Home › Utilities › Virginia › Rappahannock Electric Cooperative (REC)
Electric cooperativeRappahannock Electric Cooperative (REC) interconnection application
Rappahannock Electric Cooperative (REC) is an electric cooperative serving 172,883 residential customers in Virginia (EIA-861, 2025). Applications: PowerClerk (REC Net Metering application (PowerClerk)). Gridpol files Rappahannock Electric Cooperative (REC) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Rappahannock Electric Cooperative (REC)’s official sources (see below). Portal (PowerClerk), steps and required post-install documents confirmed from REC net metering page and guide. Gaps: PowerClerk form fields/required attachments (one-line, spec sheets) not visible without login; no REC battery-specific rules found.
Rappahannock Electric Cooperative (REC) at a glance
Rappahannock Electric Coop
TypeElectric cooperative
EIA utility ID40228
Residential customers172,883 (EIA-861, 2025)
Net-metered residential customers3,964 (EIA-861, 2025)
Service territory22 counties in Virginia
How to applyPowerClerk – REC Net Metering application (PowerClerk) · official link
Who submitsContractor/solar vendor submits the net metering application in PowerClerk on the member's behalf unless the member self-installs; vendor or self-installer completes electrician info later. Final application signed via DocuSign by member, vendor and licensed electrician. Applies to owned and leased systems.
Export compensationNEM – Schedule NEM-10A Net Energy Metering Rider (eff. Oct 18, 2023)
Monthly excess carried forward as kWh credit; optional PPA pays excess after 12 months at REC avoided wholesale cost (~30-40% of retail energy rate); without PPA no payout of banked kWh at account closure. Lockable AC disconnect per REC Acceptable Solar Disconnect Qualifications (2026).
REC has 30 days to review and approve the application or return it for corrections (REC net metering page; VA rule 20VAC5-315-30: 30 days residential, 60 days non-residential).
Wholesale supplier / associationOld Dominion Electric Cooperative · Virginia SCC Regulations Governing Net Energy Metering, 20VAC5-315 (state rule; not published by ODEC)
Documents Rappahannock Electric Cooperative (REC) asks for
- Interconnection application formNet metering application in PowerClerk (replaces former paper SCC Form NMIN submission); must be approved before any installation Gridpol prepares this.
- Final inspection sign-offAfter install: licensed Virginia electrician certification and/or local (county) inspection; vendor enters electrician info and uploads proof of passed inspection in PowerClerk
- Customer signatureFinal net metering application signed via DocuSign by member, vendor and electrician
- UL 1741 / IEEE 1547 certificationVA rule 20VAC5-315-40: generator must meet UL 1741/IEEE 1547 (certified on notification)
- Proof of insuranceVA rule 20VAC5-315-60: liability insurance >= $100,000 for <=10 kW AC; >= $300,000 for >10 kW AC
- Other utility-specific document (when applicable)Optional Net Metering Power Purchase Agreement with REC to be paid for excess generation after 12 months
How the Rappahannock Electric Cooperative (REC) process runs
- Apply: vendor (or self-installer) submits net metering application in PowerClerk; REC emails receipt confirmation to member and vendor
- REC reviews within 30 days; emails Approval to Install - no equipment installed before approval
- Install per state, county and electric codes with REC-acceptable lockable AC disconnect
- Electrician certification / county inspection; vendor enters electrician info and uploads inspection proof in PowerClerk
- After REC approves certification, final application signed via DocuSign by member, vendor and electrician
- REC interconnection inspection; if passed, net meter installed ($50 fee >10 kW AC)
- Permission to Operate email with official PTO letter after metering/billing work
Fees
| Fee | Applies to | Note |
|---|---|---|
| $50 | Net metering projects >10 kW AC | interconnection inspection fee (REC net metering page; Schedule NEM-10A) |
| actual cost | Distribution improvements if needed | billed per engineering time, material and construction |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Residential | 20 kW | 20 kW nameplate AC |
| Non-residential | 1000 kW | 1 MW nameplate AC |
| Net metering cap | 20 kW |
System may not be projected to produce more than 100% of the member's past 12 months of billing history (or annualized). Program capacity by class shown on REC page (Nov 2026: residential 12,450 kW, nonresidential 5,807 kW, nonprofit/non-jurisdictional 19,290 kW available).
Storage, EV and stamps
Battery storage
No REC-specific battery rules found; REC FAQ notes only an energy storage system can supply the home during outages. Generator transfer switches/meter collars are not compatible with net metering (no non-REC-approved devices in meter base).
Common issues the utility lists
- Application incomplete or not meeting requirements - returned for corrections
- Failed REC interconnection inspection (door hanger notes pass/fail)
- Non-REC-approved meter collars or devices in meter base
- System projected to exceed 100% of past 12-month usage or class size limits
Gridpol’s pre-submission check covers these before we file.
Sources
- REC Net Metering (steps, sizing, fees, FAQ): https://myrec.coop/net-metering (retrieved 2026-11-13)
- REC Welcome to Net Metering guide (July 2025): https://myrec.coop/sites/default/files/documents/Welcome_to_Net_Metering.pdf (retrieved 2026-11-13)
- REC Acceptable Solar Disconnect Qualifications (Feb 2026): https://myrec.coop/sites/default/files/2026-02/Acceptable%20Solar%20Disconnect%20Qualifications%202.2.2026.pdf (retrieved 2026-11-13)
- REC How To Proceed (archive.org capture 2024-04-13; links PowerClerk): https://web.archive.org/web/20240413033905/https://myrec.coop/how-proceed (retrieved 2026-11-13)
- REC Schedule NEM-10A Net Energy Metering Rider (2023): https://myrec.coop/sites/default/files/documents/Governance%20Center/NET%20ENERGY%20METERING%20RIDER%202023.pdf (retrieved 2026-11-13)
- 20VAC5-315-30 Company notification (VA SCC net metering rules): https://law.lis.virginia.gov/admincode/title20/agency5/chapter315/section30/ (retrieved 2026-11-13)
- 20VAC5-315-40 Conditions of interconnection: https://law.lis.virginia.gov/admincode/title20/agency5/chapter315/section40/ (retrieved 2026-11-13)
- 20VAC5-315-60 Liability insurance: https://law.lis.virginia.gov/admincode/title20/agency5/chapter315/section60/ (retrieved 2026-11-13)
Other utilities in Virginia
- Dominion Energy Virginia / Dominion Energy North Carolina2,408,901
- Appalachian Power (APCo)467,581
- NOVEC169,027
- Shenandoah Valley Electric Cooperative86,656
- Southside Electric Cooperative, Inc.57,305
- City of Danville38,226
- Central Virginia Electric Cooperative35,353
- A & N Electric Cooperative33,035
- Mecklenburg Electric Cooperative30,077
- KU22,759
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.