cooperatives are covered (20 kW residential / 1 MW nonresidential). Municipal utilities are not SCC-regulated and set their own policies.

LevelUp toCriteria / review / fee
Net metering - residential25 kWIOU residential <=25 kW (coop residential <=20 kW) · Utility determines compliance within 30 days of notification · Inverter-settings inspection max $50 per generator if >10 kW
Net metering - nonresidential3000 kWIOU nonresidential <=3 MW (coop <=1 MW) · 60 days of notification · max $50 inspection per generator
20VAC5-314 Level 1 (non-NEM)500 kWCertified SGF <=500 kW · Receipt 3 BD; deficiencies 10 BD; evaluation 15 BD · $100 processing fee
20VAC5-314 Levels 2/3 (non-NEM)Larger or failing Level 1 · $500 / $1,000 processing fees
Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.